Вы находитесь на странице: 1из 9

ABU DHABI OIL REFINING

COMPANY SULPHUR RECOVERY UNIT


TAKREER PROJECT NO: 5639
AT ABU DHABI REFINERY

PSV SIZING CALCULATION REPORT - Agreement No.:11-5639-E-1


PSV 203 A/B

SULPHUR RECOVERY UNIT COMPANY DOC. NO. :


REV. No. B
AT ABU DHABI REFINERY 5639-72-PP-031

SULPHUR RECOVERY UNIT PROJECT AT ABU DHABI REFINERY

PSV SIZING CALCULATION REPORT-PSV 203 A/B

COMPANY: ABU DHABI OIL REFINING COMPANY (TAKREER)

EPC CONTRACTOR: CONTROL AND APPLICATIONS EMIRATES (CAE)

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E.
Page 1 of 8
CAE Doc.Ref.No. ::
CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT
TAKREER PROJECT NO: 5639
AT ABU DHABI REFINERY

PSV SIZING CALCULATION REPORT - Agreement No.:11-5639-E-1


PSV 203 A/B

SULPHUR RECOVERY UNIT COMPANY DOC. NO. :


REV. No. B
AT ABU DHABI REFINERY 5639-72-PP-031

This page is a record of all revisions of this document. All previous issues are hereby
superseded and are to be destroyed.

PREPARED CHECKED APPROVED


REV DATE REASON FOR ISSUE
DE LDE PM COMPANY

CLIENT COMMENTS
B 13/12/2012 INCORPORATED AND
ISSUED FOR APPROVAL

A 22/11/2012 ISSUED FOR REVIEW ARM ZM AJ

SIGNED(Initials)

NOTES:

1.       Revisions are denoted as follows:

A.      By a vertical line in the right-hand margin against the revised text.

B.      By a triangle symbol for graphics, the revision number being denoted

within the symbol. Revision symbols are positioned adjacent to the revision.

2.     Prepared by :: Discipline Engineer(DE)


Checked by :: Checked Lead Discipline Engineer (LDE)/Project Manager(PM)

Approved by:: Approved by Project Manager (PM)/Project Director (PD)

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E.
Page 2 of 8
CAE Doc.Ref.No. ::
CAE400/TAK5639/KHEL/PR/DD18
Control and Applications Emirates
P.O BOX 3687, Abu Dhabi, U.A.E.
Page 2 of 8
CAE Doc.Ref.No. ::
CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT
TAKREER PROJECT NO: 5639
AT ABU DHABI REFINERY

PSV SIZING CALCULATION REPORT - Agreement No.:11-5639-E-1


PSV 203 A/B

SULPHUR RECOVERY UNIT COMPANY DOC. NO. :


REV. No. B
AT ABU DHABI REFINERY 5639-72-PP-031

REVISION HISTORY

Sr.No. Rev. No. Rev. Date Page No. Section No. Rev.Description/Details
Calculation summary and
1 B 13/12/12 4 -- references used during calculations
are added.
"Discharge is replaced with
2 B 13/12/12 5,6,7,8 --
Outlet."

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E.
Page 3 of 8
CAE Doc.Ref.No. ::
CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT TAKREER PROJECT NO:
AT ABU DHABI REFINERY 5639

PSV SIZING CALCULATION REPORT - PSV 203 A/B Agreement No.:11-5639-E-1

SULPHUR RECOVERY UNIT AT COMPANY DOC. NO. :


REV. No. B
ABU DHABI REFINERY 5639-72-PP-031

TAG NO - PSV 203 A/B

CALCULATION SUMMARY : B

Scenario Description Relief loads Calculated Orifice Area


kg/hr mm2
Blocked Outlet Case - HP
A 160 39.75
Reformer Gas
Blocked Outlet Case
B 232 30.75
-Natural Gas

REFERENCES : B

A) Guide for Pressure-Relieving and - Depressuring Systems (API-521)

B) Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries Part I—Sizing and Selection (API-520, part I)

C) Flanged Steel Pressure Relief Valves (API-526)

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E. Page 4 of 8
CAE Doc.Ref.No. :: CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT TAKREER PROJECT NO:
AT ABU DHABI REFINERY 5639

PSV SIZING CALCULATION REPORT - PSV 203 A/B Agreement No.:11-5639-E-1

SULPHUR RECOVERY UNIT AT COMPANY DOC. NO. :


