Вы находитесь на странице: 1из 21

DP4 PRELIMINARY SUMMARY FOR ROADWORKS

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment
Chestnut Rd

Pretoria Rd /
Rd Crossing

Rhodesfield

Interchange
Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd
Alignment

Ardeer Rd
Alignment
Deviation
Deviation

Crossing

Closure

Closure

Andre
K115

Antwerp /
ITEM DESCRIPTION BUDGET TOTAL

1500 Accommodation of Traffic 3,627,385.00 1,035,650.00 49,680.00 84,300.00 0.00 45,300.00 121,960.00 360,340.00 35,320.00 50,400.00 10,080.00 6,990.00 14,080.00 48,600.00 48,600.00 160,000.00
2200 Prefabricated Culverts 2,305,617.42 1,388,500.00 581,270.00 0.00 38,500.00 1,250.00 18,175.00 0.00 22,000.00 424,260.00 259,440.00 0.00 0.00 8,500.00 7,550.00 27,555.00
2300 Concrete kerbing and Channeling 1,295,493.24 1,285,410.00 569,220.00 0.00 108,300.00 4,500.00 31,650.00 0.00 50,400.00 221,640.00 149,040.00 31,500.00 10,500.00 27,000.00 45,000.00 36,660.00
3300 Mass Earthworks 3,136,659.53 1,998,114.45 753,996.95 59,203.00 212,063.55 6,979.00 102,583.00 0.00 17,398.00 431,021.05 277,324.60 9,868.50 2,214.50 34,349.20 3,514.80 87,598.30
3400 Pavement Layers of Gravel Material 1,400,286.99 1,161,878.00 283,088.00 49,830.00 54,532.00 210,306.00 66,716.00 0.00 72,312.00 259,616.00 50,012.00 54,318.00 8,978.00 12,100.00 16,062.00 24,008.00
3500 Stabilisation 612,595.81 559,155.00 195,532.00 0.00 47,301.00 0.00 0.00 0.00 0.00 245,612.00 31,432.00 0.00 0.00 9,428.00 10,384.00 19,466.00
3600 Crushed Stone Base 2,956,279.43 1,266,210.00 0.00 0.00 151,800.00 0.00 0.00 0.00 0.00 776,820.00 166,320.00 0.00 0.00 49,830.00 52,140.00 69,300.00
3800 Breaking up Existing Pavement 571,907.75 1,061,650.00 2,690.00 168,000.00 34,500.00 32,570.00 161,420.00 0.00 0.00 1,200.00 7,600.00 636,930.00 1,500.00 3,130.00 8,077.50 4,032.50
4100 Prime coat 170,529.40 198,290.00 72,200.00 3,920.00 10,725.00 16,295.00 5,315.00 0.00 6,020.00 54,935.00 11,760.00 4,515.00 755.00 3,520.00 3,675.00 4,655.00
4200 Asphalt Surfacing & Base 6,379,093.72 4,280,281.90 1,699,983.90 75,460.00 364,882.00 211,054.00 90,677.00 0.00 120,790.00 791,928.00 364,020.00 89,665.00 40,564.00 131,698.00 135,950.00 163,610.00
5100 Pitching & Stonework etc 173,446.79 175,193.00 25,400.00 0.00 4,480.00 0.00 48,970.00 0.00 2,000.00 32,133.00 6,360.00 0.00 0.00 500.00 6,400.00 48,950.00
5200 Gabions 36,250.20 47,725.00 30,205.00 0.00 0.00 0.00 0.00 0.00 0.00 11,680.00 5,840.00 0.00 0.00 0.00 0.00 0.00
5400 Guardrails 243,833.60 295,077.50 65,350.00 3,445.00 81,600.00 0.00 54,207.50 0.00 0.00 27,100.00 20,500.00 0.00 0.00 0.00 0.00 42,875.00
5500 Fencing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5600 Road Signs 883,306.68 557,260.00 11,525.00 0.00 1,590.00 0.00 0.00 0.00 506,590.00 23,685.00 0.00 1,590.00 380.00 1,230.00 10,670.00 0.00
5700 Road Markings 181,890.00 180,300.00 49,750.00 0.00 3,750.00 0.00 3,000.00 0.00 0.00 33,300.00 24,500.00 0.00 0.00 21,500.00 22,000.00 22,500.00
5800 Landscapping & Grassing 761,129.00 1,223,375.00 462,246.00 29,165.00 66,420.00 89,565.00 126,500.00 56,101.00 8,300.00 168,091.00 103,790.00 68,535.00 1,175.00 22,425.00 6,401.00 14,661.00
5900 Finishing the Road and Road Reserve 29,497.13 34,500.00 12,000.00 0.00 3,000.00 0.00 0.00 0.00 3,000.00 4,500.00 4,500.00 2,250.00 750.00 750.00 1,500.00 2,250.00
6700 Structural Steelwork 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7400 Systems 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 24,765,201.69 16,748,569.85 4,864,136.85 473,323.00 1,183,443.55 617,819.00 831,173.50 416,441.00 844,130.00 3,557,921.05 1,492,518.60 906,161.50 80,896.50 374,560.20 377,924.30 728,120.80

ADD P&G @30% 7,429,560.51 5,024,570.96

TOTAL 32,194,762.19 21,773,140.81


PRELIMINARY QUANTITY SUMMARY FOR
DP4 ROADWORKS THYS BUDGET

Modderfontein Rd
TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment
Chestnut Rd

