Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Chestnut Rd
Pretoria Rd /
Rd Crossing
Rhodesfield
Interchange
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Ardeer Rd
Alignment
Deviation
Deviation
Crossing
Closure
Closure
Andre
K115
Antwerp /
ITEM DESCRIPTION BUDGET TOTAL
1500 Accommodation of Traffic 3,627,385.00 1,035,650.00 49,680.00 84,300.00 0.00 45,300.00 121,960.00 360,340.00 35,320.00 50,400.00 10,080.00 6,990.00 14,080.00 48,600.00 48,600.00 160,000.00
2200 Prefabricated Culverts 2,305,617.42 1,388,500.00 581,270.00 0.00 38,500.00 1,250.00 18,175.00 0.00 22,000.00 424,260.00 259,440.00 0.00 0.00 8,500.00 7,550.00 27,555.00
2300 Concrete kerbing and Channeling 1,295,493.24 1,285,410.00 569,220.00 0.00 108,300.00 4,500.00 31,650.00 0.00 50,400.00 221,640.00 149,040.00 31,500.00 10,500.00 27,000.00 45,000.00 36,660.00
3300 Mass Earthworks 3,136,659.53 1,998,114.45 753,996.95 59,203.00 212,063.55 6,979.00 102,583.00 0.00 17,398.00 431,021.05 277,324.60 9,868.50 2,214.50 34,349.20 3,514.80 87,598.30
3400 Pavement Layers of Gravel Material 1,400,286.99 1,161,878.00 283,088.00 49,830.00 54,532.00 210,306.00 66,716.00 0.00 72,312.00 259,616.00 50,012.00 54,318.00 8,978.00 12,100.00 16,062.00 24,008.00
3500 Stabilisation 612,595.81 559,155.00 195,532.00 0.00 47,301.00 0.00 0.00 0.00 0.00 245,612.00 31,432.00 0.00 0.00 9,428.00 10,384.00 19,466.00
3600 Crushed Stone Base 2,956,279.43 1,266,210.00 0.00 0.00 151,800.00 0.00 0.00 0.00 0.00 776,820.00 166,320.00 0.00 0.00 49,830.00 52,140.00 69,300.00
3800 Breaking up Existing Pavement 571,907.75 1,061,650.00 2,690.00 168,000.00 34,500.00 32,570.00 161,420.00 0.00 0.00 1,200.00 7,600.00 636,930.00 1,500.00 3,130.00 8,077.50 4,032.50
4100 Prime coat 170,529.40 198,290.00 72,200.00 3,920.00 10,725.00 16,295.00 5,315.00 0.00 6,020.00 54,935.00 11,760.00 4,515.00 755.00 3,520.00 3,675.00 4,655.00
4200 Asphalt Surfacing & Base 6,379,093.72 4,280,281.90 1,699,983.90 75,460.00 364,882.00 211,054.00 90,677.00 0.00 120,790.00 791,928.00 364,020.00 89,665.00 40,564.00 131,698.00 135,950.00 163,610.00
5100 Pitching & Stonework etc 173,446.79 175,193.00 25,400.00 0.00 4,480.00 0.00 48,970.00 0.00 2,000.00 32,133.00 6,360.00 0.00 0.00 500.00 6,400.00 48,950.00
5200 Gabions 36,250.20 47,725.00 30,205.00 0.00 0.00 0.00 0.00 0.00 0.00 11,680.00 5,840.00 0.00 0.00 0.00 0.00 0.00
5400 Guardrails 243,833.60 295,077.50 65,350.00 3,445.00 81,600.00 0.00 54,207.50 0.00 0.00 27,100.00 20,500.00 0.00 0.00 0.00 0.00 42,875.00
5500 Fencing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5600 Road Signs 883,306.68 557,260.00 11,525.00 0.00 1,590.00 0.00 0.00 0.00 506,590.00 23,685.00 0.00 1,590.00 380.00 1,230.00 10,670.00 0.00
5700 Road Markings 181,890.00 180,300.00 49,750.00 0.00 3,750.00 0.00 3,000.00 0.00 0.00 33,300.00 24,500.00 0.00 0.00 21,500.00 22,000.00 22,500.00
5800 Landscapping & Grassing 761,129.00 1,223,375.00 462,246.00 29,165.00 66,420.00 89,565.00 126,500.00 56,101.00 8,300.00 168,091.00 103,790.00 68,535.00 1,175.00 22,425.00 6,401.00 14,661.00
5900 Finishing the Road and Road Reserve 29,497.13 34,500.00 12,000.00 0.00 3,000.00 0.00 0.00 0.00 3,000.00 4,500.00 4,500.00 2,250.00 750.00 750.00 1,500.00 2,250.00
6700 Structural Steelwork 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7400 Systems 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 24,765,201.69 16,748,569.85 4,864,136.85 473,323.00 1,183,443.55 617,819.00 831,173.50 416,441.00 844,130.00 3,557,921.05 1,492,518.60 906,161.50 80,896.50 374,560.20 377,924.30 728,120.80
Modderfontein Rd
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Chestnut Rd
Pretoria Rd /
Rhodesfield
TOTAL QTY
Interchange
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Crossing
Closure
Closure
Andre
K115
Antwerp /
UNIT RATE RATE
ITEM DESCRIPTION
