DOCKING LIST - SPECIAL SURVEY DOCKING

CB. Samudra Perkasa 01

Start Docking : Mid of September 2019


Finish Docking : Mid of October 2019
No Uraian Pekerjaan Volume Harga Satuan Harga Total Remark
I. GENERAL SERVICE
1 Docking/undocking 1 LS

2 Jasa docking per-hari 30 Hari Time Schedule docking agar di lampirkan

3 Jasa Sambungan aliran listrik 30 Hari


4 Fasilitas Alat berat 1 LS
5 Naik & turunkan Crane Kobelco 120 Ton 1 LS
6 Pembuatan docking report 4 Rangkap

II. ULTRASONIC AND MEGGER TEST


1 Ultrasonic Test (Scope Special Survey III) 1 LS 3rd party
2 Pembuatan gambar bukaan kulit (drawing shell expansion) 4 Rangkap
3 Megger test all motors 1 LS

III. REPLATING
1 Replating Bottom Plate 2000 Kg Sesuai hasil UT SS-3
2 Replating Hull side 1500 Kg Sesuai hasil UT SS-3
3 Replating Deck 1000 Kg Sesuai hasil UT SS-3
4 Rewelding 100 Meters

IV. SAND BLAST & PAINTING


1 Scraping tiram 1 LS

2 Sandblast & Painting plat bottom vertical & Horisontal (under water area)
Sandblast
806.74 m2
Pengecatan Primer 1 x layer (150 µ) red
Pengecatan siller 1 x layer (100 µ) grey
Pengecatan AF / anti fouling 1 x layer (150 µ) red brown
3 Sandblast & Painting Hull top side area
Sandblast
242.32 m2
Pengecatan Primer 1 x layer (150 µ) red
Pengecatan top coat 1 x layer (100 µ) black
4 Sandblast & Painting Main Deck area
Sandblast
480.73 m2
Pengecatan Primer 1 x layer (150 µ) red
Pengecatan top coat 1 x layer (150 µ) Green
5 Sandblast & Painting First and Second Deck
Sandblast
115.32 m2
Pengecatan Primer 1 x layer (150 µ) red
Pengecatan top coat 1 x layer (150 µ) Green
6 Sandblast & Painting Top Deck
Sandblast
83.98 m2
Pengecatan Primer 1 x layer (150 µ) red
Pengecatan top coat 1 x layer (150 µ) Green
7 Sandblast & Painting Bollard 6 set @ 4m2, Fairlead 4 unit @ 1m2 & A Frame anchor 4 unit @ 1m2
Sandblast
32 m2
Pengecatan Primer 1 x layer (150 µ) red
Pengecatan top coat 1 x layer (150 µ) Black
8 Sandblast & Painting Dinding Accomodation main deck, first deck & second deck
Water jet 390.82 m2
Pengecatan top coat 1 x layer (100 µ) White
9 Sandblast & Painting Pipa Hand Rail
Sandblast 243.84 Meter
Pengecatan Primer 1 x layer (100 µ) Red / Silver
10 Pengecatan Ship name, port register, draft mark & plimsol 1 LS

V. TANKI - TANKI
1 Cleaning Tanki FW tank 2 Tanki
2 Cleaning Tanki Fuel oil tank 3 Tanki
3 Cleaning Ballast Tank 4 Tanki
3 Free gas tanki 8 Tanki
4 Air Test tanki 5 Tanki
5 Ganti rubber manhole 12 Pcs
6 Cleanng Oil Bilge 1 LS