Pretoria Rd /
Rhodesfield
TOTAL QTY

Interchange
Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd
Alignment

Alignment
Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Crossing

Closure

Closure

Andre
K115

Antwerp /
UNIT RATE RATE

ITEM DESCRIPTION

SECTION 1500 ACCOMMODATION OF TRAFFIC


15.03 Temporary traffic control facilities
(a) Flagmen man/day 26,900.00 13.00 349,700.00 109.65 2,949,585.00 900 11,700.00 3000 39,000.00 0.00 0.00 3000 39,000.00 4000 52,000.00 2000 26,000.00 2000 26,000.00 0.00 0.00 1000 13,000.00 3000 39,000.00 3000 39,000.00 5000 65,000.00
(b) Portable stop/go signs No 4.00 0.00 310.00 1,240.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00 2 0.00 0.00
(c) Temporary traffic control signals No 0.00 0.00 385,183.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(e) Road signs R and TR series No 90.00 600.00 54,000.00 345.00 31,050.00 25 15,000.00 11 6,600.00 0.00 11 6,600.00 5 3,000.00 10 6,000.00 0.00 9 5,400.00 8 4,800.00 0.00 0.00 4 2,400.00 4 2,400.00 3 1,800.00
(f) Road
(g) Roadsigns
signsTW series
STW-,DTG-TGS and TG series No 92.00 600.00 55,200.00 345.00 31,740.00 19 11,400.00 6 3,600.00 0.00 6 3,600.00 10 6,000.00 6 3,600.00 4 2,400.00 9 5,400.00 4 2,400.00 3 1,800.00 1 600.00 4 2,400.00 4 2,400.00 16 9,600.00
excluding delineators m2 159.00 600.00 95,400.00 430.00 68,370.00 4 2,400.00 42 25,200.00 0.00 42 25,200.00 22 13,200.00 23 13,800.00 0.00 7 4,200.00 2 1,200.00 0.00 0.00 2 1,200.00 2 1,200.00 13 7,800.00
(h) Delineators No 330.00 120.00 39,600.00 135.00 44,550.00 14 1,680.00 20 2,400.00 0.00 20 2,400.00 48 5,760.00 102 12,240.00 16 1,920.00 20 2,400.00 14 1,680.00 12 1,440.00 4 480.00 30 3,600.00 30 3,600.00 0.00
(i) Movable barricades No 19.00 1,250.00 23,750.00 925.00 17,575.00 6 7,500.00 2 2,500.00 0.00 2 2,500.00 0.00 0.00 4 5,000.00 2 2,500.00 0.00 3 3,750.00 0.00 0.00 0.00 0.00
(j) Traffic cones No 105.00 100.00 10,500.00 55.00 5,775.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45 4,500.00 0.00 0.00 0.00 0.00 0.00 60 6,000.00
(k)Removeable
(l) Guardrails attached
concretetobarriers
posts (SANRAL m 0.00 0.00 65.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
type)
Relocation of traffic-control facilities (at each m 250.00 1,350.00 337,500.00 950.00 237,500.00 0.00 0.00 0.00 0.00 0.00 202 272,700.00 0.00 0 0.00 0.00 0 0.00 0.00 0.00 0.00 48 64,800.00
B15.04 site e.g. Stages 1&2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(a) Signs lump sum 0.00 132,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Removeable concrete barriers (SANRAL
type) m 0.00 200.00 0.00 950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Application and removal of temporary
B15.14 roadmarkings lump sum 4.00 5,000.00 20,000.00 10,000.00 40,000.00 0.00 1 5,000.00 0.00 1 5,000.00 1 5,000.00 0.00 0 0.00 0 0.00 0.00 0 0.00 0.00 0.00 0.00 1 5,000.00

Management of 2 + 1 lane alternating direction


B15.15 contraflow for full duration of contract lump sum 1.00 50,000.00 50,000.00 200,000.00 200,000.00 0.00 0.00 0.00 0.00 1 50,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 1,035,650.00 3,627,385.00 49,680.00 84,300.00 0.00 45,300.00 121,960.00 360,340.00 35,320.00 50,400.00 10,080.00 6,990.00 14,080.00 48,600.00 48,600.00 160,000.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Alignment

Lovato Rd

Lovato Rd

Alignment
Ardeer Rd
Deviation
AMOUNT

AMOUNT

AMOUNT

Deviation

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure
Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION

SECTION 2200 PREFABRICATED CULVERTS


22.01 EXCAVATION
a) Excavation in soft m3 2,111.00 30.00 63,330.00 60.00 126,660.00 984 29,520.00 0.00 0.00 0.00 0.00 0.00 0.00 717 21,510.00 338 10,140.00 0.00 0.00 0.00 0.00 72 2,160.00
22.02 BACKFILLING 0.00
a)Using the excavated material m3 1,107.00 50.00 55,350.00 40.93 45,309.51 645 32,250.00 0.00 0.00 0.00 0.00 0.00 0.00 255 12,750.00 135 6,750.00 0.00 0.00 0.00 0.00 72 3,600.00
22.02 CONCRETE PIPE CULVERTS 0.00
600mm dia on class C bedding m 180.00 600.00 108,000.00 482.23 86,801.40 150 90,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30 18,000.00 0.00 0.00 0.00 0.00 0.00
900mm dia on class C bedding m 60.00 1,200.00 72,000.00 1,050.49 63,029.40 60 72,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PORTAL AND RECTANGULAR
22.05 CULVERTS 0.00

Culverts complete (Size to be stated) 0.00


(a) 3 barrel 2,1m x 1,2m portal culvert m
including two headwalls 48.00 5,375.00 258,000.00 15,135.75 726,516.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48 258,000.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) 2 barrel 3,6m x 1,5m portal m
culvert including two headwalls 18.00 9,400.00 169,200.00 24,453.51 440,163.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 169,200.00 0.00 0.00 0.00 0.00 0.00
(c) 2 barrel 3,6m x 1,5m portal culvert m
including two headwalls 24.00 9,400.00 225,600.00 18,340.14 440,163.36 24 225,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B22.12 Removing existing concrete 0.00

(a) Demolish and remove existing


inlet and outlet structures 0.00
(i) 3 bay (3m) kerb inlet No 2.00 1,000.00 2,000.00 611.82 1,223.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 1,000.00 0.00 1 1,000.00
(ii) 4 bay (4m) kerb inlet No 1.00 1,500.00 1,500.00 815.77 815.77 0.00 0.00 0.00 0.00 1 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Demolish and remove existing m
kerb and channel 2,840.00 25.00 71,000.00 24.47 69,494.80 1676 41,900.00 0.00 0.00 50 1,250.00 197 4,925.00 0.00 0.00 0.00 254 6,350.00 0.00 0.00 80 2,000.00 302 7,550.00 281 7,025.00
(c) Demolish and remove existing m2
paved sidewalk 652.00 10.00 6,520.00 30.58 19,938.16 0.00 0.00 0.00 0.00 525 5,250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 127 1,270.00
Removing and stacking existing
22.14 prefabricated culverts 0.00

m
(a) 600mm diameter concrete pipe 20.00 350.00 7,000.00 65.11 1,302.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20 7,000.00
m
(b) 900mm diameter concrete pipe 0.00 0.00 87.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B22.17 MANHOLES AND CATCHPITS 0.00
(a) Manholes No 0.00 6,000.00 0.00 3,976.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Catchpits No 0.00 6,000.00 0.00 3,976.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(c) Kerb Inlets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i) 3 bay (3m) No 43.00 5,500.00 236,500.00 5,000.00 215,000.00 2 11,000.00 0.00 7 38,500.00 0.00 0.00 0.00 4 22,000.00 24 132,000.00 4 22,000.00 0.00 0.00 1 5,500.00 0.00 1 5,500.00
(ii) 4 bay (4m) No 7.00 6,500.00 45,500.00 7,500.00 52,500.00 4 26,000.00 0.00 0.00 0.00 1 6,500.00 0.00 0.00 0.00 2 13,000.00 0.00 0.00 0.00 0.00 0.00
(d) Headwalls 0.00

No
(i) Single for 600mm diameter pipe 14.00 3,500.00 49,000.00 850.00 11,900.00 10 35,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4 14,000.00 0.00 0.00 0.00 0.00 0.00

(ii) Single for 900mm diameter pipe No 4.00 4,500.00 18,000.00 1,200.00 4,800.00 4 18,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 1,388,500.00 2,305,617.42 581,270.00 0.00 38,500.00 1,250.00 18,175.00 0.00 22,000.00 424,260.00 259,440.00 0.00 0.00 8,500.00 7,550.00 27,555.00
PRELIMINARY
DP4 QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Chestnut Rd

