The document discusses the cable profile and eccentricity calculations for prestressing a bridge girder with 4 cables. It provides the girder dimensions, cable profiles at different points along the girder, calculations of the cable eccentricities before and after composite action, and calculations of the theoretical elongations of the cables from prestressing. The cable profile and eccentricity calculations are performed to determine the positioning of the cables within the girder cross-section.
The document discusses the cable profile and eccentricity calculations for prestressing a bridge girder with 4 cables. It provides the girder dimensions, cable profiles at different points along the girder, calculations of the cable eccentricities before and after composite action, and calculations of the theoretical elongations of the cables from prestressing. The cable profile and eccentricity calculations are performed to determine the positioning of the cables within the girder cross-section.
The document discusses the cable profile and eccentricity calculations for prestressing a bridge girder with 4 cables. It provides the girder dimensions, cable profiles at different points along the girder, calculations of the cable eccentricities before and after composite action, and calculations of the theoretical elongations of the cables from prestressing. The cable profile and eccentricity calculations are performed to determine the positioning of the cables within the girder cross-section.
Cable profile for Prestressing and calculation of eccentricities of substiture cable
Span, L 25.0 m 0.5 Equivalent of 4 cables concentrated in one
Girder depth 1.500 m Substitute cable Yt 0.9102 m 0.3 Yb 0.5898 m Let girder extend behind support, a = 0.0 a 0.3 m -0.3 4.0 8.2 12.5 16.7 21.0 25.3 1.5 Cable prifile - 4 Groups shown 1.0 among them 3- groups coicide 0.5
0.0 0.435 9.31 25.62
Mid Section -0.3 4.0 8.2 12.53.500 16.7 21.0 25.3 Cable profiles and planning: Cable Profile measured from bottom at a distance from the left support, m X in No -0.300 0.000 3.125 6.250 9.000 9.375 12.500 15.625 16.000 18.750 21.875 25.000 25.300 metre o θ 6.529 6.529 6.529 6.529 0.000 0.000 0.000 0.000 0.000 6.529 6.529 6.529 6.529 1 Profile from girder 1.314 1.280 0.922 0.565 0.250 0.250 0.250 0.250 0.250 0.565 0.922 1.280 1.314 soffit o θ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1 Profile from girder 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 soffit θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2 Profile from girder 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 soffit 4 Calulations of substitute cable profile Cable Nos. -0.300 0.000 3.125 6.250 9.000 9.375 12.500 15.625 16.000 18.750 21.875 25.000 25.300 o θ 6.529 6.529 6.529 6.529 0.000 0.000 0.000 0.000 0.000 6.529 6.529 6.529 6.529 1 eccentricity -0.724 -0.690 -0.333 0.025 0.340 0.340 0.340 0.340 0.340 0.025 -0.333 -0.690 -0.724 θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1 eccentricity 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2 eccentricity 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 0.490 4 Avg θo 1.632 1.632 1.632 1.632 0.000 0.000 0.000 0.000 0.000 1.632 1.632 1.632 1.632 Cable profile from bottom 0.404 0.395 0.306 0.216 0.138 0.138 0.138 0.138 0.138 0.216 0.306 0.395 0.404 Calculation of eccentricity of substitute cable before composite action Beam depth 1.500 Yt 0.910 at mid section before composite action Yb 0.5898 at mid section before compsite action Yt 0.888 at end section before composite action Yb 0.612 at end section before composite action Calculation of eccentricity of substitute cable before composite action Cable Layer No. -0.300 0.000 1.588 3.125 6.250 9.000 9.375 12.500 Nos. 1 1 θo 6.529 6.529 6.529 6.529 6.529 0.000 0.000 0.000 e -0.703 -0.668 -0.487 -0.333 0.025 0.340 0.340 0.340 2 1 θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 e 0.512 0.512 0.512 0.490 0.490 0.490 0.490 0.490 3 2 θo 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 e 0.512 0.512 0.512 0.490 0.490 0.490 0.490 0.490 Avg e 0.208 0.217 0.262 0.284 0.374 0.452 0.452 0.452 Calculation of eccentricity of substitute cable after composite action Beam depth 1.700 Yt 0.757 at mid section after composite action Yb 0.943 at mid section after composite action Yt 0.899 at end section after composite action Yb 0.801 at end section after composite action Calculation of eccentricity of substitute cable after composite action Cable Layer No. -0.300 0.000 1.588 3.125 6.250 9.000 9.375 12.500 Nos. o 1 1 θ 6.529 6.529 6.529 6.529 6.529 0.000 0.000 0.000 e-0.513 -0.479 -0.297 0.020 0.378 0.693 0.693 0.693 o 2 1 θ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 e 0.701 0.701 0.701 0.843 0.843 0.843 0.843 0.843 o 3 2 θ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 e 0.701 0.701 0.701 0.843 0.843 0.843 0.843 0.843 Avg e 0.397 0.406 0.451 0.637 0.726 0.805 0.805 0.805 Coordinate system: X (Global Coordinate System) = 0 at the support and +ve along longitudinal/Vehicle direction Y (Global Coordinate System) = 0 at soffit of Girder and +ve Vertical upward Z (Local Coordinate) = 0 at centre of respective web X in metre -0.300 0 3.125 6.250 9.000 9.375 12.500 15.625 16.000 18.750 21.875 25.000 25.300 Cable Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z 1 1314.3 0.0 1280.0 0.0 922.3 0.0 564.7 0.0 250.0 0.0 250.0 0.0 250.0 0.0 250.0 0.0 250.0 0.0 564.7 0.0 922.3 0.0 1280.0 0.0 1314.3 0.0 2 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 3 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 0.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 100.0 -300.0 4 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 0.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 100.0 300.0 Calculation of theoritcal elongations of cables Prestressing force/cable, P 1415.00 KN 2 Young's modulus of Elasticity, E 195000 N/mm Cable specification 12 19K13 12.7 mm Area of one wire Aw 98.70 mm 2 Areafactor 0.7791 2 Area of one cable 1184.40 mm 2 Cable stress due to Prestressing force 1194.70 N/mm % Cable strain due to Prestressing force 0.61267 % Prestressing activities from both ends in Single girder Extension of Emerging Required Sequence of Cable ID L,m cable per side, angle in Jacking Prestressing mm Degree force 1 25.721 78.793 6.529 1415.00 Ist Upper one nd 2 25.600 78.421 0.000 1415.00 2 bottom middle rd th 3,4 25.600 78.421 0.000 1415.00 3 and 4 bottom edges Note: If Cable extension is less than 200mm two stages of prestressing are not required. Single stage of prestressing of 4 cables in a girder.