Annexure A

Scope of Supply:

1. Anchor (2 No’s)
2. Anchor Chain (2 sets.) – 233.5m length each

Specifications for Anchor & chains

 Two (2) Stockless bower Anchor with high holding force together with shackle and stud link chain cable
to be supplied in accordance with the class rules.
 Chain cables to be made from latest NCD 3914 & NCD 3909 standards.
 Diameter 40mm, U3 stud-link-chain cables with a minimum length of 233.75m, on each side as per
classification Society.

Inspection:

The Anchor & Chain Cable to be inspected tested and certified by the Classification Society.

Compliance Sheet for Anchor & Chain:-

Sl. Requirement Confirmation /


No. Description Declaration by
Supplier
1. Type - High Holding Power bower Anchor  
2. Quantity - 2 nos.  
3. Weight - 1845 kg  

4. Anchor Should meet all class requirements, class test


certificates to be provided
Paint - Anchor shall be painted marked in
accordance with international practice.
 
5. Drawings/Documents for marking scheme to
be provided by OEM.
Anchor Chain To be of flush butt welded stud link chain
7.  
cables.
8. Grade U3, 38mm diameter chain  
Should meet all class requirements, class test
certificates to be provided and to be sourced
from indigenous manufacturers  
9. Chain cables to be made from latest NCD 3914
& NCD 3909 standards.
10. 467.5 m total length (233.75 m per side),  
diameter 38 mm.
Swivel adapter to be provided on anchor end.

1
Kenter shackles as required for the chains to
be included
The ends of chain cables shall be fixed to chain
11. locker structure. Suitable arrangement with  
End link / enlarged link to be provided.
12. Any other accessories for chain (Which are not
 
included above)

Chain cable shall be painted marked in


accordance with international practice.
 
Drawings/Documents for marking scheme to
13. be provided by OEM.

OEM shall supply Anchor & Chain Cable with


all accessories as necessary for a proper and
15. reliable operation of the equipment, onboard
 
spares, special tools, documents, installation
and setting to work and acceptance trials as
required.

All consumables and tools required to


16. commission the system is under the scope of  
supply of system manufacturer.
The overall responsibility for complete design
17. and including FATS requirement as per this  
General
SOTR will be of the firm’s responsibility
The OEM shall make necessary design
18. calculations and shall be responsible for design  
and engineering of the total scope of supply.
19. A reference list shall be provided by the OEM
 
to validate its supplier record.
All relevant certificates for proof load testing
20. of Anchor & Chain Cable, accessories shall be  
provided by OEM along with the equipment.
Any item not listed above but required for
21. satisfactory operation of the equipment has to  
be in scope of supply of OEM.

All the necessary standard spares to be indicated & included in scope of supply.

GENERAL

2
 The dry weight of:
1. The entire anchors & chain cables
 All drawings, diagrams, installation, commissioning & maintenance manuals
are to be provided with the equipment in both hard & soft copy.
1. Weight  Estimated weight in Kg of the equipment and components should be
indicated in the drawing. The weighed weight of major items of the
equipment at the time of dispatch should be indicated in the dispatch
documents. It is to be ensured that the weight of the equipment is kept within
+/- 2% of the estimated weight.
Outline
2. To be specified by OEM
dimension
Noise & Every reasonable and practical effort shall be made to minimise equipment noise
3.
Vibration through sub-assembly and component design.
 Anchor Chain drawing.
 Dimension drawings for all equipment with installation guidelines, alignment
procedure and ideal location.
 Factory standard test report.
 Instrumentation list.
Documentatio  Maintenance schedule giving details of tasks to be performed during
4.
n & Drawings equipment servicing in MS Excel format along with spares & tools
requirement.
 Trouble shooting of equipment.
 Binding Data.
 List of all loose supplied items/accessories along with supplier's part nos. of
the same to be provided.
 Instruction books, drawings, spare parts code books and tools lists should be
supplied in Three (3) copies for the yard in English language.
 Instruction books (maintenance, operating and service manuals, parts
Instruction
5. manual) in English language shall be delivered in plasticized dossiers.
books
 Two sets of CDs of the above manuals to be supplied along with the
equipment in PDF file.
 Original printed manuals to be supplied, photocopies will not be accepted.
 One set of standard tools adequate for undertaking the maintenance on
board should be supplied along with the offer.
6. Tools
 One set of tools for Anchor Capstan. Mooring capstan & Chain stopper side
electronics also to be supplied.
 OEM’s test certificate as per class requirement to be provided.
7. Certification
 Manufacturer’s guarantee certificate to be provided.
 Any item not listed above but required for satisfactory operation of the
equipment has to be a part of scope of supply of OEM.
8.
Note  Firm to provide clause wise acceptance with deviation/comments if any to be
forwarded separately.