TOTAL 1,035,650.00 3,627,385.00 49,680.00 84,300.00 0.00 45,300.00 121,960.00 360,340.00 35,320.00 50,400.00 10,080.00 6,990.00 14,080.00 48,600.00 48,600.00 160,000.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Alignment
Lovato Rd
Lovato Rd
Alignment
Ardeer Rd
Deviation
AMOUNT
AMOUNT
AMOUNT
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
m
(a) 600mm diameter concrete pipe 20.00 350.00 7,000.00 65.11 1,302.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20 7,000.00
m
(b) 900mm diameter concrete pipe 0.00 0.00 87.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B22.17 MANHOLES AND CATCHPITS 0.00
(a) Manholes No 0.00 6,000.00 0.00 3,976.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Catchpits No 0.00 6,000.00 0.00 3,976.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(c) Kerb Inlets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i) 3 bay (3m) No 43.00 5,500.00 236,500.00 5,000.00 215,000.00 2 11,000.00 0.00 7 38,500.00 0.00 0.00 0.00 4 22,000.00 24 132,000.00 4 22,000.00 0.00 0.00 1 5,500.00 0.00 1 5,500.00
(ii) 4 bay (4m) No 7.00 6,500.00 45,500.00 7,500.00 52,500.00 4 26,000.00 0.00 0.00 0.00 1 6,500.00 0.00 0.00 0.00 2 13,000.00 0.00 0.00 0.00 0.00 0.00
(d) Headwalls 0.00
No
(i) Single for 600mm diameter pipe 14.00 3,500.00 49,000.00 850.00 11,900.00 10 35,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4 14,000.00 0.00 0.00 0.00 0.00 0.00
(ii) Single for 900mm diameter pipe No 4.00 4,500.00 18,000.00 1,200.00 4,800.00 4 18,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 1,388,500.00 2,305,617.42 581,270.00 0.00 38,500.00 1,250.00 18,175.00 0.00 22,000.00 424,260.00 259,440.00 0.00 0.00 8,500.00 7,550.00 27,555.00
PRELIMINARY
DP4 QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Chestnut Rd
Pretoria Rd /
Realignment
Rd Crossing
Interchange
Rhodesfield
TOTAL QTY
Douglas Rd
Cresslawn
Alignment
Alignment
Lovato Rd
Lovato Rd
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 2300 CONCRETE KERBING AND CHANNELLING
23.01 CONCRETE KERBING
(a) Barrier and / or mountable kerbing complete m 136.00 90.00 12,240.00 110.79 15,067.44 32.00 2,880.00 0.00 0.00 50.00 4,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 4,860.00
CONCRETE KERBING CHANNELLING
23.02 0.00
COMBINATIONS
(a) Barrier and / or mountable kerbing and
1,174,050.00 151.24 1,183,755.48 523,500.00 0.00 97,800.00 0.00 29,550.00 0.00 42,000.00 191,400.00 144,000.00 31,500.00 10,500.00 27,000.00 45,000.00 31,800.00
channelling complete m 7,827.00 150.00 3,490.00 652.00 197.00 0.00 280.00 1,276.00 960.00 210.00 70.00 180.00 300.00 212.00
23.03 CONCRETE CHUTES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(a) Prefabricated class 20/19 concrete chutes down 99,120.00 204.81 96,670.32 42,840.00 0.00 10,500.00 0.00 2,100.00 0.00 8,400.00 30,240.00 5,040.00 0.00 0.00 0.00 0.00 0.00
slide slopes complete as shown in the drawings….. m 472.00 210.00 204.00 50.00 10.00 40.00 144.00 24.00
TOTAL 1,285,410.00 1,295,493.24 569,220.00 0.00 108,300.00 4,500.00 31,650.00 0.00 50,400.00 221,640.00 149,040.00 31,500.00 10,500.00 27,000.00 45,000.00 36,660.00
PRELIMINARY
DP4 QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Rhodesfield
Interchange
Douglas Rd
TOTAL QTY
Cresslawn
Alignment
Lovato Rd
Lovato Rd
Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 3300 MASS EARTHWORKS
CUT AND BORROW TO FILL,
33.01 INCLUDING FREE HAUL UP TO
0,5KM
(a) Material in compacted layer
thickness of 200mm and less:
(i) compacted to 90% of modified
m3 793,368.00 20.72 913,254.72
AASHTO density 44,076.00 18.00 9,860.00 177,480.00 3,200.00 57,600.00 9,259.00 166,662.00 0.00 4,800.00 86,400.00 0.00 0.00 6,755.00 121,590.00 6,516.00 117,288.00 0.00 0.00 747.00 13,446.00 0.00 2,939.00 52,902.00
(ii) compacted to 93% of modified
m3 244,050.60 89.63 1,176,035.23