Pretoria Rd /
Realignment
Rd Crossing

Interchange
Rhodesfield
TOTAL QTY

Douglas Rd

Cresslawn
Alignment

Alignment
Lovato Rd

Lovato Rd

Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 2300 CONCRETE KERBING AND CHANNELLING
23.01 CONCRETE KERBING
(a) Barrier and / or mountable kerbing complete m 136.00 90.00 12,240.00 110.79 15,067.44 32.00 2,880.00 0.00 0.00 50.00 4,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 4,860.00
CONCRETE KERBING CHANNELLING
23.02 0.00
COMBINATIONS
(a) Barrier and / or mountable kerbing and
1,174,050.00 151.24 1,183,755.48 523,500.00 0.00 97,800.00 0.00 29,550.00 0.00 42,000.00 191,400.00 144,000.00 31,500.00 10,500.00 27,000.00 45,000.00 31,800.00
channelling complete m 7,827.00 150.00 3,490.00 652.00 197.00 0.00 280.00 1,276.00 960.00 210.00 70.00 180.00 300.00 212.00
23.03 CONCRETE CHUTES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(a) Prefabricated class 20/19 concrete chutes down 99,120.00 204.81 96,670.32 42,840.00 0.00 10,500.00 0.00 2,100.00 0.00 8,400.00 30,240.00 5,040.00 0.00 0.00 0.00 0.00 0.00
slide slopes complete as shown in the drawings….. m 472.00 210.00 204.00 50.00 10.00 40.00 144.00 24.00

TOTAL 1,285,410.00 1,295,493.24 569,220.00 0.00 108,300.00 4,500.00 31,650.00 0.00 50,400.00 221,640.00 149,040.00 31,500.00 10,500.00 27,000.00 45,000.00 36,660.00
PRELIMINARY
DP4 QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Rhodesfield

Interchange
Douglas Rd
TOTAL QTY

Cresslawn
Alignment

Lovato Rd

Lovato Rd

Alignment
Ardeer Rd
Deviation
Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 3300 MASS EARTHWORKS
CUT AND BORROW TO FILL,
33.01 INCLUDING FREE HAUL UP TO
0,5KM
(a) Material in compacted layer
thickness of 200mm and less:
(i) compacted to 90% of modified
m3 793,368.00 20.72 913,254.72
AASHTO density 44,076.00 18.00 9,860.00 177,480.00 3,200.00 57,600.00 9,259.00 166,662.00 0.00 4,800.00 86,400.00 0.00 0.00 6,755.00 121,590.00 6,516.00 117,288.00 0.00 0.00 747.00 13,446.00 0.00 2,939.00 52,902.00
(ii) compacted to 93% of modified
m3 244,050.60 89.63 1,176,035.23
AASHTO density 13,121.00 18.60 4,910.00 91,326.00 0.00 1,011.00 18,804.60 0.00 0.00 0.00 0.00 5,180.00 96,348.00 1,109.00 20,627.40 0.00 0.00 332.00 6,175.20 173.00 3,217.80 406.00 7,551.60
EXTRA OVER ITEM 33.01 FOR
33.03
EXCAVATING IN 0.00
(a) Intermediate excavation m3 8,304.00 5.00 41,520.00 16.24 134,856.96 4,098.00 20,490.00 0.00 0.00 0.00 0.00 0.00 0.00 2,027.00 10,135.00 1,955.00 9,775.00 0.00 0.00 224.00 1,120.00 0.00 0.00
(b) Hard excavation m3 2,694.00 65.00 175,110.00 35.00 94,290.00 1,366.00 88,790.00 0.00 0.00 0.00 0.00 0.00 0.00 676.00 43,940.00 652.00 42,380.00 0.00 0.00 0.00 0.00 0.00
(c) Boulder excavation Class A m3 2,694.00 65.00 175,110.00 35.00 94,290.00 1,366.00 88,790.00 0.00 0.00 0.00 0.00 0.00 0.00 676.00 43,940.00 652.00 42,380.00 0.00 0.00 0.00 0.00 0.00
CUT TO SPOIL, INCLUDING FREE-
33.04 HAUL UP TO 0,5KM. MATERIAL
OBTAINED FROM: 0.00
(a) Soft excavation m3 1,774.00 15.00 26,610.00 56.33 99,929.42 0.00 0.00 0.00 0.00 455.00 6,825.00 0.00 0.00 0.00 0.00 639.00 9,585.00 0.00 0.00 0.00 680.00 10,200.00
(b) Intermediate excavation m3 1,195.00 20.00 23,900.00 17.42 20,816.90 0.00 0.00 0.00 0.00 228.00 4,560.00 0.00 851.00 17,020.00 0.00 0.00 0.00 106.00 2,120.00 0.00 0.00 10.00 0.00
(c) Hard excavation m3 0.00 80.00 0.00 52.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REMOVAL OF UNSUITABLE
33.07 MATERIAL (INCLUDING FREE-HAUL
OF 0,5KM) 0.00
(a) In layer thickness of 200mm and
less: 0.00
(i) Stable material m3 1,200.00 20.00 24,000.00 17.60 21,120.00 480.00 9,600.00 0.00 0.00 0.00 0.00 0.00 0.00 480.00 9,600.00 240.00 4,800.00 0.00 0.00 0.00 0.00 0.00
(ii) Unstable material m3 1,200.00 25.00 30,000.00 17.60 21,120.00 480.00 12,000.00 0.00 0.00 0.00 0.00 0.00 0.00 480.00 12,000.00 240.00 6,000.00 0.00 0.00 0.00 0.00 0.00
(b) In layer thicknessess exceeding
200mm: 0.00
(i) Stable material m3 2,106.00 20.00 42,120.00 17.60 37,065.60 720.00 14,400.00 0.00 0.00 0.00 0.00 0.00 0.00 720.00 14,400.00 360.00 7,200.00 0.00 0.00 36.00 720.00 0.00 270.00 5,400.00
(ii) Unstable material m3 2,565.00 25.00 64,125.00 17.60 45,144.00 720.00 18,000.00 0.00 375.00 9,375.00 0.00 0.00 0.00 0.00 720.00 18,000.00 360.00 9,000.00 0.00 0.00 120.00 3,000.00 0.00 270.00 6,750.00
ROADBED PREPARATION AND
33.10
COMPACTION 0.00
(a) Compaction to 90% Modified
m3 133,692.00 16.90 173,799.60
AASHTO density 10,284.00 13.00 4,969.00 64,597.00 0.00 270.00 3,510.00 0.00 228.00 2,964.00 0.00 0.00 3,323.00 43,199.00 950.00 12,350.00 0.00 0.00 246.00 3,198.00 0.00 298.00 3,874.00
Finishing-off cut and fill slopes,
33.13
medians and interchange areas: 0.00
(a) Cut slopes m2 10,547.00 1.35 14,238.45 1.10 11,601.70 7,917.00 10,687.95 0.00 38.00 51.30 0.00 0.00 0.00 140.00 189.00 1,521.00 2,053.35 171.00 230.85 105.00 141.75 35.00 47.25 50.00 67.50 220.00 297.00 350.00 472.50
(b) Fill slopes m2 25,044.00 1.35 33,809.40 1.02 25,544.88 11,360.00 15,336.00 0.00 4,419.00 5,965.65 0.00 0.00 0.00 140.00 189.00 4,582.00 6,185.70 3,921.00 5,293.35 105.00 141.75 35.00 47.25 150.00 202.50 0.00 332.00 448.20
EXTRA OVER ITEM 33.01 FOR
33.14 EXCAVATING MATERIAL FROM THE
PAVEMENTS AND FILLS OF
EXISTING ROADS: 0.00
(a) Non-cemented material:
m3 29,911.00 20.62 176,218.52
(recovered from deviatons) 8,546.00 3.50 5,000.00 17,500.00 458.00 1,603.00 270.00 945.00 1,994.00 6,979.00 524.00 1,834.00 0.00 0.00 180.00 630.00 0.00 0.00 0.00 120.00 420.00 0.00 0.00