VI. SEA CHEST


1 Bongkar & pasang Strainer 2 Pcs
2 Cleaning Sea Chest Box 2 Pcs

VI. ZINC ANODE


1 Bongkar & Pasang Zinc anode 46 Pcs

Page 1 of 3
No Uraian Pekerjaan Volume Harga Satuan Harga Total Remark
VII. OUTFITTING WORK
1 Penggantian kusen & pintu koridor second deck
Dimensi 69 cm x 182 cm 2 Pcs
Penggantian kusen & pintu WC second deck
Dimensi 71 cm x 187 cm 1 Pcs
Material by owner supply
Penggantian kusen & pintu laundry room
Dimensi 79 cm x 183 cm 1 Pcs
Penggantian kusen & pintu food store room
Dimensi 69 cm x 198 cm 1 Pcs
2 Pergantian keramik laundry room & food store room - Dimensi 30 cm x 30 cm 35 Pcs Material by owner supply
3 Repair pin bollard - round bar 2" 8 Set
4 Perbaikan instalasi pipa FW & equipment toilet second deck
Pipa 3/4" schedule 80 2 m
Elbow 3/4" schedule 80 1 Pcs
Pipa 1" schedule 80 1 Length
Pipa 1/2" schedule 80 1 Length
Elbow 1/2" schedule 80 16 Pcs
Shower WC 4 Pcs
Button flushing toilet 2 Pcs
Selang toilet 4 Pcs
Cover dudukan toilet 3 Pcs
Tirai kamar mandi - Dimensi 120 cm x 180 cm 4 Pcs
5 Perbaikan instalasi pipa pembuangan & equipment toilet first deck
Pipa 2,5" schedule 80 4 m
elbow 2,5" schedule 80 2 Pcs
Flange 2,5" schedule 80 6 Pcs
Button flushing toilet 3 Pcs
Selang toilet 4 Pcs
Cover dudukan toilet 4 Pcs
Tirai kamar mandi - Dimensi 120 cm x 180 cm 4 Pcs
6 Pemasang pipa fuel filtration system untuk biodiesel
Pipa 1" schedule 40 6 Length
Teebow 1" schedule 40 4 Pcs
Elbow 1" schedule 40 7 Pcs
Ball valve 1" 6 Pcs
Water mur / coupling 1" 4 Pcs
Reducer 2" - 1" 1 Pcs
Naple 1" 6 Pcs
7 Penggantian grating di belakang crane
Plate grating 4 Lbr
Plate Siku L 5 cm x 5 cm 5 Length
8 Peenggantian greting safety wire
Plate grating 16 Lbr
Plate Siku L 5 cm x 5 cm 10 Length
9 Pemasangan wooden deck dan besi siku
Kayu balok 25 cm x 5 cm x 200 cm 216 Pcs Material by owner supply
Besi siku 7 cm x 7 cm 48 Length
10 Perbaikan roller fearlead no. 1 dan no. 2 2 Pcs
11 Perbaikan pulley deck no. 1,2,3,4 4 Pcs
12 Perbaikan roller pulley wire no.2 1 Pcs
13 Perbaikan railing main deck dan first deck -
Pipa 2.5" schedule 80 5 Length
Pipa 1.5" schedule 80 10 Length
14 Penggantian pulley pengatur wire drum no. 1 dan 4 2 Pcs
15 Perbaikan ventilasi semua tanki 8 Pcs
16 Penggantian pipa pemadam (water canon)
Pipa 2" schedule 40 2 m
Elbow 2" schedule 40 2 Pcs
Flange 2" 5K 2 Pcs
Valve 2" 1 Pcs
17 Penggantian pipa pemadam (hydrant - maindeck)
Pipa 2" schedule 40 6 Length
Elbow 2" schedule 40 4 Pcs
Flange 2" 5K 4 Pcs
18 Fabrikasi ruang CO2 System
Plate 93 cm x 32 cm x 205 cm 1 Pcs
19 Cleaning all AC split 20 Unit

Page 2 of 3
No Uraian Pekerjaan Volume Harga Satuan Harga Total Remark
Dokumentasi

Pintu koridor second deck Keramik food store room Keramik laundry room Jendela radio room retak

Rel tirai tempat tidur crew room Kondisi plafon crew room Tiang bendera kapal SP01

Rel tirai tempat tidur crew room Pipa FW, pembuangan, equipment pelengkap WC / KM

Kondisi plat siku & plat grating safety wire Kondisi Plat siku dan wooden deck

Bushing pulley wire & roller fairlead Cover pipa ventilasi tangki

Pipa & valve sistem pemadam Pondasi liferaft & bracket ringboouy CO2 room

cabel tray lampu sorot haluan Marine switch saklar & cover mcb junction box panel Cover push button alarm di radio room

Page 3 of 3