Академический Документы
Профессиональный Документы
Культура Документы
S.No. Topic
1 Business Process
2 Location
3 Stores
4 Products
5 Process flow
6 Assembly
7 Required details
8 Unit of Measurements
9 Reports at Stores
ASSEMBLY & STORES
AS IS Process
Production Plant
There are two stores. One for Raw material and another one for Finished goods
Management received purchase orders from its branches. As per the branches order, Management plan the production and th
Stores persons check the stock availability (Min stock,Max stock)
If stock is not there then, stores person raise the purchase request to purchase department with approval
With respect to the purchase request, purchase process initiated by purchase department
Against the purchasce order material getting into to the company. After inspection materials are stores in the respective stores
Production plan copy should be given to production incharge. For the plan production side request the rawmaterial to start the p
Production department sent a mail to stores person for their production raw material requirement
Weekly indent prepared by production department (Masilamani) based on that plant material should be issued
Raw material issued by the stores for the respective production plan. Manual register maintained
Module setting process initiated on the suitable machine
First shot inspection should be carried out. If inspection is ok then production should be continued.
On the first shot checking various inspection process should carried out. (runner weight,component weight)
After finishing the production, Inspection carried out. Then the product should transferred to Finished googs stores
Kgs,Numbers,Liters,meter, rolls
No
In Hose
In Hose
In Hose
In Hose
In Hose
Out Sourcing
Out Sourcing
In Hose
In Hose
Out Sourcing
Out Sourcing
Out Sourcing
In Hose
In Hose
Out Sourcing
Out Sourcing
Out Sourcing with material
Out Sourcing
FG
Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
AQUATEK SANITARY FITTINGS PRIVATE LIMITED - COIMBATORE
BILL OF MATERIAL
180 mm Long Body Child Part Requirement
Part Name
Logo Sheet
Crystal
Blue Ring
Screw 6 x 16
Cap
Bonnet Assembly Parts -
Male
Female
Leak Washer
End Washer
Bonnet
Bonnet O Ring 25 x 2.5
Spindle O Ring 14 x 2.6
Grease
180 mm Long Body Main Body
Long Body Filter
Hallogram Sticker
Medium Flange
PP Cover 5.5 x 8.5
Packing Box
Barcode Sticker
Cello Tape
1 No
In Hose
In Hose
In Hose
In Hose
In Hose
Out Sourcing
Out Sourcing
Out Sourcing
In Hose
Out Sourcing with material
Out Sourcing
In Hose
Out Sourcing
Out Sourcing
Out Sourcing
Out Sourcing