AASHTO density 13,121.00 18.60 4,910.00 91,326.00 0.00 1,011.00 18,804.60 0.00 0.00 0.00 0.00 5,180.00 96,348.00 1,109.00 20,627.40 0.00 0.00 332.00 6,175.20 173.00 3,217.80 406.00 7,551.60
EXTRA OVER ITEM 33.01 FOR
33.03
EXCAVATING IN 0.00
(a) Intermediate excavation m3 8,304.00 5.00 41,520.00 16.24 134,856.96 4,098.00 20,490.00 0.00 0.00 0.00 0.00 0.00 0.00 2,027.00 10,135.00 1,955.00 9,775.00 0.00 0.00 224.00 1,120.00 0.00 0.00
(b) Hard excavation m3 2,694.00 65.00 175,110.00 35.00 94,290.00 1,366.00 88,790.00 0.00 0.00 0.00 0.00 0.00 0.00 676.00 43,940.00 652.00 42,380.00 0.00 0.00 0.00 0.00 0.00
(c) Boulder excavation Class A m3 2,694.00 65.00 175,110.00 35.00 94,290.00 1,366.00 88,790.00 0.00 0.00 0.00 0.00 0.00 0.00 676.00 43,940.00 652.00 42,380.00 0.00 0.00 0.00 0.00 0.00
CUT TO SPOIL, INCLUDING FREE-
33.04 HAUL UP TO 0,5KM. MATERIAL
OBTAINED FROM: 0.00
(a) Soft excavation m3 1,774.00 15.00 26,610.00 56.33 99,929.42 0.00 0.00 0.00 0.00 455.00 6,825.00 0.00 0.00 0.00 0.00 639.00 9,585.00 0.00 0.00 0.00 680.00 10,200.00
(b) Intermediate excavation m3 1,195.00 20.00 23,900.00 17.42 20,816.90 0.00 0.00 0.00 0.00 228.00 4,560.00 0.00 851.00 17,020.00 0.00 0.00 0.00 106.00 2,120.00 0.00 0.00 10.00 0.00
(c) Hard excavation m3 0.00 80.00 0.00 52.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REMOVAL OF UNSUITABLE
33.07 MATERIAL (INCLUDING FREE-HAUL
OF 0,5KM) 0.00
(a) In layer thickness of 200mm and
less: 0.00
(i) Stable material m3 1,200.00 20.00 24,000.00 17.60 21,120.00 480.00 9,600.00 0.00 0.00 0.00 0.00 0.00 0.00 480.00 9,600.00 240.00 4,800.00 0.00 0.00 0.00 0.00 0.00
(ii) Unstable material m3 1,200.00 25.00 30,000.00 17.60 21,120.00 480.00 12,000.00 0.00 0.00 0.00 0.00 0.00 0.00 480.00 12,000.00 240.00 6,000.00 0.00 0.00 0.00 0.00 0.00
(b) In layer thicknessess exceeding
200mm: 0.00
(i) Stable material m3 2,106.00 20.00 42,120.00 17.60 37,065.60 720.00 14,400.00 0.00 0.00 0.00 0.00 0.00 0.00 720.00 14,400.00 360.00 7,200.00 0.00 0.00 36.00 720.00 0.00 270.00 5,400.00
(ii) Unstable material m3 2,565.00 25.00 64,125.00 17.60 45,144.00 720.00 18,000.00 0.00 375.00 9,375.00 0.00 0.00 0.00 0.00 720.00 18,000.00 360.00 9,000.00 0.00 0.00 120.00 3,000.00 0.00 270.00 6,750.00
ROADBED PREPARATION AND
33.10
COMPACTION 0.00
(a) Compaction to 90% Modified
m3 133,692.00 16.90 173,799.60
AASHTO density 10,284.00 13.00 4,969.00 64,597.00 0.00 270.00 3,510.00 0.00 228.00 2,964.00 0.00 0.00 3,323.00 43,199.00 950.00 12,350.00 0.00 0.00 246.00 3,198.00 0.00 298.00 3,874.00
Finishing-off cut and fill slopes,
33.13
medians and interchange areas: 0.00
(a) Cut slopes m2 10,547.00 1.35 14,238.45 1.10 11,601.70 7,917.00 10,687.95 0.00 38.00 51.30 0.00 0.00 0.00 140.00 189.00 1,521.00 2,053.35 171.00 230.85 105.00 141.75 35.00 47.25 50.00 67.50 220.00 297.00 350.00 472.50
(b) Fill slopes m2 25,044.00 1.35 33,809.40 1.02 25,544.88 11,360.00 15,336.00 0.00 4,419.00 5,965.65 0.00 0.00 0.00 140.00 189.00 4,582.00 6,185.70 3,921.00 5,293.35 105.00 141.75 35.00 47.25 150.00 202.50 0.00 332.00 448.20
EXTRA OVER ITEM 33.01 FOR
33.14 EXCAVATING MATERIAL FROM THE
PAVEMENTS AND FILLS OF
EXISTING ROADS: 0.00
(a) Non-cemented material:
m3 29,911.00 20.62 176,218.52
(recovered from deviatons) 8,546.00 3.50 5,000.00 17,500.00 458.00 1,603.00 270.00 945.00 1,994.00 6,979.00 524.00 1,834.00 0.00 0.00 180.00 630.00 0.00 0.00 0.00 120.00 420.00 0.00 0.00
TOTAL 1,998,314.45 3,136,659.53 753,996.95 59,203.00 212,063.55 6,979.00 102,583.00 0.00 17,398.00 431,021.05 277,324.60 9,868.50 2,214.50 34,349.20 3,514.80 87,598.30
PRELIMINARY QUANTITY SUMMARY
DP4 FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Interchange
Rhodesfield
Douglas Rd
TOTAL QTY
Cresslawn
Lovato Rd
Lovato Rd
Ardeer Rd
Alignment
Alignment
Deviation
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
3400 PAVEMENT LAYERS OF
