SR #

1
2
3
4
5
6
7
8
9
10
11
12
13
14

15

16

17

18
19
20
21
22
23
24
25
26
27
ACTIVITY
UPS CONTROL & POWER CABLE LAYING
BATTERY BANK INSTALLATION & CABLE LAYING
RO AREA INSTRUMENT INSTALLATION
RO AREA INSTRUMENT CABLE LAYING AND TERMINATION
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-1
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-2
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-1
POWER AND CONTROL CABLE LAYING AND TERMINATION CONPRESSOR'S
CHEMICAL DOSING MAIN CONTROL PANEL INSTALLATION CABLE LAYING
CO2 DOSING CABLE LAYING AND TERMINATION
LV BUSDUCT INSTALATION
CABLE TRAY INSTALATION IN TECHNICAL ROOM WILL START
13.8kv/6.6 TRANSFORMER OIL FILTRATION WILL START 16-18
6.6kv/0.4 TRANSFORMER OIL FILTRATION WILL START 16-18

LV SWITCHGEAR ,UPS,LV VFD INSTALLATION COMPLETED BY ASRF AND TO BE CROSSCHECK

MV SWITCHGEAR INSTALLATION AND BUSBAR CONNECTION

MV VFD INSTALLATION
Cable Laying in the LV Room and Panel openeing for the Glanding and termination in the
Power and control cabinet is going on
MV Switchgear internal Cable looping Termination is going on
START DATE END DATE REMARKS
16-May-2020 19-May-2020 20%
16-May-2020 19-May-2020 5%
18-May-2020 19-May-2020 50% ( stands installed)
18-May-2020 22-May-2020 10%
19-May-2020 22-May-2020 10%
19-May-2020 22-May-2020 Cable tray intallation completed
20-May-2020 22-May-2020 Cable tray intallation ongoing
22-May-2020 24-May-2020
16-May-2020 22-May-2020 20%
22-May-2020 24-May-2020
18-May-2020 22-May-2020
16-May-2020 18-May-2020 45%
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
14-May-2020 16-May-2020 Done Siemens Crossed check and have give
green signal for the Clouser
16-May-2020 17-May-2020 Busbar Installation done , Control cable
termination Going on
Expected the Tools will be arriving on the
16-May-2020 18-May-2020 Evening of 17th May and the Installation will
start on the same day
19-May-20
18-May-20
SR #
1

2
3
4

6
7
8
9
10
11
12
13
14
15

16

17

18

19
20
21
Daily Report

ACTIVITY
UPS CONTROL & POWER CABLE LAYING

BATTERY BANK INSTALLATION & CABLE LAYING

RO AREA INSTRUMENT INSTALLATION


RO AREA INSTRUMENT CABLE LAYING AND TERMINATION
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-1

POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-2
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-1
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-2
POWER AND CONTROL CABLE LAYING AND TERMINATION CONPRESSOR'S
CHEMICAL DOSING MAIN CONTROL PANEL INSTALLATION CABLE LAYING
CO2 DOSING CABLE LAYING AND TERMINATION
LV BUSDUCT INSTALATION
CABLE TRAY INSTALATION IN TECHNICAL ROOM WILL START
13.8kv/6.6 TRANSFORMER OIL FILTRATION WILL START 16-18
6.6kv/0.4 TRANSFORMER OIL FILTRATION WILL START 16-18
LV SWITCHGEAR ,UPS,LV VFD INSTALLATION COMPLETED BY ASRF AND TO BE CROSSCHECK

MV SWITCHGEAR INSTALLATION AND BUSBAR CONNECTION

MV VFD INSTALLATION

Cable Laying in the LV Room and Panel openeing for the Glanding and termination in the
Power and control cabinet is going on
MV Switchgear internal Cable looping Termination is going on
Date 17-05-2020