REV. No. B
ABU DHABI REFINERY 5639-72-PP-031

TAG NO - PSV 203 A/B

SCENARIO A: BLOCKED OUTLET CASE (HP REFORMER GAS) B

STEP 1: DETERMINATION OF CRITICAL / SUBCRITICAL FLOW

Nomenclature:
INPUT
PSP Set Pressure (kPa) = 1196 kPag = 1297.74 kPa 12.20 kg/cm2g
PO Over Pressure (kPa) = 10% of PSP = 10.00
PRP Relieving Pressure (kPa) = 1,417.38 kPa
PB Back Pressure (kPa) = 111.13 kPa 0.10 kg/cm2g
P Operating Pressure (kPa) = 375.91 kPa 2.80 kg/cm2g
T Operating Temperature (K) = 35.00 °C = 308.00 K 35.00 °C
k Sp.heat Ratio = 1.36 1.36
M Molecular Weight = 5.2 5.2
Z Compresibility factor = 1.005 1.005

Sizing Formulae:

PRP = PSP +PO


PCF/PRP = [2/k+1]k/k-1

Calculation:

PSP = 1,297.7 kPa

PRP = 1,417.4 kPa

PB = 111.1 kPa

T = 35.0 °C

Flow is critical / subcritical

From API - 520 ( Part - I)

PCF = 758.5 kPa

As PCF ≥ PB (Critical / Subcritical Flow Criterion)

Flow is Critical

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E. Page 5 of 8
CAE Doc.Ref.No. :: CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT
TAKREER PROJECT NO: 5639
AT ABU DHABI REFINERY

PSV SIZING CALCULATION REPORT - PSV 203 A/B Agreement No.:11-5639-E-1

SULPHUR RECOVERY UNIT COMPANY DOC. NO. :


REV. No. B
AT ABU DHABI REFINERY 5639-72-PP-031

TAG NO - PSV 203 A/B

SCENARIO A: BLOCKED OUTLET CASE (HP REFORMER GAS) B

STEP 2: DETERMINATION OF ORIFICE AREA & DESIGNATION OF 72-PSV-203 A/B


Nomenclature:

A Required effective discharge area of the device, sq.mm


W Required flow through the device, kg/hr
C Coefficient determined from an expression of the ratio of the 352.5003
specific heats(k=CP/CV) of the gas or vapor at inlet relieving
conditions.

Kd Effective coefficient of discharge. For preliminary sizing, use the 0.975


following values.
= 0.975 when a pressure relief values is installed with or without a
rupture disk in combination.
= 0.62 when a pressure relief values is not installed and
sizing is for a rupture disk in accordance with 3.11.1.2. of
API 520 - 1

PRP Upstream relieving pressure, kPaa. This is the set pressure plus the 1417.38 kPa
allowable overpressure plus atmospheric pressure.

Kb Capacity correction factor due to back pressure. This can be 1


obtained from the manufacturer’s literature or estimated for
preliminary sizing from Fig.30 (API-521 Part I). The back pressure
correction factor applies to balanced bellows valves only. For
conventional and pilot operated valves, use a value for Kb equal to
1.0

Kc Combination correction factor for installations with a rupture disk 1


upstream of the pressure relief valve (see 3.11.2).e pressure relief
valve (see 3.11.2).

= 1.0 when a rupture disk is not installed,


= 0.9 when a rupture disk is installed in combination with a pressure
relief valve and the combination dose not have a published valve

TRP Relieving temperature of the inlet gas or vapor, K ( oC + 273). 164.50 o


C

Z Compressibility factor for the deviation of the actual gas from a perfect 1.005
gas, a ratio evaluated at inlet relieving conditions.

M Molecular weight of the gas or vapor at inlet relieving conditions. 5.2

Sizing Formulae:

A = 13160W/CKdPRPKbKc*sqrt(TZ/M)

Calculation:

Mass Flow Rate (W) is:

W = 160 kg/hr Calculated Orifice Area 39.753 sq.mm


Selected Orifice Area Size 71 sq.mm
Required effective discharge area of the device: Selected Orifice Designation D
Inlet Size / Rating 1" / 300#
A = 39.753 sq.mm = 0.06162 sq.in Outlet Size / Rating 2" / 150#

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E. Page 6 of 8
CAE Doc.Ref.No. :: CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT TAKREER PROJECT
AT ABU DHABI REFINERY NO: 5639

PSV SIZING CALCULATION REPORT - PSV 203 A/B Agreement No.:11-5639-E-1

SULPHUR RECOVERY UNIT AT COMPANY DOC. NO. :


