0 оценок0% нашли этот документ полезным (0 голосов)
574 просмотров4 страницы
GUARANTEED TECHNICAL PARTICULARS FOR THREE PHASE THREE WIRE HT ELECTRONIC TRIVECTOR METERS Sl. No. Item Requirement 1. Make 2. Type 3. Country of origin 4. Application 3 phase 3 wire, CTPT Operated Meter 5. Rated Voltage 110 Volts 6. Rated Current 5 Amp. (Basic Current) 7. Frequency 50 Hz +5 % 8. Overload capacity 200% of Ib 9. Minimum
GUARANTEED TECHNICAL PARTICULARS FOR THREE PHASE THREE WIRE HT ELECTRONIC TRIVECTOR METERS Sl. No. Item Requirement 1. Make 2. Type 3. Country of origin 4. Application 3 phase 3 wire, CTPT Operated Meter 5. Rated Voltage 110 Volts 6. Rated Current 5 Amp. (Basic Current) 7. Frequency 50 Hz +5 % 8. Overload capacity 200% of Ib 9. Minimum
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
GUARANTEED TECHNICAL PARTICULARS FOR THREE PHASE THREE WIRE HT ELECTRONIC TRIVECTOR METERS Sl. No. Item Requirement 1. Make 2. Type 3. Country of origin 4. Application 3 phase 3 wire, CTPT Operated Meter 5. Rated Voltage 110 Volts 6. Rated Current 5 Amp. (Basic Current) 7. Frequency 50 Hz +5 % 8. Overload capacity 200% of Ib 9. Minimum
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
THREE PHASE THREE WIRE HT ELECTRONIC TRIVECTOR METERS
Sl. No. Item Requirement 1. Make - 2. Type - 3. Country of origin - 4. Application 3 phase 3 wire, CTPT Operated Meter 5. Rated Voltage 110 Volts 6. Rated Current 5 Amp. (Basic Current) 7. Frequency 50 Hz ± 5 % 8. Overload capacity 200% of Ib 9. Minimum starting current 0.1% of Ib in % of base current 10. Loss in potential circuit Specify 11. Loss in current circuit Specify 12. Change in error due to : a. Variation in frequency 50 Hz ± 5 % b. Variation in As per IS 14697:1999 temperature c. Variation in voltage As per IS 14697:1999 13. Accuracy Class 0.5 S 14. Total Weight of meter To be specified by the supplier 15. Details of case Totally insulated Bakelite /Engineering plastic cover body or any other improved version of material. The advantage for using it may be specified in tender. Earthing provision in case of wholly or partial metallic body.The meters should be ultrasonically welded. 16. H.V. withstand As per As per CBIP Technical Report No-88 voltage in KV (RMS) ( Mention the KV for conducting & Insulating portions, separately) 17. Insulation Resistance As per IS 14697:1999 18. Type of Energy To be specified Registration Mechanism. 20 Insulation Test As per IS 14697:1999 ( Voltage 50Hz for 1Min) 21 Temperature co-efficient As per IS 14697:1999 from 10% of rated load to 100 % rated load ( 5°C to 45°C ) 22 Working range Voltage -30% to +20% of rated voltage Current 0.1% to 120% of Ib. 23 Type of load (linear, non All type of load. linear, balanced /unbalanced at any P.F.) 24 Display details i. Display Cycle Display on meter- LED TEST (descriptive In order of REAL TIME DATE display) ACTIVE ENERGY REACTIVE ENERGY APPARENT ENERGY RISING DEMAND WITH ET(KVA) MAX. DEMAND (KVA) MD RESET COUNT INST POWER FACTOR INST FREQUENCY INST VOLTAGE( R ,Y, B PHASE) INST CURRENT ( R, B PHASE) INST LOAD (KVA) TOD MAX. DEMAND CUMULATIVE MAX. DEMAND TOD ENERGY TOD MD OF PREVIOUS BILLING PERIOD PRESENT STATUS OF TAMPER LAST OCCURANCE OF TAMPER WITH DATE & TIME LAST RESTORATION OF TAMPER WITH DATE & TIME TOTAL NO OF ABONORMAL EVENTS POWER ON-HOURS
ii. Process of display Both
(Automatic in cyclic manner / through push button. iii. Digits Specify iv. Segments for display of 7 (Seven) one digit v. Period of display of Should be sufficient to read & note ( around 10 each parameter sec.) 25 Memory Non volatile memory without battery back-up at least 12 years. 26 Non volatile memory Should be sufficient to store data of consecutive 12 billing periods(Energy , Max. Demand) with Abnormal event details & TOD Zones, load survey and other information as detailed in technical specification. 27 Meter can be powered up Yes/No by external power source in absence of Supply voltage
28 Abnormal event data Should be able to store at least 250 ( occurrences
preservation capacity and restoration are separate events) 29 Multiplying factor (If meter Specify is used for Different voltage / current ratio) 30 Load Survey capability a. Parameter Logged KW, KVA, KVAr, Average Voltage(Vr,Vb),Average Current(Ir,Ib), Power Factor. b. Logging interval 30 / 15 Minutes-Programmable. Presently logging interval should be set at 15 Minutes. c. No. of days of Load 40 days Survey 31 Earthing Terminal As per CBIP Technical Report.No.-88 32 Time of the day Zone 4 time zones per day will be available for demand: 07:00 – 10:00 10:00 – 18:00 18:00 – 22:00 22:00 – 07:00 2 time zones per day will be available for all energies: 06:00 – 22:00 22:00 – 06:00 33 Capability for fraud 1. Missing Potential and Potential imbalance, Prevention & detection 2.Voltage- High/Low, 3. Current Imbalance, 4. CT Reversal, 5. CT short, 6. CT open, 7. Power On/Off, 8. Over load / low load hrs. 9. External Magnetic Influence. 34 Sealing and Locking Adequate sealing & Locking arrangements will be Arrangement provided, to avoid tampering (Specify) 35 Type of communication i) Local ii) Remote Low power Local Radio 36 Real Time Clock Time Drift and adjustment facility with MRI to be specified. 37 Mandatory Spare parts Specify a. Interfacing cords As per CBIP Technical Report –111, Along with 10 nos. communication cords b. CMRI (DCD Software) As per CBIP Technical Report –111, Along with Base Computer System software and software to be installed in MRIs (RADIX, ANALOGIC) such that all our MRIs should be able to read from both L & T and SEMs meters. The installation of S/w. in MRIs and BCS would be under the scope of the supplier of meters.