SECTION GRAVEL MATERIAL
PAVEMENT LAYERS
CONSTRUCTED FROM GRAVEL
TAKEN FROM CUT OR BORROW,
INCLUDING FREE-HAUL UP TO
34.01 1,0KM
(a) Gravel selected layer compacted
to :
TOTAL 1,161,878.00 1,400,286.99 283,088.00 49,830.00 54,532.00 210,306.00 66,716.00 0.00 72,312.00 259,616.00 50,012.00 54,318.00 8,978.00 12,100.00 16,062.00 24,008.00
PRELIMINARY QUANTITY SUMMARY
DP4 FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Rd Crossing
Pretoria Rd /
Chestnut Rd
Rhodesfield
Interchange
Douglas Rd
TOTAL QTY
Cresslawn
Alignment
Alignment
Lovato Rd
Lovato Rd
Ardeer Rd
Deviation
Deviation
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
Antwerp /
K115
UNIT
ITEM DESCRIPTION
SECTIO3500 STABILISATION
CHEMICAL STABILISATION EXTRA
OVER UNSTABILISED COMPACTED
35.01 LAYERS:
(a) Gravel subbase layer , 150mm
thick m3 4,297.00 8.00 34,376.00 10.24 44,001.28 3,404.00 27232 0.00 0.00 0.00 0.00 0.00 0.00 0.00 554.00 4,432.00 0.00 0.00 166.00 1,328.00 173.00 1,384.00 0.00
(b) Gravel subbase layer , 250mm
thick m3 5,797.00 7.00 40,579.00 12.27 71,129.19 0 0.00 843.00 5,901.00 0.00 0.00 0.00 0.00 4,616.00 32,312.00 0.00 0.00 0.00 0.00 0.00 338.00 2,366.00
TOTAL 559,155.00 612,595.81 195532 0 47301 0 0 0 0 245612 31432 0 0 9428 10384 19466
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Rd Crossing
Chestnut Rd
Rhodesfield
Interchange
Douglas Rd
TOTAL QTY
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 3600 CRUSHED STONE BASE
36.01 CRUSHED STONE BASE
(a) Constructed from type G1 material obtained
from commercial sources and compacted to 88% of
apparent relative density (150mm thick) m3 6,931.00 330.00 2,287,230.00 426.53 2,956,279.43 3,094.00 1021020 0 460.00 151800 0 0 0 0 2,354.00 776820 504.00 166320 0 0 151.00 49830 158.00 52140 210.00 69300
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
3800 BREAKING UP EXISTING PAVEMENT
SECTION LAYERS
EXCAVATING AND REMOVING EXISTING
BITUMINOUS MATERIAL (EXCEPT MILLED
38.01 MATERIAL)
(c) Material to be disposed of with the
average depth of excavation:
(iii) Exceeding 30mm but not exceeding
60mm m2 2732 7.50 20490 50.48 137911.36 0 0 0 0 0 0 0 0 860 6450 0 200 1500 360 2700 1057 7928 255 1913
(iv) Exceeding 60mm m2 0 10.00 0 38.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 1061650 571907.75 2690 168000 34500 32570 161420 0 0 1200 7600 636930 1500 3130 8078 4033
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 4100 PRIME COAT
41.01 PRIME COAT
(a) MC30 or equivalent (0.7 l/m2) litre 39,658.00 5.00 198,290.00 4.30 170,529.40 14,440.00 72,200.00 784.00 3,920.00 2,145.00 10,725.00 3,259.00 16,295.00 1,063.00 5,315.00 0.00 1,204.00 6,020.00 10,987.00 54,935.00 2,352.00 11,760.00 903.00 4,515.00 151.00 755.00 704.00 3,520.00 735.00 3,675.00 931.00 4,655.00
TOTAL 198,290.00 170,529.40 72,200.00 3,920.00 10,725.00 16,295.00 5,315.00 0.00 6,020.00 54,935.00 11,760.00 4,515.00 755.00 3,520.00 3,675.00 4,655.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Chestnut Rd
Rd Crossing
Pretoria Rd /
Rhodesfield
Interchange
Douglas Rd
TOTAL QTY
Cresslawn
Alignment
Lovato Rd
Lovato Rd
Ardeer Rd
Alignment
Deviation
AMOUNT
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 4200 ASPHALT SURFACING AND BASE
ASPHALT BASE (60 to 100mm THICK, 60/70 PEN GRADE BITUMEN,
42.01 37,5mm MAXIMUM AGGREGATE SIZE):
(a) Continuously graded ton 5002 400.00 2,000,800.00 649.49 3,248,748.98 2465 986,000.00 0.00 450 180,000.00 0.00 0.00 0.00 0.00 1095 438,000.00 494 197,600.00 0.00 0.00 148 59,200.00 154 61,600.00 196 78,400.00
ASPHALT SURFACING (50mm THICK, 60/70 PEN GRADE BITUMEN, 19mm
42.02 MAXIMUM AGGREGATE SIZE):
(a) Continuously graded (medium) ton 0 792.62 0.00
ASPHALT SURFACING (35mm THICK, 60/70 PEN GRADE BITUMEN,
42.02 13,2mm MAXIMUM AGGREGATE SIZE):