(Applicable if recovery of material


from deviations or existing
pavement is required for re-use.
Otherwise Item 38.04 applies) 0.00

EXTRA OVER ITEM 33.14 FOR


33.15 EXCAVATING IN PAVEMENTS AND
FILLS OF EXISTING ROADS IN
RESTRICTED AREAS: 0.00
(a) Non-cemented material m3 570.00 25.00 14,250.00 15.60 8,892.00 0.00 0.00 270.00 6,750.00 0.00 0.00 0.00 0.00 180.00 4,500.00 0.00 0.00 0.00 120.00 3,000.00 0.00 0.00

(a) Non-cemented material: (in m3 132,500.00 15.60 82,680.00


widening where width is less than
3m or length less than 150m) 5,300.00 25.00 5,000.00 125,000.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00 4,500.00 0.00 0.00 0.00 120.00 3,000.00 0.00 0.00

TOTAL 1,998,314.45 3,136,659.53 753,996.95 59,203.00 212,063.55 6,979.00 102,583.00 0.00 17,398.00 431,021.05 277,324.60 9,868.50 2,214.50 34,349.20 3,514.80 87,598.30
PRELIMINARY QUANTITY SUMMARY
DP4 FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Interchange
Rhodesfield

Douglas Rd
TOTAL QTY

Cresslawn
Lovato Rd

Lovato Rd

Ardeer Rd
Alignment

Alignment
Deviation

Deviation
AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
3400 PAVEMENT LAYERS OF
SECTION GRAVEL MATERIAL
PAVEMENT LAYERS
CONSTRUCTED FROM GRAVEL
TAKEN FROM CUT OR BORROW,
INCLUDING FREE-HAUL UP TO
34.01 1,0KM
(a) Gravel selected layer compacted
to :

(ii) 95% of modified AASHTO density


(150mm thick, G7 material) m3 10180 32.00 325760 50.15 510527 3713 118,816.00 202 6,464.00 552 17,664.00 838 26,816.00 273 8,736.00 0.00 310 9,920.00 2825 90,400.00 605 19,360.00 232 7,424.00 39 1,248.00 181 5,792.00 189 6,048.00 221 7,072.00
(c) Gravel subbase (unstabilised
gravel G5) compacted to:
(i) 96% of modified AASHTO density
(150mm thick) m3 1735 38.00 65930 52.04 90289.4 0.00 185 7,030.00 0.00 768 29,184.00 250 9,500.00 0.00 284 10,792.00 0.00 0.00 213 8,094.00 35 1,330.00 0.00 0.00 0.00

(ii) 96% of modified AASHTO density


(125mm thick under paving or as
gravel sidewalks) m3 1865 40.00 74600 111.48 207910.2 873 34,920.00 0.00 163 6,520.00 0.00 72 2,880.00 0.00 0.00 346 13,840.00 240 9,600.00 0.00 0.00 0.00 86 3,440.00 85 3,400.00

(iii) 96% of modified AASHTO density


(150mm gravel shoulders M3 495 38.00 18810 55.75 27596.25 72 2,736.00 0.00 387 14,706.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36 1,368.00

(d) Gravel subbase (chemically


stabilised material G5) compacted
to:
(i) 96% of modified AASHTO density
(150mm thick) m3 4297 38.00 163286 54.24 233069.28 3404 129,352.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 554 21,052.00 0.00 0.00 166 6,308.00 173 6,574.00 0.00
(ii) 96% of modified AASHTO density
(250mm thick) m3 5497 36.00 197892 52.04 286063.88 0.00 0.00 843 30,348.00 0.00 0.00 0.00 0.00 4316 155,376.00 0.00 0.00 0.00 0.00 0.00 338 12,168.00
(e) Gravel base (unstabilised gravel
G4) compacted to:
(i) 98% of modified AASHTO density
(150mm thick) m3 1578 200.00 315600 28.41 44830.98 0.00 168 33,600.00 0.00 698 139,600.00 228 45,600.00 0.00 258 51,600.00 0.00 0.00 194 38,800.00 32 6,400.00 0.00 0.00 0.00

TOTAL 1,161,878.00 1,400,286.99 283,088.00 49,830.00 54,532.00 210,306.00 66,716.00 0.00 72,312.00 259,616.00 50,012.00 54,318.00 8,978.00 12,100.00 16,062.00 24,008.00
PRELIMINARY QUANTITY SUMMARY
DP4 FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road
Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment
Rd Crossing

Pretoria Rd /
Chestnut Rd

Rhodesfield

Interchange
Douglas Rd
TOTAL QTY

Cresslawn
Alignment

Alignment
Lovato Rd

Lovato Rd

Ardeer Rd
Deviation

Deviation
Crossing
AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

Antwerp /
K115
UNIT

ITEM DESCRIPTION
SECTIO3500 STABILISATION
CHEMICAL STABILISATION EXTRA
OVER UNSTABILISED COMPACTED
35.01 LAYERS:
(a) Gravel subbase layer , 150mm
thick m3 4,297.00 8.00 34,376.00 10.24 44,001.28 3,404.00 27232 0.00 0.00 0.00 0.00 0.00 0.00 0.00 554.00 4,432.00 0.00 0.00 166.00 1,328.00 173.00 1,384.00 0.00
(b) Gravel subbase layer , 250mm
thick m3 5,797.00 7.00 40,579.00 12.27 71,129.19 0 0.00 843.00 5,901.00 0.00 0.00 0.00 0.00 4,616.00 32,312.00 0.00 0.00 0.00 0.00 0.00 338.00 2,366.00

35.02 CHEMICAL STABILISING AGENT:


(a) CEM II 42,5 (2,5%) t 538.00 900.00 484,200.00 837.06 450,338.28 187.00 168300 0.00 46.00 41,400.00 0.00 0.00 0.00 0.00 237.00 213,300.00 30.00 27,000.00 0.00 0.00 9.00 8,100.00 10.00 9,000.00 19.00 17,100.00
CURING BY COVERING WITH THE
35.05 SUBSEQUENT LAYER m2 46,203.00 0.00 0.00 1.02 47,127.06 20,628.00 0 0.00 3,064.00 0.00 0.00 0.00 0.00 0.00 15,696.00 0.00 3,360.00 0.00 0.00 0.00 1,006.00 0.00 1,050.00 0.00 1,399.00 0.00

TOTAL 559,155.00 612,595.81 195532 0 47301 0 0 0 0 245612 31432 0 0 9428 10384 19466
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Rd Crossing
Chestnut Rd

Rhodesfield

Interchange
Douglas Rd
TOTAL QTY

Cresslawn
Lovato Rd

Lovato Rd
Alignment

Alignment
Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 3600 CRUSHED STONE BASE
36.01 CRUSHED STONE BASE
(a) Constructed from type G1 material obtained
from commercial sources and compacted to 88% of
apparent relative density (150mm thick) m3 6,931.00 330.00 2,287,230.00 426.53 2,956,279.43 3,094.00 1021020 0 460.00 151800 0 0 0 0 2,354.00 776820 504.00 166320 0 0 151.00 49830 158.00 52140 210.00 69300