REV. No. B
ABU DHABI REFINERY 5639-72-PP-031

TAG NO - PSV 203 A/B

SCENARIO A: BLOCKED OUTLET CASE (NATURAL GAS) B

STEP 1: DETERMINATION OF CRITICAL / SUBCRITICAL FLOW

Nomenclature:
INPUT
PSP Set Pressure (kPa) = 1196.4 kPag = 1297.74 kPa 12.20 kg/cm2g
PO Over Pressure (kPa) = 10% of PSP = 10.00
PRP Relieving Pressure (kPa) = 1,417.38 kPa
PB Back Pressure (kPa) = 111.13 kPa 0.10 kg/cm2g
P Operating Pressure (kPa) = 375.91 kPa 2.80 kg/cm2g
T Operating Temperature (K) = 45.00 °C = 318.00 K 45.00 °C
k Sp.heat Ratio = 1.304 1.304
M Molecular Weight = 18.46 18.46
Z Compresibility factor = 0.9960 0.9960

Sizing Formulae:

PRP = PSP +PO


PCF/PRP = [2/k+1]k/k-1

Calculation:

PSP = 1,297.7 kPa

PRP = 1,417.4 kPa

PB = 111.1 kPa

T = 45.0 °C

Flow is critical / subcritical

From API - 520 ( Part - I)

PCF = 772.5 kPa

As PCF ≥ PB (Critical / Subcritical Flow Criterion)

Flow is Critical

Control and Applications Emirates


P.O BOX 3687, Abu Dhabi, U.A.E. Page 7 of 8
CAE Doc.Ref.No. :: CAE400/TAK5639/KHEL/PR/DD18
ABU DHABI OIL REFINING
COMPANY SULPHUR RECOVERY UNIT
TAKREER PROJECT NO: 5639
AT ABU DHABI REFINERY

PSV SIZING CALCULATION REPORT - PSV 203 A/B Agreement No.:11-5639-E-1

SULPHUR RECOVERY UNIT COMPANY DOC. NO. :


REV. No. B
AT ABU DHABI REFINERY 5639-72-PP-031

TAG NO - PSV 203 A/B

SCENARIO A: BLOCKED OUTLET CASE (NATURAL GAS) B

STEP 2: DETERMINATION OF ORIFICE AREA & DESIGNATION OF 72-PSV-203 A/B


Nomenclature:

A Required effective discharge area of the device, sq.mm


W Required flow through the device, kg/hr
C Coefficient determined from an expression of the ratio of the 347.3518
specific heats(k=CP/CV) of the gas or vapor at inlet relieving
conditions.

Kd Effective coefficient of discharge. For preliminary sizing, use the 0.975


following values.
= 0.975 when a pressure relief values is installed with or without a
rupture disk in combination.
= 0.62 when a pressure relief values is not installed and
sizing is for a rupture disk in accordance with 3.11.1.2. of
API 520 - 1

PRP Upstream relieving pressure, kPaa. This is the set pressure plus the 1417.38 kPa
allowable overpressure plus atmospheric pressure.

Kb Capacity correction factor due to back pressure. This can be 1


obtained from the manufacturer’s literature or estimated for
preliminary sizing from Fig.30 (API-521 Part I). The back pressure
correction factor applies to balanced bellows valves only. For
conventional and pilot operated valves, use a value for Kb equal to
1.0

Kc Combination correction factor for installations with a rupture disk 1


upstream of the pressure relief valve (see 3.11.2).e pressure relief
valve (see 3.11.2).

= 1.0 when a rupture disk is not installed,


= 0.9 when a rupture disk is installed in combination with a pressure
relief valve and the combination dose not have a published valve

TRP Relieving temperature of the inlet gas or vapor, K ( oC + 273). 160.16 o


C

Z Compressibility factor for the deviation of the actual gas from a perfect 0.996
gas, a ratio evaluated at inlet relieving conditions.

M Molecular weight of the gas or vapor at inlet relieving conditions. 18.46

Sizing Formulae:

A = 13160W/CKdPRPKbKc*sqrt(TZ/M)

Calculation:

Mass Flow Rate (W) is:

W = 232 kg/hr Calculated Orifice Area 30.754 sq.mm


Selected Orifice Area Size 71 sq.mm
Required effective discharge area of the device: Selected Orifice Designation D
Inlet Size / Rating 1" / 300#
A = 30.754 sq.mm = 0.04767 sq.in Outlet Size / Rating 2" / 150#