(a) Continuously graded (medium) ton 3821 430.00 1,642,999.90 683.44 2,611,376.40 1440.93 619,599.90 96 41,280.00 263 113,090.00 399 171,570.00 130 55,900.00 0.00 147 63,210.00 638 274,340.00 288 123,840.00 111 47,730.00 18 7,740.00 86 36,980.00 90 38,700.00 114 49,020.00
42.04 TACK COAT OF 30% STABLE GRADE EMULSION (0.5 l/m2) litre 51294 3.00 153,882.00 5.72 293,401.68 20628 61,884.00 560 1,680.00 3064 9,192.00 2328 6,984.00 759 2,277.00 0.00 860 2,580.00 15696 47,088.00 3360 10,080.00 645 1,935.00 108 324.00 1006 3,018.00 1050 3,150.00 1230 3,690.00
ASPHALT SURFACING ON BRIDGE DECKS (50mm THICK, 60/70 PEN
42.09 GRADE BITUMEN, 13mm MAXIMUM AGGREGATE SIZE):
(a) Continuously graded (medium) ton 43 700.00 30,100.00 792.62 34,082.66 0.00 0.00 43 30,100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
42.21 ESTABLISHING THE ASPHALT PAVING PLANT ON SITE
(a) Establishing the paving unit No 13 25,000.00 325,000.00 6,382.80 82,976.40 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 0.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00
(b) Relocating the paving unit to new site No 17 7,500.00 127,500.00 6,382.80 108,507.60 1 7,500.00 1 7,500.00 1 7,500.00 1 7,500.00 1 7,500.00 0.00 4 30,000.00 1 7,500.00 1 7,500.00 2 15,000.00 1 7,500.00 1 7,500.00 1 7,500.00 1 7,500.00
TOTAL 4,280,281.90 6,379,093.72 1,699,983.90 75,460.00 364,882.00 211,054.00 90,677.00 0.00 120,790.00 791,928.00 364,020.00 89,665.00 40,564.00 131,698.00 135,950.00 163,610.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Rd Crossing
Pretoria Rd /
Chestnut Rd
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Ardeer Rd
Alignment
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 5100: PITCHING, STONEWORK ETC
51.01 Stone pitching
(a) Plain pitching
(i) Method 1 m2 182.00 70.00 12,740.00 73.62 13,398.84 120.00 8,400 0 14.00 980 0 0 0 0 0 48.00 3,360 0 0 0 0 0
(b) Grouted stone pitching m2 156.00 100.00 15,600.00 111.76 17,434.56 68.00 6,800 0 14.00 1,400 0 2.00 200 0 8.00 800 48.00 4,800 12.00 1,200 0 0 2.00 200 0 2.00 200
51.04 Concrete pitching and block paving
(a) Cast in situ concrete pitching m2 156.00 150.00 23,400.00 153.80 23,992.80 68.00 10,200 0 14.00 2,100 0 2.00 300 0 8.00 1,200 48.00 7,200 12.00 1,800 0 0 2.00 300 0 2.00 300
(b) Segmental block paving (60mm G-Block or
similar) for sidewalks m2 1,379.00 80.00 110,320.00 77.06 106,265.74 0 0 0 0 525.00 42,000 0 0 250.00 20,000 0 0 0 0 80.00 6,400 524.00 41,920
51.05 Concrete edge beams (Class 20/19) m3 10.10 1,150.00 11,615.00 1,019.80 10,299.98 0 0 0 0 5.00 5,750 0 0 0.10 115 0 0 0 0 0 5.00 5,750
51.07 Foundation trenches m3 25.30 60.00 1,518.00 81.22 2,054.87 0 0 0 0 12.00 720 0 0 0.30 18 0 0 0 0 0 13.00 780
TOTAL 175,193.00 173,446.79 25,400.00 0.00 4,480.00 0.00 48,970.00 0.00 2,000.00 32,133.00 6,360.00 0.00 0.00 500.00 6,400.00 48,950.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Chestnut Rd
Realignment
Rd Crossing
Pretoria Rd /
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Alignment
Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTI
ON 5200: GABIONS
52.02 Surface preparation m2 390.00 7.50 2,925.00 3.24 1,263.60 246.00 1,845.00 0.00 0.00 0.00 0.00 0.00 0.00 96 720.00 48 360.00 0.00 0.00 0.00 0.00 0.00
52.03 Gabions
(a) Galvanised gabion boxes m3 0.00 400.00 0.00 265.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(c) Galvanised gabion mattresses m3 90.00 450.00 40,500.00 325.96 29,336.40 57.00 25,650.00 0.00 0.00 0.00 0.00 0.00 0.00 22 9,900.00 11 4,950.00 0.00 0.00 0.00 0.00 0.00
52 Filter fabric m2 430.00 10.00 4,300.00 13.14 5,650.20 271.00 2,710.00 0.00 0.00 0.00 0.00 0.00 0.00 106 1,060.00 53 530.00 0.00 0.00 0.00 0.00 0.00
B52.05 Removal of gabion walls m3 0.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 47,725.00 36,250.20 30,205.00 0.00 0.00 0.00 0.00 0.00 0.00 11,680.00 5,840.00 0.00 0.00 0.00 0.00 0.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Rd Crossing