TOTAL 2,287,230.00 2,956,279.43 0 151800 0 0 0 0 776820 166320 0 0 49830 52140 69300


PRELIMINARY QUANTITY SUMMARY FOR
DP4 ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd

Alignment
Alignment

Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
3800 BREAKING UP EXISTING PAVEMENT
SECTION LAYERS
EXCAVATING AND REMOVING EXISTING
BITUMINOUS MATERIAL (EXCEPT MILLED
38.01 MATERIAL)
(c) Material to be disposed of with the
average depth of excavation:
(iii) Exceeding 30mm but not exceeding
60mm m2 2732 7.50 20490 50.48 137911.36 0 0 0 0 0 0 0 0 860 6450 0 200 1500 360 2700 1057 7928 255 1913
(iv) Exceeding 60mm m2 0 10.00 0 38.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

MILLING OUT EXISTING BITUMINOUS


MATERIAL WITH AN AVERAGE MILLING
38.02 DEPTH: 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(b) Exceeding 30mm but not exceeding
60mm m3 5548 150.00 832200 50.48 280063.04 0 1120 168000 180 27000 163 24450 53 7950 0 0 0 0 4032 604800 0 0 0 0

(Applicable if recovery of material from


deviations or existing pavement is required
for re-use. Small volumes will not warrant
establishment of the machine) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(c) Exceeding 60 mm m3 0 38.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

(Applicable if recovery of material from


deviations or existing pavement is required
for re-use. Small volumes will not warrant
establishment of the machine) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EXCAVATING AND SPOILING MATERIAL


FROM AN EXISTING PAVEMENT AND/OR
38.04 THE UNDERLYING FILL 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(a) Non-cemented material m3 5871 30.00 176130 20.51 120414.21 0 0 0 0 4800 144000 0 0 0 0 1071 32130 0 0 0 0
(Item 33.14 more applicable if selection of
material for re-use is not required) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SAWING OR CUTTING ASPHALT OR
38.08 CEMENTED PAVEMENT LAYERS: 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(b) Cutting asphalt with a diamond saw (ave
depth 50mm) m 1033 10.00 10330 23.18 23944.94 269 2690 0 0 62 620 197 1970 0 0 120 1200 115 1150 0 0 43 430 15 150 212 2120
38.1 PREPARING STOCKPILE SITES m2 0 5.00 0 2.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PROVIDING THE MILLING MACHINE ON THE
38.14 SITE (1m drum width) No 3 7,500.00 22500 3191.4 9574.2 0 0 1 7500 1 7500 1 7500 0 0 0 0 0 0 0 0 0

TOTAL 1061650 571907.75 2690 168000 34500 32570 161420 0 0 1200 7600 636930 1500 3130 8078 4033
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road
Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd

Alignment
Alignment

Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 4100 PRIME COAT
41.01 PRIME COAT
(a) MC30 or equivalent (0.7 l/m2) litre 39,658.00 5.00 198,290.00 4.30 170,529.40 14,440.00 72,200.00 784.00 3,920.00 2,145.00 10,725.00 3,259.00 16,295.00 1,063.00 5,315.00 0.00 1,204.00 6,020.00 10,987.00 54,935.00 2,352.00 11,760.00 903.00 4,515.00 151.00 755.00 704.00 3,520.00 735.00 3,675.00 931.00 4,655.00

TOTAL 198,290.00 170,529.40 72,200.00 3,920.00 10,725.00 16,295.00 5,315.00 0.00 6,020.00 54,935.00 11,760.00 4,515.00 755.00 3,520.00 3,675.00 4,655.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment
Chestnut Rd

Rd Crossing

Pretoria Rd /
Rhodesfield

Interchange
Douglas Rd
TOTAL QTY

Cresslawn
Alignment

Lovato Rd

Lovato Rd

Ardeer Rd
Alignment
Deviation
AMOUNT

Deviation

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 4200 ASPHALT SURFACING AND BASE
ASPHALT BASE (60 to 100mm THICK, 60/70 PEN GRADE BITUMEN,
42.01 37,5mm MAXIMUM AGGREGATE SIZE):
(a) Continuously graded ton 5002 400.00 2,000,800.00 649.49 3,248,748.98 2465 986,000.00 0.00 450 180,000.00 0.00 0.00 0.00 0.00 1095 438,000.00 494 197,600.00 0.00 0.00 148 59,200.00 154 61,600.00 196 78,400.00
ASPHALT SURFACING (50mm THICK, 60/70 PEN GRADE BITUMEN, 19mm
42.02 MAXIMUM AGGREGATE SIZE):
(a) Continuously graded (medium) ton 0 792.62 0.00
ASPHALT SURFACING (35mm THICK, 60/70 PEN GRADE BITUMEN,
42.02 13,2mm MAXIMUM AGGREGATE SIZE):
(a) Continuously graded (medium) ton 3821 430.00 1,642,999.90 683.44 2,611,376.40 1440.93 619,599.90 96 41,280.00 263 113,090.00 399 171,570.00 130 55,900.00 0.00 147 63,210.00 638 274,340.00 288 123,840.00 111 47,730.00 18 7,740.00 86 36,980.00 90 38,700.00 114 49,020.00
42.04 TACK COAT OF 30% STABLE GRADE EMULSION (0.5 l/m2) litre 51294 3.00 153,882.00 5.72 293,401.68 20628 61,884.00 560 1,680.00 3064 9,192.00 2328 6,984.00 759 2,277.00 0.00 860 2,580.00 15696 47,088.00 3360 10,080.00 645 1,935.00 108 324.00 1006 3,018.00 1050 3,150.00 1230 3,690.00
ASPHALT SURFACING ON BRIDGE DECKS (50mm THICK, 60/70 PEN
42.09 GRADE BITUMEN, 13mm MAXIMUM AGGREGATE SIZE):
(a) Continuously graded (medium) ton 43 700.00 30,100.00 792.62 34,082.66 0.00 0.00 43 30,100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
42.21 ESTABLISHING THE ASPHALT PAVING PLANT ON SITE
(a) Establishing the paving unit No 13 25,000.00 325,000.00 6,382.80 82,976.40 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 0.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00 1 25,000.00
(b) Relocating the paving unit to new site No 17 7,500.00 127,500.00 6,382.80 108,507.60 1 7,500.00 1 7,500.00 1 7,500.00 1 7,500.00 1 7,500.00 0.00 4 30,000.00 1 7,500.00 1 7,500.00 2 15,000.00 1 7,500.00 1 7,500.00 1 7,500.00 1 7,500.00

TOTAL 4,280,281.90 6,379,093.72 1,699,983.90 75,460.00 364,882.00 211,054.00 90,677.00 0.00 120,790.00 791,928.00 364,020.00 89,665.00 40,564.00 131,698.00 135,950.00 163,610.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment
Rd Crossing

