Вы находитесь на странице: 1из 2

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
A

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
A 4/26/2018 BI-2018050 ISSUED FOR 90% DESIGN REVIEW RPM MNC
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

MNC
APPROVAL/CERTIFICATION REQUIREMENTS,

RPM/ZSK

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED

OPERATIONS
04/26/2018
04/26/2018

CONSTRUCTION
(DCC) NO. 2018050
_____________________ DATE:

YANBU
Saudi Aramco 2616-ENG (03/99)

IO LIST FOR PLC


SANITARY SYSTEM CONNECTION
DOC

SAUDI ARABIA
APRIL 2018
BI-2018050

V 93
JO / EWO:
J
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

2018050
INPUT/OUTPUT LIST - PLC

ISSUED FOR 90% DESIGN REVIEW

DRAWING NO.

V93-IN-IO-0001

2
1
71/72 TO BERTH 69 SP3 TREATMENT UNIT

OF
SHT.NO.
SANITARY SYSTEM CONNECTION FROM BERTH

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
V93-CR-PLC-MR-0-004
MNC
ENGG CERT

INPUT/OUTPUT LIST
RPM

TAG NO SERVICE TYPE SIGNAL P & ID


ANALOG INPUT
V93-SP3-PID-
V93-LIT-XXXX LEVEL TRANSMITTER AI 4-20 mA
XXXA
ISSUED FOR 90% DESIGN REVIEW

DIGITAL INPUT
DESCRIPTION

FOR PUMP V93-G-0226A LOCAL/REMOTE


V93-YI-0226A DI 24 V DC V93-SP3-PID-
INDICATION
XXXA

V93-HS-0226A FOR PUMP V93-G-0226A STOP INDICATION DI 24 V DC V93-SP3-PID-


XXXA
FOR PUMP V93-G-0226B LOCAL/REMOTE
V93-YI-0226B DI 24 V DC V93-SP3-PID-
INDICATION
XXXA

V93-HS-0226B FOR PUMP V93-G-0226B LOCAL STOP INDICATION DI 24 V DC V93-SP3-PID-


XXXA
JO/EWO
4/26/2018 BI-2018050

DIGITAL OUTPUT
DATE

V93-YS-0226AB START COMMNAND FOR PUMP V93-G-0226A DO 24 V DC V93-SP3-PID-


XXXA
NO.
REV

DISCIPLINE V93-YS-0226AA STOP COMMAND FOR PUMP V93-G-0226A DO 24 V DC V93-SP3-PID-


ENGINEER XXXA
RPM/ZSK
04/26/2018
DATE: V93-YS-0226BB START COMMAND FOR PUMP V93-G-0226B DO 24 V DC V93-SP3-PID-
PROJECT
ENGINEER
XXXA

V93-YS-0226BA STOP COMMAND FOR PUMP V93-G-0226B DO 24 V DC V93-SP3-PID-


DATE:
XXXA
CERTIFIED
MNC

04/26/2018
DATE:
V93-CR-PLC-MR-0-004 I/O SUMMARY
CONSTRUCTION
AGENCY
REQUIREMENTS REMARKS
DATE:
OPERATIONS DI 05

DO 05
DATE:
AI 01
CONTROL NUMBER
VERIFICATION

AO 00
EDSD

DATE:

Note:
BY:

1. THE ABOVE IO LIST ARE INCLUDING 5% SPARE I/O.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

_____________________

V
(DCC) NO. 2018050

IO LIST FOR PLC DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SANITARY SYSTEM CONNECTION DOC


V 93 V93-IN-IO-0001 2
J OF A
YANBU SAUDI ARABIA JO / EWO: 2018050 2
EDSD/2616-0399.doc