Chestnut Rd
Rhodesfield
Interchange
Douglas Rd
TOTAL QTY
Cresslawn
Lovato Rd
Ardeer Rd
Alignment
Alignment
Lovato Rd
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTI
ON 5400: GUARDRAILS
54.01 Guardrails on timber posts m 1,039.00 200.00 207,800.00 159.90 166,136.10 319.00 63,800.00 0.00 346.00 69,200.00 0.00 0.00 0.00 0.00 120.00 24,000.00 98.00 ### 0.00 0.00 0.00 0.00 156.00 31,200.00
Extra over items 54.01, 54.02 and
54.11 for horizontally curved
guardrails factory bent to a radius of
54.03 less than 45m m 44.00 100.00 4,400.00 50.00 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 4,400.00
54.04 End treatments
(a) End wings No. 9.00 125.00 1,125.00 180.00 1,620.00 2.00 250.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 500.00 2.00 250.00 0.00 0.00 0.00 0.00 1.00 125.00
(c) Bridge adaptors No. 4.00 2,450.00 9,800.00 3,840.00 15,360.00 0.00 0.00 4.00 9,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.05 Additional guardrail posts No. 120.00 65.00 7,800.00 130.00 15,600.00 20.00 1,300.00 0.00 40.00 2,600.00 0.00 0.00 0.00 0.00 40.00 2,600.00 10.00 650.00 0.00 0.00 0.00 0.00 10.00 650.00
54.07 Removing existing guardrails m 465.00 50.00 23,250.00 20.00 9,300.00 0.00 16.00 800.00 0.00 0.00 319.00 15,950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.00 6,500.00
Re-erection of guardrails with
54.09 recovered and/or new material
(a) Single guardrail m 338.00 50.00 16,900.00 30.00 10,140.00 0.00 19.00 950.00 0.00 0.00 319.00 15,950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
New material required for the re-
erection of guardrails with recovered
54.11 materials:
(a) Guardrails m 107.00 120.00 12,840.00 130.00 13,910.00 0.00 8.00 960.00 0.00 0.00 99.00 11,880.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Timber posts No. 91.00 65.00 5,915.00 50.00 4,550.00 0.00 6.00 390.00 0.00 0.00 85.00 5,525.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(d) Reflective plates No. 46.00 30.00 1,380.00 25.00 1,150.00 0.00 3.00 90.00 0.00 0.00 43.00 1,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(e) Spacer blocks No. 91.00 10.00 910.00 15.00 1,365.00 0.00 6.00 60.00 0.00 0.00 85.00 850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(f) Splice bolts complete with nut
and washer No. 91.00 10.00 910.00 5.00 455.00 0.00 6.00 60.00 0.00 0.00 85.00 850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(g) Post bolt complete with nut and
washer No. 91.00 15.00 1,365.00 17.50 1,592.50 0.00 6.00 90.00 0.00 0.00 85.00 1,275.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(h) reinforcing plates No. 91.00 7.50 682.50 5.00 455.00 0.00 6.00 45.00 0.00 0.00 85.00 637.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 295,077.50 243,833.60 65,350.00 3,445.00 81,600.00 0.00 54,207.50 0.00 0.00 27,100.00 ### 0.00 0.00 0.00 0.00 42,875.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Rd Crossing
Realignment
Pretoria Rd /
Chestnut Rd
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Lovato Rd
Lovato Rd
Ardeer Rd
Alignment
Alignment
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 5500: FENCING
55.06 Providing temporary fencing and gates
(c) Pedestrian fence m 0.00 150.00 0.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(d) Temporary gates No 0.00 450.00 0.00 850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Rhodesfield
Interchange
TOTAL QTY
Douglas Rd
Cresslawn
Alignment
Lovato Rd
Ardeer Rd
Alignment
Lovato Rd
Deviation
AMOUNT
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
Rate
Rate
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 5600: ROAD SIGNS
(c) Intersection K115 and Modderfontein Road (To suit new intersection layout) No 2.98 5,000.00 14,900.00 150,000.00 447,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.98 14,900.00 0.00 0.00 0.00 0.00 0.00 0.00