Pretoria Rd /
Chestnut Rd

Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd
Alignment

Ardeer Rd
Alignment
Deviation

Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 5100: PITCHING, STONEWORK ETC
51.01 Stone pitching
(a) Plain pitching
(i) Method 1 m2 182.00 70.00 12,740.00 73.62 13,398.84 120.00 8,400 0 14.00 980 0 0 0 0 0 48.00 3,360 0 0 0 0 0
(b) Grouted stone pitching m2 156.00 100.00 15,600.00 111.76 17,434.56 68.00 6,800 0 14.00 1,400 0 2.00 200 0 8.00 800 48.00 4,800 12.00 1,200 0 0 2.00 200 0 2.00 200
51.04 Concrete pitching and block paving
(a) Cast in situ concrete pitching m2 156.00 150.00 23,400.00 153.80 23,992.80 68.00 10,200 0 14.00 2,100 0 2.00 300 0 8.00 1,200 48.00 7,200 12.00 1,800 0 0 2.00 300 0 2.00 300
(b) Segmental block paving (60mm G-Block or
similar) for sidewalks m2 1,379.00 80.00 110,320.00 77.06 106,265.74 0 0 0 0 525.00 42,000 0 0 250.00 20,000 0 0 0 0 80.00 6,400 524.00 41,920
51.05 Concrete edge beams (Class 20/19) m3 10.10 1,150.00 11,615.00 1,019.80 10,299.98 0 0 0 0 5.00 5,750 0 0 0.10 115 0 0 0 0 0 5.00 5,750
51.07 Foundation trenches m3 25.30 60.00 1,518.00 81.22 2,054.87 0 0 0 0 12.00 720 0 0 0.30 18 0 0 0 0 0 13.00 780

TOTAL 175,193.00 173,446.79 25,400.00 0.00 4,480.00 0.00 48,970.00 0.00 2,000.00 32,133.00 6,360.00 0.00 0.00 500.00 6,400.00 48,950.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Chestnut Rd

Realignment
Rd Crossing

Pretoria Rd /
Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd
Alignment

Alignment
Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTI
ON 5200: GABIONS
52.02 Surface preparation m2 390.00 7.50 2,925.00 3.24 1,263.60 246.00 1,845.00 0.00 0.00 0.00 0.00 0.00 0.00 96 720.00 48 360.00 0.00 0.00 0.00 0.00 0.00
52.03 Gabions
(a) Galvanised gabion boxes m3 0.00 400.00 0.00 265.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(c) Galvanised gabion mattresses m3 90.00 450.00 40,500.00 325.96 29,336.40 57.00 25,650.00 0.00 0.00 0.00 0.00 0.00 0.00 22 9,900.00 11 4,950.00 0.00 0.00 0.00 0.00 0.00
52 Filter fabric m2 430.00 10.00 4,300.00 13.14 5,650.20 271.00 2,710.00 0.00 0.00 0.00 0.00 0.00 0.00 106 1,060.00 53 530.00 0.00 0.00 0.00 0.00 0.00

B52.05 Removal of gabion walls m3 0.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 47,725.00 36,250.20 30,205.00 0.00 0.00 0.00 0.00 0.00 0.00 11,680.00 5,840.00 0.00 0.00 0.00 0.00 0.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Rd Crossing
Chestnut Rd

Rhodesfield

Interchange
Douglas Rd
TOTAL QTY

Cresslawn
Lovato Rd

Ardeer Rd
Alignment

Alignment
Lovato Rd
Deviation

Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTI
ON 5400: GUARDRAILS
54.01 Guardrails on timber posts m 1,039.00 200.00 207,800.00 159.90 166,136.10 319.00 63,800.00 0.00 346.00 69,200.00 0.00 0.00 0.00 0.00 120.00 24,000.00 98.00 ### 0.00 0.00 0.00 0.00 156.00 31,200.00
Extra over items 54.01, 54.02 and
54.11 for horizontally curved
guardrails factory bent to a radius of
54.03 less than 45m m 44.00 100.00 4,400.00 50.00 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 4,400.00
54.04 End treatments
(a) End wings No. 9.00 125.00 1,125.00 180.00 1,620.00 2.00 250.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 500.00 2.00 250.00 0.00 0.00 0.00 0.00 1.00 125.00
(c) Bridge adaptors No. 4.00 2,450.00 9,800.00 3,840.00 15,360.00 0.00 0.00 4.00 9,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
54.05 Additional guardrail posts No. 120.00 65.00 7,800.00 130.00 15,600.00 20.00 1,300.00 0.00 40.00 2,600.00 0.00 0.00 0.00 0.00 40.00 2,600.00 10.00 650.00 0.00 0.00 0.00 0.00 10.00 650.00
54.07 Removing existing guardrails m 465.00 50.00 23,250.00 20.00 9,300.00 0.00 16.00 800.00 0.00 0.00 319.00 15,950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.00 6,500.00
Re-erection of guardrails with
54.09 recovered and/or new material
(a) Single guardrail m 338.00 50.00 16,900.00 30.00 10,140.00 0.00 19.00 950.00 0.00 0.00 319.00 15,950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
New material required for the re-
erection of guardrails with recovered
54.11 materials:
(a) Guardrails m 107.00 120.00 12,840.00 130.00 13,910.00 0.00 8.00 960.00 0.00 0.00 99.00 11,880.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Timber posts No. 91.00 65.00 5,915.00 50.00 4,550.00 0.00 6.00 390.00 0.00 0.00 85.00 5,525.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(d) Reflective plates No. 46.00 30.00 1,380.00 25.00 1,150.00 0.00 3.00 90.00 0.00 0.00 43.00 1,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(e) Spacer blocks No. 91.00 10.00 910.00 15.00 1,365.00 0.00 6.00 60.00 0.00 0.00 85.00 850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(f) Splice bolts complete with nut
and washer No. 91.00 10.00 910.00 5.00 455.00 0.00 6.00 60.00 0.00 0.00 85.00 850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(g) Post bolt complete with nut and
washer No. 91.00 15.00 1,365.00 17.50 1,592.50 0.00 6.00 90.00 0.00 0.00 85.00 1,275.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(h) reinforcing plates No. 91.00 7.50 682.50 5.00 455.00 0.00 6.00 45.00 0.00 0.00 85.00 637.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 295,077.50 243,833.60 65,350.00 3,445.00 81,600.00 0.00 54,207.50 0.00 0.00 27,100.00 ### 0.00 0.00 0.00 0.00 42,875.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Rd Crossing

Realignment

Pretoria Rd /
Chestnut Rd

Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Lovato Rd

Lovato Rd

Ardeer Rd
Alignment

Alignment
Deviation

Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 5500: FENCING
55.06 Providing temporary fencing and gates
(c) Pedestrian fence m 0.00 150.00 0.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(d) Temporary gates No 0.00 450.00 0.00 850.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Rhodesfield

Interchange
TOTAL QTY

Douglas Rd

Cresslawn
Alignment

Lovato Rd

Ardeer Rd
Alignment
Lovato Rd

Deviation
AMOUNT

Deviation

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
Rate

Rate

K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 5600: ROAD SIGNS

Road signboards with painted or coloured semi-matt background. Symbols,


lettering and borders in semi-matt black or in Class 1 retro-reflective material,
56.01 where the sign board is constructed from:

(c) Prepainted galvanised steel plate (chromadek or approved equivalent)


