ASSEMBLY & STORES

S.No. Topic

1 Business Process

2 Location

3 Stores

4 Products

5 Process flow

6 Assembly

7 Required details

8 Unit of Measurements

9 Reports at Stores
ASSEMBLY & STORES
AS IS Process

Assembly and Stores

Production Plant

There are two stores. One for Raw material and another one for Finished goods

TAPS | VALVES | FAUCETS | SHOWERS | ACCESSORIES

Batch concept is maintained for finished products

Management received purchase orders from its branches. As per the branches order, Management plan the production and th
Stores persons check the stock availability (Min stock,Max stock)
If stock is not there then, stores person raise the purchase request to purchase department with approval
With respect to the purchase request, purchase process initiated by purchase department
Against the purchasce order material getting into to the company. After inspection materials are stores in the respective stores
Production plan copy should be given to production incharge. For the plan production side request the rawmaterial to start the p
Production department sent a mail to stores person for their production raw material requirement
Weekly indent prepared by production department (Masilamani) based on that plant material should be issued
Raw material issued by the stores for the respective production plan. Manual register maintained
Module setting process initiated on the suitable machine
First shot inspection should be carried out. If inspection is ok then production should be continued.
On the first shot checking various inspection process should carried out. (runner weight,component weight)
After finishing the production, Inspection carried out. Then the product should transferred to Finished googs stores

Semi finished goods are issued by stores to assembly area


Assembly process should carried out.
While doing assemby, inspection should be conducted like water testing,air testing
Once the inspection is completed then packing process initiated
Barcode should be pasted on the packing box
Finaly product should moved to finished goods area

All the Finished Goods should have Bill of Material


Child parts Bill of Material required
Raw material details required

Kgs,Numbers,Liters,meter, rolls

Daily consumption details


Daily despatch details
Stock ledger for (FG & RM) - Item wise and group wise
Minimum and Maximum level stock report
store wise stock report
Non movable item list store wise
Purchase request indent details
Monthly stock auditing report
AQUATEK SANITARY FITTINGS PRIVATE LIMITED - COIMBATORE
BILL OF MATERIAL
FG Premium Pillar Child Part Requirement 1

Sl. No. Part Name Base Qty


1 Logo Sheet 1
2 Crystal 1
3 Blue Ring 1
4 Screw 6 x 16 1
5 Cap 1
6 Bonnet Assembly Parts - 1
Male 1
Female 1
Leak Washer 1
End Washer 1
Bonnet 1
Bonnet O Ring 25 x 2.5 1
Spindle O Ring 14 x 2.6 1
Grease 1
7 Premium Pillar Main Body 1
8 Dummy Cap 1
9 Gum 1
10 Viking Filter 1
Viking Filter 1
Silicon O Ring 17 x 2 1
Premium Pillar Housing 1
11 PP Flange ( 2 nos) 2
12 Washer 20 x 49 x 4 1
13 Washer 20 x 39 x 2.8 1
14 Lock Nut 1
15 Hallogram Sticker 1
16 PP Cover 7 x 9 1
17 Packing Box 1
18 Barcode Sticker 1
19 Cello Tape 1
ORE

No

In House / Out sourcing


In Hose
In Hose
In Hose
Out Sourcing
In Hose

In Hose
In Hose
In Hose
In Hose
In Hose
Out Sourcing
Out Sourcing

In Hose
In Hose
Out Sourcing

Out Sourcing
Out Sourcing
In Hose
In Hose
Out Sourcing
Out Sourcing
Out Sourcing with material

Out Sourcing
FG

Sl. No.
1
2
3
4
5
6

7
8
9
10
11
12
13
14
AQUATEK SANITARY FITTINGS PRIVATE LIMITED - COIMBATORE
BILL OF MATERIAL
180 mm Long Body Child Part Requirement

Part Name
Logo Sheet
Crystal
Blue Ring
Screw 6 x 16
Cap
Bonnet Assembly Parts -
Male
Female
Leak Washer
End Washer
Bonnet
Bonnet O Ring 25 x 2.5
Spindle O Ring 14 x 2.6
Grease
180 mm Long Body Main Body
Long Body Filter
Hallogram Sticker
Medium Flange
PP Cover 5.5 x 8.5
Packing Box
Barcode Sticker
Cello Tape
1 No

Qty In House / Out sourcing


In Hose
In Hose
In Hose
Out Sourcing
In Hose

In Hose
In Hose
In Hose
In Hose
In Hose
Out Sourcing
Out Sourcing
Out Sourcing
In Hose
Out Sourcing with material
Out Sourcing
In Hose
Out Sourcing
Out Sourcing
Out Sourcing
Out Sourcing