(d) Intersection Andre Greyvenstein and Pretoria Roads (Refer
Dwg No. 00401768 Sheets 2 and 3) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(f) Temporary relocation of poles at Intersection N3 Northbound Ramps and
Marlboro Drive (Refer Dwg No. 00401780) No 1.00 5,000.00 5,000.00 150,000.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(g) Restoration of poles at Intersection N3 Northbound Ramps and Marlboro
Drive (Refer Dwg No. 00401780) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(h) Temporary relocation of poles at Intersection N3 Southbound Ramps and
Marlboro Drive (Refer Dwg No. 00401780) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i) Restoration of poles at Intersection N3 Southbound Ramps and Marlboro
Drive (Refer Dwg No. 00401780) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 557,260.00 883,306.68 11,525.00 0.00 1,590.00 0.00 0.00 0.00 506,590.00 23,685.00 0.00 1,590.00 380.00 1,230.00 10,670.00 0.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
TOTAL QTY
Realignment
Rd Crossing
Pretoria Rd /
Chestnut Rd
Rhodesfield
Interchange
Douglas Rd
Cresslawn
Lovato Rd
Alignment
Alignment
Lovato Rd
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
K115
Antwerp /
Rate
Rate
UNIT
ITEM DESCRIPTION
TOTAL 180,300.00 181,890.00 49,750.00 0.00 3,750.00 0.00 3,000.00 0.00 0.00 33,300.00 24,500.00 0.00 0.00 21,500.00 22,000.00 22,500.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
TOTAL QTY
Realignment
Rd Crossing
Pretoria Rd /
Chestnut Rd
Rhodesfield
Interchange
Douglas Rd
Alignment
Lovato Rd
Alignment
Cresslawn
Lovato Rd
Ardeer Rd
Deviation
Deviation
AMOUNT
AMOUNT
Crossing
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Closure
Closure
Andre
K115
Rate
Rate
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 5800 LANDSCAPING AND PLANTING PLANTS
58.01 Trimming
(a) Machine trimming m2 15,456.00 1.25 19,320.00 1.02 15,765.12 0.00 1120 1400.00 0.00 4656 5820.00 600 750.00 5000 6250.00 0.00 0.00 0.00 3600 4500.00 0.00 480 600.00 0.00 0.00
(b) Hand trimming m2 600.00 2.00 1,200.00 0.90 540.00 0.00 0.00 0.00 0.00 600 1200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.03 Preparing the areas for grassing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(a) Ripping ha 1.49 3,500.00 5,215.00 900.00 1,341.00 0.00 0.11 385.00 0.00 0.47 1645.00 0.00 0.50 1750.00 0.00 0.00 0.00 0.36 1260.00 0.00 0.05 175.00 0.00 0.00
(b) Scarifying for loosening topsoil ha 0.00 5,000.00 0.00 900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(c) Topsoiling within the road reserve,where the following materials are used:
(i) Topsoil obtained from within the rail reserve or borrow areas (free haul 1,0km) m3 7,810.00 25.00 195,250.00 22.41 175,022.10 2,759.00 68975.00 224.00 5600.00 446.00 11150.00 1,448.00 36200.00 120.00 3000.00 1,000.00 25000.00 28.00 700.00 610.00 15250.00 581.00 14525.00 381.00 9525.00 7.00 175.00 116.00 2900.00 22.00 550.00 68.00 1700.00
(e) Providing and applying chemical fertilizers etc 0.00
(iv) 2:3:2(22) t 4.36 5,000.00 21,800.00 2,260.00 9,853.60 1.16 5800.00 0.70 3500.00 0.27 1350.00 0.87 4350.00 0.07 350.00 0.30 1500.00 0.02 100.00 0.37 1850.00 0.25 1250.00 0.23 1150.00 0.00 0.07 350.00 0.01 50.00 0.04 200.00
(f) Stockpiling topsoil (free haul 1,0km) m3 19,753.00 20.00 395,060.00 9.69 191,406.57 8,809.00 176180.00 224.00 4480.00 0.00 1,448.00 28960.00 0.00 0.00 229.00 4580.00 6,401.00 128020.00 1,810.00 36200.00 229.00 4580.00 14.00 280.00 175.00 3500.00 168.00 3360.00 246.00 4920.00
58.04 Grassing
(a) The planting of grass cuttings (kikiyu) ha 4.62 100,000.00 462,000.00 10,000.00 46,200.00 1.93 193000.00 0.11 11000.00 0.45 45000.00 0.00 1.20 120000.00 0.00 0.00 0.00 0.41 41000.00 0.38 38000.00 0.00 0.12 12000.00 0.02 2000.00 0.00
(b) Sodding by using the following types of sods