(i) Area not exceeding 2m2 m2 28.00 380.00 10,640.00 414.67 11,610.76 12.00 4,560.00 0.00 2.00 760.00 0.00 0.00 0.00 2.00 760.00 3.00 1,140.00 0.00 2.00 760.00 1.00 380.00 2.00 760.00 4.00 1,520.00 0.00
(ii) Area exceeding 2m2 but not 10m2 m2 30.00 400.00 12,000.00 387.73 11,631.90 7.00 2,800.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 3,600.00 0.00 0.00 0.00 0.00 14.00 5,600.00 0.00
56.03 Road sign supports (overhead road sign structures excluded)
(b) Timber:
(i) 100mm tip diameter m 143.00 40.00 5,720.00 45.29 6,476.47 46.00 1,840.00 0.00 17.00 680.00 0.00 0.00 0.00 17.00 680.00 13.00 520.00 0.00 17.00 680.00 0.00 8.00 320.00 25.00 1,000.00 0.00
(ii) 150mm tip diameter m 59.00 75.00 4,425.00 56.29 3,321.11 17.00 1,275.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 600.00 0.00 0.00 0.00 0.00 34.00 2,550.00 0.00
(iii) 200mm tip diameter m 15.00 135.00 2,025.00 67.29 1,009.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 2,025.00 0.00 0.00 0.00 0.00 0.00 0.00
Excavation and backfilling for road sign supports (not applicable to kilometre
56.05 posts) m3 17.00 150.00 2,550.00 132.77 2,257.09 7.00 1,050.00 0.00 1.00 150.00 0.00 0.00 0.00 1.00 150.00 6.00 900.00 0.00 1.00 150.00 0.00 1.00 150.00 0.00 0.00
Provision and installation of a new set of signals including all associated
electronic equipment, ducts, cables and power connections at the following
B56.10 locations:
(a) Intersection Marlboro Station Access Road and Far East Bank (Refer Dwg
No. 00401914) No 0.00 500,000.00 0.00 250,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) London Road Interchange: Western Ramps Intersection No 1.00 500,000.00 500,000.00 250,000.00 250,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 500,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Relocation of existing signal poles including all associated electronic


B56.11 equipment, ducts, cables and power connections at the following locations:
(a) Intersection Marlboro Drive and Northway (Refer Dwg No.
00401798) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(b) Intersection Marlboro Drive and Southway (Refer Dwg No.
00401776) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

(c) Intersection K115 and Modderfontein Road (To suit new intersection layout) No 2.98 5,000.00 14,900.00 150,000.00 447,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.98 14,900.00 0.00 0.00 0.00 0.00 0.00 0.00
(d) Intersection Andre Greyvenstein and Pretoria Roads (Refer
Dwg No. 00401768 Sheets 2 and 3) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(f) Temporary relocation of poles at Intersection N3 Northbound Ramps and
Marlboro Drive (Refer Dwg No. 00401780) No 1.00 5,000.00 5,000.00 150,000.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(g) Restoration of poles at Intersection N3 Northbound Ramps and Marlboro
Drive (Refer Dwg No. 00401780) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(h) Temporary relocation of poles at Intersection N3 Southbound Ramps and
Marlboro Drive (Refer Dwg No. 00401780) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i) Restoration of poles at Intersection N3 Southbound Ramps and Marlboro
Drive (Refer Dwg No. 00401780) No 0.00 5,000.00 0.00 150,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 557,260.00 883,306.68 11,525.00 0.00 1,590.00 0.00 0.00 0.00 506,590.00 23,685.00 0.00 1,590.00 380.00 1,230.00 10,670.00 0.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
TOTAL QTY

Realignment
Rd Crossing

Pretoria Rd /
Chestnut Rd

Rhodesfield

Interchange
Douglas Rd

Cresslawn
Lovato Rd
Alignment

Alignment
Lovato Rd

Ardeer Rd
Deviation

Deviation
AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
K115

Antwerp /
Rate

Rate
UNIT

ITEM DESCRIPTION

SECTION 5700: ROAD MARKINGS

Removal of existing permanent roadmarkings for modification Lump


B57.09 of existing configuration sum 5.00 20,000.00 100,000.00 21,000.00 105,000.00 1.00 20,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20,000.00 0.00 0.00 1.00 20,000.00 1.00 20,000.00 1.00 20,000.00
Setting out, premarking and painting roadmarkings, lettering,
B57.10 symbols and islands as shown on the drawings:
(a) Lines (all colours)
km of
(i) For single lane widening roadway 0.20 5,000.00 1,000.00 3,950.00 790.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 1,000.00
km of
(ii) For 2 lane configuration roadway 2.40 7,500.00 18,000.00 6,250.00 15,000.00 0.90 6,750.00 0.00 0.50 3,750.00 0.00 0.00 0.00 0.00 0.00 0.60 4,500.00 0.00 0.00 0.20 1,500.00 0.20 1,500.00 0.00
km of
(iii) For 3 lane configuration roadway 0.40 10,000.00 4,000.00 8,450.00 3,380.00 0.00 0.00 0.00 0.00 0.30 3,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 1,000.00
km of
(iv) For 4 lane configuration roadway 2.40 12,500.00 30,000.00 10,300.00 24,720.00 1.80 22,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 7,500.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lump
(b) Lettering and symbols (all colours) sum 4.00 500.00 2,000.00 2,500.00 10,000.00 1.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 500.00 0.00 0.00 0.00 0.00 1.00 500.00 1.00 500.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.00 0.00
(c) Traffic islands (fully marked area) m2 460.00 55.00 25,300.00 50.00 23,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 460.00 25,300.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL 180,300.00 181,890.00 49,750.00 0.00 3,750.00 0.00 3,000.00 0.00 0.00 33,300.00 24,500.00 0.00 0.00 21,500.00 22,000.00 22,500.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
TOTAL QTY

Realignment
Rd Crossing

Pretoria Rd /
Chestnut Rd

Rhodesfield

Interchange
Douglas Rd
Alignment

Lovato Rd

Alignment

Cresslawn
Lovato Rd

Ardeer Rd
Deviation
Deviation
AMOUNT

AMOUNT

Crossing

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Closure

Closure

Andre
K115
Rate

Rate

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 5800 LANDSCAPING AND PLANTING PLANTS
58.01 Trimming
(a) Machine trimming m2 15,456.00 1.25 19,320.00 1.02 15,765.12 0.00 1120 1400.00 0.00 4656 5820.00 600 750.00 5000 6250.00 0.00 0.00 0.00 3600 4500.00 0.00 480 600.00 0.00 0.00
(b) Hand trimming m2 600.00 2.00 1,200.00 0.90 540.00 0.00 0.00 0.00 0.00 600 1200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.03 Preparing the areas for grassing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(a) Ripping ha 1.49 3,500.00 5,215.00 900.00 1,341.00 0.00 0.11 385.00 0.00 0.47 1645.00 0.00 0.50 1750.00 0.00 0.00 0.00 0.36 1260.00 0.00 0.05 175.00 0.00 0.00
(b) Scarifying for loosening topsoil ha 0.00 5,000.00 0.00 900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(c) Topsoiling within the road reserve,where the following materials are used:

