ACTIVITY
UPS CONTROL & POWER CABLE LAYING
BATTERY BANK INSTALLATION & CABLE LAYING
RO AREA INSTRUMENT INSTALLATION
RO AREA INSTRUMENT CABLE LAYING AND TERMINATION
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-1
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-2
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-1
POWER AND CONTROL CABLE LAYING AND TERMINATION CONPRESSOR'S
CHEMICAL DOSING MAIN CONTROL PANEL INSTALLATION CABLE LAYING
CO2 DOSING CABLE LAYING AND TERMINATION
LV BUSDUCT INSTALATION
CABLE TRAY INSTALATION IN TECHNICAL ROOM WILL START
13.8kv/6.6 TRANSFORMER OIL FILTRATION WILL START 16-18
6.6kv/0.4 TRANSFORMER OIL FILTRATION WILL START 16-18
MV VFD INSTALLATION
Cable Laying in the LV Room and Panel openeing for the Glanding and termination in the
Power and control cabinet is going on
MV Switchgear internal Cable looping Termination is going on
START DATE END DATE REMARKS
16-May-2020 19-May-2020 20%
16-May-2020 19-May-2020 5%
18-May-2020 19-May-2020 50% ( stands installed)
18-May-2020 22-May-2020 10%
19-May-2020 22-May-2020 10%
19-May-2020 22-May-2020 Cable tray intallation completed
20-May-2020 22-May-2020 Cable tray intallation ongoing
22-May-2020 24-May-2020
16-May-2020 22-May-2020 20%
22-May-2020 24-May-2020
18-May-2020 22-May-2020
16-May-2020 18-May-2020 45%
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
16-May-2020 18-May-2020 waiting for the Permit for the Personnel
14-May-2020 16-May-2020 Done Siemens Crossed check and have give
green signal for the Clouser
16-May-2020 17-May-2020 Busbar Installation done , Control cable
termination Going on
Expected the Tools will be arriving on the
16-May-2020 18-May-2020 Evening of 17th May and the Installation will
start on the same day
19-May-20
18-May-20
SR #
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Daily Report
ACTIVITY
UPS CONTROL & POWER CABLE LAYING
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 1st PAS RACK-2
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-1
POWER AND CONTROL CABLE LAYING AND TERMINATION RO 2st PAS RACK-2
POWER AND CONTROL CABLE LAYING AND TERMINATION CONPRESSOR'S
CHEMICAL DOSING MAIN CONTROL PANEL INSTALLATION CABLE LAYING
CO2 DOSING CABLE LAYING AND TERMINATION
LV BUSDUCT INSTALATION
CABLE TRAY INSTALATION IN TECHNICAL ROOM WILL START
13.8kv/6.6 TRANSFORMER OIL FILTRATION WILL START 16-18
6.6kv/0.4 TRANSFORMER OIL FILTRATION WILL START 16-18
LV SWITCHGEAR ,UPS,LV VFD INSTALLATION COMPLETED BY ASRF AND TO BE CROSSCHECK
MV VFD INSTALLATION
Cable Laying in the LV Room and Panel openeing for the Glanding and termination in the
Power and control cabinet is going on
MV Switchgear internal Cable looping Termination is going on
Date 17-05-2020
SR # ACTIVITY
1 UPS CONTROL & POWER CABLE LAYING