(i) Nursery sods (kikiyu) m2 4,053.00 10.00 40,530.00 17.50 70,927.50 0.00 0.00 0.00 0.00 0.00 1,500.00 15000.00 280.00 2800.00 1,521.00 15210.00 0.00 0.00 70.00 700.00 0.00 0.00 682.00 6820.00
(c) Hydroseeding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i) Providing an approved seed mixture for hydroseeding kg 111.00 10.00 1,110.00 56.00 6,216.00 0.00 0.00 0.00 100.00 1000.00 0.00 0.00 0.00 11.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00
(ii) Providing and approved mulch kg 566.00 10.00 5,660.00 15.00 8,490.00 0.00 0.00 0.00 0.00 0.00 245.00 2450.00 0.00 321.00 3210.00 0.00 0.00 0.00 0.00 0.00 0.00
(iii) Hydroseeding ha 2.26 0.00 3,000.00 6,780.00 0.00 0.00 0.00 1.45 0.00 0.00 0.35 0.00 0.00 0.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.05 Watering the grass when established by topsoiling only kl 234.00 20.00 4,680.00 15.00 3,510.00 208.00 4160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 520.00 0.00 0.00 0.00 0.00 0.00
Watering the already planted grass, trees and shrubs during periods of drought
58.06 experienced during the growing season kl 1,393.00 20.00 27,860.00 15.00 20,895.00 482.00 9640.00 28.00 560.00 0.00 362.00 7240.00 0.00 125.00 2500.00 0.00 153.00 3060.00 102.00 2040.00 95.00 1900.00 0.00 29.00 580.00 0.00 17.00 340.00
58.07 Mowing the grass ha 18.10 2,000.00 36,200.00 1,000.00 18,100.00 1.93 3860.00 1.12 2240.00 4.46 8920.00 0.00 0.60 1200.00 0.30 600.00 0.06 120.00 0.00 4.09 8180.00 3.81 7620.00 0.01 20.00 1.16 2320.00 0.22 440.00 0.34 680.00
58.1 Extra work for landscaping Prov. Sum 5.00 1.00 5.00 10,000.00 50,000.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00
58.11 Weeding all grass-seeded areas and the grass when established by topsoiling only ha 4.99 1,500.00 7,485.00 750.00 3,742.50 0.42 630.00 0.00 0.00 2.90 4350.00 0.00 0.70 1050.00 0.00 0.92 1380.00 0.05 75.00 0.00 0.00 0.00 0.00 0.00
TOTAL 1,223,375.00 761,129.00 462,246.00 29,165.00 66,420.00 89,565.00 126,500.00 56,101.00 8,300.00 168,091.00 103,790.00 68,535.00 1,175.00 22,425.00 6,401.00 14,661.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET
TOTAL AMOUNT
TOTAL AMOUNT
Centenary Road
Centenary Road
Centenary Rd
Pressburg Rd
Greyvenstein
Chestnut Rd
TOTAL QTY
Realignment
Pretoria Rd /
Rd Crossing
Rhodesfield
Interchange
Douglas Rd
Cresslawn
Alignment
Lovato Rd
Lovato Rd
Alignment
Ardeer Rd
AMOUNT
Deviation
AMOUNT
AMOUNT
Deviation
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
AMOUNT
Crossing
Closure
Closure
Andre
K115
Antwerp /
Rate
Rate
UNIT
ITEM DESCRIPTION
5900 FINISHING THE ROAD AND ROAD RESERVE AND TREATING OLD
SECTION ROADS
59.01 FINISHING THE ROAD AND ROAD RESERVE:
(a) Single carriageway of road reserve km 4.60 7,500.00 34,500.00 6,412.42 29,497.13 1.60 12000.0 0.0 0.40 3000.0 0.0 0.0 0.0 0.40 3000.0 0.60 4500.0 0.60 4500.0 0.30 2250.0 0.10 750.0 0.10 750.0 0.20 1500.0 0.30 2250.0
TOTAL 34,500.00 29,497.13 12,000.00 0.00 3,000.00 0.00 0.00 0.00 3,000.00 4,500.00 4,500.00 2,250.00 750.00 750.00 1,500.00 2,250.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS
Centenary Road
Centenary Road
Pressburg Rd
Centenary Rd
Greyvenstein
Realignment
Pretoria Rd /
Chestnut Rd
Rd Crossing
Rhodesfield
Interchange
Douglas Rd
Cresslawn
Alignment
Lovato Rd
Alignment
Lovato Rd
Ardeer Rd
Deviation
Deviation
Crossing
Closure
Closure
Andre
K115
Antwerp /
UNIT
ITEM DESCRIPTION
SECTION 6700 STRUCTURAL STEELWORK
B67.01
Approximate quantity of structural steel, Supports
5.0 ton, Deck 7.2 ton, stairs 3.0 ton. No 0.00
ITEM
DESCRIPTION
m2
m2
UNIT
Centenary Road
Alignment
Centenary Road
Deviation
Lovato Rd
Crossing
Lovato Rd
Deviation
Chestnut Rd
Modderfontein
Rd Crossing
Rhodesfield
Closure
K115
Ardeer Rd
Alignment
Cresslawn
Closure
Pressburg Rd
Realignment
Antwerp /
Centenary Rd
Interchange
Pretoria Rd /
Andre
Greyvenstein
0
0
1,200.00
1,100.00
0.00
0.00
0.00