Вы находитесь на странице: 1из 2

Civil Engineering November 2020 Review Innovations Surveying 1

Surveying has to do with the determination of the •Hydrographic Survey - The survey of bodies of c. If the same tape is used to set a baseline with
relative spatial location of the points on or near the water made for the purpose of navigation, water length of 837.5m, determine the actual distance
surface of the earth. It is the art of measuring supply, or sub-aqueous construction. to be laid out.
horizontal and vertical distances between objects, •Mining Survey - Made to control, locate and map
of measuring angles between lines, of determining underground and surface works related to mining Problem 3:
the direction of lines, and of establishing points by operations. A 100 m steel tape is used to measure the distance
predetermined angular and linear measurement. •Construction Survey - Made to lay out, locate and of the line and found to be 1539.28 m long. During
Geodetic Surveying - the type of surveying monitor public and private engineering works. measurement, the tape is supported at the ends
which takes into account the true shape of the •Route Survey - Refers to those control, under a pull of 10 kg and the observed mean
earth. Surveys employing the principles of topographic, and construction surveys necessary temperature is 31ᵒC. The tape is of standard length
geodesy are of high precision and generally for the location and construction of highways, at 20ᵒC and a tension of 12 kg. The cross-sectional
extended over large areas. railroads, canals, transmission lines, and pipelines. area of the tape is 0.035 cm2. The coefficient of linear
Plane Surveying - the type of surveying in •Photogrammetric Survey - Made to utilize the expansion is 0.0000116/ᵒC. and the modulus of
which the mean surface of the earth is principles of aerial photogrammetry, in which elasticity of steel is 2.0x106 kg/cm2. The tape weighs
considered as a plane, or in which its spheroidal measurements made on photographs are used to 1.5 kg.
shape is neglected. determine the positions of photographed objects. a. Determine the total correction for
•Astronomical survey - generally involve imaging temperature.
Units of Measurement or "mapping" of regions of the sky using telescopes. b. Find the total correction due to pull/tension.
•Sexagecimal units of angular measurement are c. Determine the total correction due to sag.
the degree, minute, and second. A plane angle Problem 1: d. What is the correct length of the line?
extending completely around a point equals 360 Line AB 100 m long was paced by a surveyor four
degrees; 1 degree = 60 minutes, 1 minute = 60 times with the following data: 144, 145, 143, and
seconds. 146. Another line CD was paced for four times
•Centesimal units, the grad, or grade, is the angular again with the following results: 893, 892, 894, and
unit. 400 grads = 360 degrees. 1 grad = 100 895. Length(or Distance)
centesimal minutes; 1 centesimal minute = 100 a. Find the pace factor of the surveyor. 𝐏𝐚𝐜𝐞 𝐅𝐚𝐜𝐭𝐨𝐫 =
Average No. of Paces
centesimal seconds. b. Determine the actual length of line CD.
c. If line CD was at elevation of 478 m above the
METHODS OF SURVEYING: sea level and the radius of the earth is 6400 km, Error in Tape:
•Control Survey - Made to establish the horizontal determine the reduced distance of line CD along
and vertical positions of arbitrary points. the sea level. Too Long Too Short
•Boundary Survey - Made to determine the length Measure Add Subtract
and direction of land lines and to establish the Problem 2: Layout Subtract Add
position of these lines on the ground. A rectangular lot having a dimension of 217.3 m by
•Topographic Survey - Made to gather data to 148.5 m was measured by a 30 m tape which is Linitial
Lcorrect = Linitial ± e( )
produce a topographic map showing the 0.04m too long. Ltape
configuration of the terrain and the location of a. What is the correct width of the lot?
natural and man-made objects. b. Find the error in the area.

Manila FB: @ReviewInnovationsOfficial Cebu FB: Excel-RI CE Review Specialist Inc. Davao FB: Review Innovations Davao Branch
 (02) 8735-9161 0919-227-9194  (032) 268-5989 0919-822 -5048  (082) 221-1121 0930-256-0998
Civil Engineering November 2020 Review Innovations Surveying 1
Tape Correction Problems for Practice: 4. A 50 m steel tape was standardized and
1. The taped distance of a line was 99.812 m using a supported throughout its whole length and found
1. Correction due to Temperature 100m steel tape weighing 2 kg at a pull of 10 kg and to be 0.00205 m longer at an observed temperature
temp of 320C. The difference in elevation between of 31.80C and a pull of 10 kg. This tape was used to
C T = L (T − To ) the end points is 45cm. The tape is exactly 100m at measure a line which was found to be 662.702 m at
a temp of 280C and standard pull of 10 kg. If the an average temperature of 24.60C using the same
coefficient of expansion of the tape is 0.0000118/0C pull. Use coefficient of expansion of 11.6 x 10 -6/0C.
α – coefficient of linear (or thermal) expansion
and the tape was supported at the ends and at 25m a. Compute the standard temperature.
– use 11.6 x 10-6/°C if not given
interval during measurement find the correct b. Compute the total temperature correction.
L – measured length/length of tape
horizontal distance of the line. c. Compute the correct length of the line.
T – temperature during measurement
Answer: 99.805m Answers: a) 28.270C; b) -0.028 m; c) 662.67 m
To – standard temperature
2. A 100 m tape is suspended at the ends under a
2. Correction due to Pull
pull of 15 kg. It has also supports at 30 m and 75 m
marks. What is the total correction due to sag if the
(P − Po )L tape weighs 2.4 kg?
CP = Answer: 0.014 m
aE
P – applied pull/tension 3. In five trials of walking along a 90 m course on
Po – standard pull/tension fairly level ground, a pacer for a survey party
L – measured length/length of tape counted 51, 52.5, 51.5, 52.5 and 51.5 strides
a – cross-sectional area of tape respectively. He then started walking an unknown
E – elastic modulus of steel distance XY in four trials which were recorded as
follows: 88.5, 89, 88 and 87 strides. Determine the
3. Correction due to Sag following:
a. Pace factor of the pacer.
b. Length of line XY.
w 2L3 c. Percentage of error in the measurement if the
CS =
24P 2 taped length of XY is 150.5 meters.
Answers: a) 0.869 m/pace; b) 153.16 m; c) 1.77%
w – linear weight of tape
L – distance between supports
P – applied pull/tension

Manila FB: @ReviewInnovationsOfficial Cebu FB: Excel-RI CE Review Specialist Inc. Davao FB: Review Innovations Davao Branch
 (02) 8735-9161 0919-227-9194  (032) 268-5989 0919-822 -5048  (082) 221-1121 0930-256-0998

Вам также может понравиться