(i) Topsoil obtained from within the rail reserve or borrow areas (free haul 1,0km) m3 7,810.00 25.00 195,250.00 22.41 175,022.10 2,759.00 68975.00 224.00 5600.00 446.00 11150.00 1,448.00 36200.00 120.00 3000.00 1,000.00 25000.00 28.00 700.00 610.00 15250.00 581.00 14525.00 381.00 9525.00 7.00 175.00 116.00 2900.00 22.00 550.00 68.00 1700.00
(e) Providing and applying chemical fertilizers etc 0.00
(iv) 2:3:2(22) t 4.36 5,000.00 21,800.00 2,260.00 9,853.60 1.16 5800.00 0.70 3500.00 0.27 1350.00 0.87 4350.00 0.07 350.00 0.30 1500.00 0.02 100.00 0.37 1850.00 0.25 1250.00 0.23 1150.00 0.00 0.07 350.00 0.01 50.00 0.04 200.00
(f) Stockpiling topsoil (free haul 1,0km) m3 19,753.00 20.00 395,060.00 9.69 191,406.57 8,809.00 176180.00 224.00 4480.00 0.00 1,448.00 28960.00 0.00 0.00 229.00 4580.00 6,401.00 128020.00 1,810.00 36200.00 229.00 4580.00 14.00 280.00 175.00 3500.00 168.00 3360.00 246.00 4920.00
58.04 Grassing
(a) The planting of grass cuttings (kikiyu) ha 4.62 100,000.00 462,000.00 10,000.00 46,200.00 1.93 193000.00 0.11 11000.00 0.45 45000.00 0.00 1.20 120000.00 0.00 0.00 0.00 0.41 41000.00 0.38 38000.00 0.00 0.12 12000.00 0.02 2000.00 0.00
(b) Sodding by using the following types of sods
(i) Nursery sods (kikiyu) m2 4,053.00 10.00 40,530.00 17.50 70,927.50 0.00 0.00 0.00 0.00 0.00 1,500.00 15000.00 280.00 2800.00 1,521.00 15210.00 0.00 0.00 70.00 700.00 0.00 0.00 682.00 6820.00
(c) Hydroseeding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i) Providing an approved seed mixture for hydroseeding kg 111.00 10.00 1,110.00 56.00 6,216.00 0.00 0.00 0.00 100.00 1000.00 0.00 0.00 0.00 11.00 110.00 0.00 0.00 0.00 0.00 0.00 0.00
(ii) Providing and approved mulch kg 566.00 10.00 5,660.00 15.00 8,490.00 0.00 0.00 0.00 0.00 0.00 245.00 2450.00 0.00 321.00 3210.00 0.00 0.00 0.00 0.00 0.00 0.00
(iii) Hydroseeding ha 2.26 0.00 3,000.00 6,780.00 0.00 0.00 0.00 1.45 0.00 0.00 0.35 0.00 0.00 0.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58.05 Watering the grass when established by topsoiling only kl 234.00 20.00 4,680.00 15.00 3,510.00 208.00 4160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 520.00 0.00 0.00 0.00 0.00 0.00
Watering the already planted grass, trees and shrubs during periods of drought
58.06 experienced during the growing season kl 1,393.00 20.00 27,860.00 15.00 20,895.00 482.00 9640.00 28.00 560.00 0.00 362.00 7240.00 0.00 125.00 2500.00 0.00 153.00 3060.00 102.00 2040.00 95.00 1900.00 0.00 29.00 580.00 0.00 17.00 340.00
58.07 Mowing the grass ha 18.10 2,000.00 36,200.00 1,000.00 18,100.00 1.93 3860.00 1.12 2240.00 4.46 8920.00 0.00 0.60 1200.00 0.30 600.00 0.06 120.00 0.00 4.09 8180.00 3.81 7620.00 0.01 20.00 1.16 2320.00 0.22 440.00 0.34 680.00
58.1 Extra work for landscaping Prov. Sum 5.00 1.00 5.00 10,000.00 50,000.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00

58.11 Weeding all grass-seeded areas and the grass when established by topsoiling only ha 4.99 1,500.00 7,485.00 750.00 3,742.50 0.42 630.00 0.00 0.00 2.90 4350.00 0.00 0.70 1050.00 0.00 0.92 1380.00 0.05 75.00 0.00 0.00 0.00 0.00 0.00

TOTAL 1,223,375.00 761,129.00 462,246.00 29,165.00 66,420.00 89,565.00 126,500.00 56,101.00 8,300.00 168,091.00 103,790.00 68,535.00 1,175.00 22,425.00 6,401.00 14,661.00
DP4 PRELIMINARY QUANTITY SUMMARY FOR ROADWORKS THYS BUDGET

TOTAL AMOUNT

TOTAL AMOUNT

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Centenary Rd
Pressburg Rd

Greyvenstein
Chestnut Rd
TOTAL QTY

Realignment

Pretoria Rd /
Rd Crossing

Rhodesfield

Interchange
Douglas Rd

Cresslawn
Alignment

Lovato Rd

Lovato Rd

Alignment
Ardeer Rd
AMOUNT

Deviation

AMOUNT

AMOUNT

Deviation

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT
Crossing

Closure

Closure

Andre
K115

Antwerp /
Rate

Rate
UNIT

ITEM DESCRIPTION
5900 FINISHING THE ROAD AND ROAD RESERVE AND TREATING OLD
SECTION ROADS
59.01 FINISHING THE ROAD AND ROAD RESERVE:
(a) Single carriageway of road reserve km 4.60 7,500.00 34,500.00 6,412.42 29,497.13 1.60 12000.0 0.0 0.40 3000.0 0.0 0.0 0.0 0.40 3000.0 0.60 4500.0 0.60 4500.0 0.30 2250.0 0.10 750.0 0.10 750.0 0.20 1500.0 0.30 2250.0

TOTAL 34,500.00 29,497.13 12,000.00 0.00 3,000.00 0.00 0.00 0.00 3,000.00 4,500.00 4,500.00 2,250.00 750.00 750.00 1,500.00 2,250.00
PRELIMINARY QUANTITY
DP4 SUMMARY FOR ROADWORKS

Centenary Road

Centenary Road

Hilton, Clulee &


Modderfontein

Pressburg Rd

Centenary Rd

Greyvenstein
Realignment

Pretoria Rd /
Chestnut Rd

Rd Crossing

Rhodesfield

Interchange
Douglas Rd

Cresslawn
Alignment

Lovato Rd

Alignment
Lovato Rd

Ardeer Rd
Deviation

Deviation
Crossing

Closure

Closure

Andre
K115

Antwerp /
UNIT

ITEM DESCRIPTION
SECTION 6700 STRUCTURAL STEELWORK

(a) Erection and subsequent removal of temporary


prefabricated steel pedestrian bridge at Marlboro
interchange over widened southbound ramps.
Refer drawing CIV 040 D01 00401 612 01

B67.01
Approximate quantity of structural steel, Supports
5.0 ton, Deck 7.2 ton, stairs 3.0 ton. No 0.00
ITEM
DESCRIPTION

(ii) Wall of average height 5m


(i) Wall of average height 4,5m
PRELIMINARY QUANTITY

74.01 (a) Loffelstein earth retaining systems


DP4 SUMMARY FOR ROADWORKS

SECTION 7400: PATENTED EARTH RETAINING SYSTEMS

m2
m2
UNIT

Centenary Road
Alignment

Centenary Road
Deviation

Lovato Rd
Crossing

Lovato Rd
Deviation

Chestnut Rd

Modderfontein
Rd Crossing

Rhodesfield
Closure

K115

Ardeer Rd
Alignment

Hilton, Clulee &


Douglas Rd

Cresslawn
Closure

Pressburg Rd
Realignment

Antwerp /
Centenary Rd
Interchange

Pretoria Rd /
Andre
Greyvenstein
0
0
1,200.00
1,100.00

0.00
0.00
0.00

Вам также может понравиться