Cable profile for Prestressing and calculation of eccentricities of substiture cable

Span, L 25.0 m 0.5 Equivalent of 4 cables concentrated in one


Girder depth 1.500 m Substitute cable
Yt 0.9102 m 0.3
Yb 0.5898 m
Let girder extend behind support, a = 0.0
a 0.3 m -0.3 4.0 8.2 12.5 16.7 21.0 25.3
1.5
Cable prifile - 4 Groups shown
1.0 among them 3- groups coicide
0.5

0.0 0.435 9.31 25.62


Mid Section -0.3 4.0 8.2 12.53.500 16.7 21.0 25.3
Cable profiles and planning:
Cable Profile measured from bottom at a distance from the left support, m
X in
No -0.300 0.000 3.125 6.250 9.000 9.375 12.500 15.625 16.000 18.750 21.875 25.000 25.300
metre
o
θ 6.529 6.529 6.529 6.529 0.000 0.000 0.000 0.000 0.000 6.529 6.529 6.529 6.529
1 Profile
from girder 1.314 1.280 0.922 0.565 0.250 0.250 0.250 0.250 0.250 0.565 0.922 1.280 1.314
soffit
o
θ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1 Profile
from girder 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
soffit
θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2 Profile
from girder 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100
soffit
4
Calulations of substitute cable profile
Cable Nos. -0.300 0.000 3.125 6.250 9.000 9.375 12.500 15.625 16.000 18.750 21.875 25.000 25.300
o
θ 6.529 6.529 6.529 6.529 0.000 0.000 0.000 0.000 0.000 6.529 6.529 6.529 6.529
1
eccentricity -0.724 -0.690 -0.333 0.025 0.340 0.340 0.340 0.340 0.340 0.025 -0.333 -0.690 -0.724
θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1
eccentricity 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490
θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
2
eccentricity 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490
4 Avg θo 1.632 1.632 1.632 1.632 0.000 0.000 0.000 0.000 0.000 1.632 1.632 1.632 1.632
Cable profile from bottom 0.404 0.395 0.306 0.216 0.138 0.138 0.138 0.138 0.138 0.216 0.306 0.395 0.404
Calculation of eccentricity of substitute cable before composite action
Beam depth 1.500
Yt 0.910 at mid section before composite action
Yb 0.5898 at mid section before compsite action
Yt 0.888 at end section before composite action
Yb 0.612 at end section before composite action
Calculation of eccentricity of substitute cable before composite action
Cable
Layer No. -0.300 0.000 1.588 3.125 6.250 9.000 9.375 12.500
Nos.
1 1 θo 6.529 6.529 6.529 6.529 6.529 0.000 0.000 0.000
e -0.703 -0.668 -0.487 -0.333 0.025 0.340 0.340 0.340
2 1 θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
e 0.512 0.512 0.512 0.490 0.490 0.490 0.490 0.490
3 2 θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
e 0.512 0.512 0.512 0.490 0.490 0.490 0.490 0.490
Avg e 0.208 0.217 0.262 0.284 0.374 0.452 0.452 0.452
Calculation of eccentricity of substitute cable after composite action
Beam depth 1.700
Yt 0.757 at mid section after composite action
Yb 0.943 at mid section after composite action
Yt 0.899 at end section after composite action
Yb 0.801 at end section after composite action
Calculation of eccentricity of substitute cable after composite action
Cable
Layer No. -0.300 0.000 1.588 3.125 6.250 9.000 9.375 12.500
Nos.
o
1 1 θ 6.529 6.529 6.529 6.529 6.529 0.000 0.000 0.000
e-0.513 -0.479 -0.297 0.020 0.378 0.693 0.693 0.693
o
2 1 θ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
e 0.701 0.701 0.701 0.843 0.843 0.843 0.843 0.843
o
3 2 θ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
e 0.701 0.701 0.701 0.843 0.843 0.843 0.843 0.843
Avg e 0.397 0.406 0.451 0.637 0.726 0.805 0.805 0.805
Coordinate system:
X (Global Coordinate System) = 0 at the support and +ve along longitudinal/Vehicle direction
Y (Global Coordinate System) = 0 at soffit of Girder and +ve Vertical upward
Z (Local Coordinate) = 0 at centre of respective web
X in metre -0.300 0 3.125 6.250 9.000 9.375 12.500 15.625 16.000 18.750 21.875 25.000 25.300
Cable Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z
1 1314.3 0.0 1280.0 0.0 922.3 0.0 564.7 0.0 250.0 0.0 250.0 0.0 250.0 0.0 250.0 0.0 250.0 0.0 564.7 0.0 922.3 0.0 1280.0 0.0 1314.3 0.0
2 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0
3 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 0.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0
4 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 0.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0
Calculation of theoritcal elongations of cables
Prestressing force/cable, P 1415.00 KN
2
Young's modulus of Elasticity, E 195000 N/mm
Cable specification 12 19K13 12.7 mm
Area of one wire Aw 98.70 mm 2
Areafactor 0.7791
2
Area of one cable 1184.40 mm
2
Cable stress due to Prestressing force 1194.70 N/mm
% Cable strain due to Prestressing force 0.61267 %
Prestressing activities from both ends in Single girder
Extension of Emerging Required
Sequence of
Cable ID L,m cable per side, angle in Jacking
Prestressing
mm Degree force
1 25.721 78.793 6.529 1415.00 Ist Upper one
nd
2 25.600 78.421 0.000 1415.00 2 bottom middle
rd th
3,4 25.600 78.421 0.000 1415.00 3 and 4 bottom edges
Note: If Cable extension is less than 200mm two stages of prestressing are not required.
Single stage of prestressing of 4 cables in a girder.