START DATE END DATE REMARKS


16-May-2020 19-May-2020 40% completed
10% ( Room Cleanig is going one but the
16-May-2020 19-May-2020 cable from the UPS to battery has done in
the cable cellar)
18-May-2020 19-May-2020 50% ( stands installed)
18-May-2020 22-May-2020 10% completed
19-May-2020 22-May-2020 25% Status Cable laying has started & tray
intallation completed
19-May-2020 22-May-2020 25% status Cable laying has started & tray
intallation completed
20-May-2020 22-May-2020 25% status Cable tray intallation Complete
20-May-2020 22-May-2020 25% status Cable tray intallation COmplete
22-May-2020 24-May-2020 Not yet started
16-May-2020 22-May-2020 20% Completed
22-May-2020 24-May-2020 Not yet started
18-May-2020 22-May-2020 Not yet started
16-May-2020 18-May-2020 75% completed.
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
14-May-2020 16-May-2020 80% LV Switchgear Torquing has completed
and Sec B control Wiring has completed.
100 % Completed ( Control Cable and
16-May-2020 17-May-2020 Torquing of MV Busbar with Siemens
Completed)
90 % completed all the panels are inside ,
16-May-2020 18-May-2020 Remainig is 10% for the fixing and
alighnment
19-May-20
25 % Completed.
18-May-20 100% Completed.
Daily Report

SR # ACTIVITY
1 UPS CONTROL & POWER CABLE LAYING

BATTERY BANK INSTALLATION & CABLE LAYING


2
3 RO AREA INSTRUMENT INSTALLATION
4 RO AREA INSTRUMENT CABLE LAYING AND TERMINATION
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-1
5
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-2
6
7 POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-1
8 POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-2
9 POWER AND CONTROL CABLE LAYING AND TERMINATION CONPRESSOR'S
10 CHEMICAL DOSING MAIN CONTROL PANEL INSTALLATION CABLE LAYING
11 CO2 DOSING CABLE LAYING AND TERMINATION
12 LV BUSDUCT INSTALATION
13 CABLE TRAY INSTALATION IN TECHNICAL ROOM WILL START
14 13.8kv/6.6 TRANSFORMER OIL FILTRATION WILL START 16-18
15 6.6kv/0.4 TRANSFORMER OIL FILTRATION WILL START 16-18

LV SWITCHGEAR ,UPS,LV VFD INSTALLATION COMPLETED BY ASRF AND TO BE CROSSCHECK


16

MV SWITCHGEAR INSTALLATION AND BUSBAR CONNECTION


17
18 MV VFD INSTALLATION
Cable Laying in the LV Room and Panel openeing for the Glanding and termination in the Power
19 and control cabinet is going on
20 MV Switchgear internal Cable looping Termination is going on
D xx xx
Date 5/18/2020

START DATE END DATE REMARKS


16-May-2020 19-May-2020 60% completed
30% ( Room Cleanig is going one but the
16-May-2020 19-May-2020 cable from the UPS to battery has done in
the cable cellar)
18-May-2020 19-May-2020 60% ( stands installed)
18-May-2020 22-May-2020 20% completed
19-May-2020 22-May-2020 30% Status Cable laying has started & tray
intallation completed
19-May-2020 22-May-2020 30% status Cable laying has started & tray
intallation completed
20-May-2020 22-May-2020 30% status Cable tray intallation Complete
20-May-2020 22-May-2020 30% status Cable tray intallation COmplete
22-May-2020 24-May-2020 Not yet started
16-May-2020 22-May-2020 30% Completed
22-May-2020 24-May-2020 Not yet started
18-May-2020 22-May-2020 Not yet started
16-May-2020 18-May-2020 90% completed.
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
16-May-2020 18-May-2020 waiting for the Permit for the Personnel

14-May-2020 16-May-2020 90% LV Switchgear Torquing has completed


and Sec A,B,E control Wiring has completed.
100 % Completed ( Control Cable and
16-May-2020 17-May-2020 Torquing of MV Busbar with Siemens
Completed)
16-May-2020 18-May-2020 100 % completed
19-May-2020
50 % Completed.
18-May-2020 100% Completed.