Name of work:Providing Water supply facilities to the Satrampadu ( Ac.6.99, 31 plots ) urben
Housing lay-out covered under Navaratnalu Pedalandariki Illu.
Estimate Amount: Rs 6.99
TENTATIVE ABSTRACT ESTIMATE
S.
No Description of Work No L B D Quantity Rate Per Amount
1 2 3 4 5 6 7 8 9 10
Page 1 of 4
S.
No Description of Work No L B D Quantity Rate Per Amount
1 2 3 4 5 6 7 8 9 10
Supply and delivery of OD HDPE pipes confirming to IS 4984-
1995 P.E.100 grade, P.N.6 Kgs/Cm2 Pressure ISI make
7
including cost and conveyance of meterial including all
charges etc., complete
160mm dia HDPE pipe 1 1 12.00 12.00
160mm dia HDPE pipe 1 1 0.00 0.00
160mm dia HDPE pipe 1 1 0.00 0.00
160mm dia HDPE pipe 1 1 4.00 4.00
16.00 16.00 639.65 1 Rmt 10234
For 90 mm dia 1 9 44.00 396.00 149.90 1 Rmt 59360
For75 mm dia 1 13 36.00 468.00 104.53 1 Rmt 48920
880.00
Page 2 of 4
S.
No Description of Work No L B D Quantity Rate Per Amount
1 2 3 4 5 6 7 8 9 10
Supply, Delivery of D.I double flanged short/Long body or
Wafer Type patternButterfly Valves for the following dia.
conforming to IS 13095 (with up to date amendments, if any)
11 manually operated having Body, Disc with D.I; Shaft, Seating
ring, internal fastenings with Stainless steel (IS: 6603);
External bolting with Carbon steel; Seat with Nitrile or EPDM
rubber; excluding transportation and all taxes, complete.
100mm DI Air Valve 1 1 1.00 18496.52 Each 18497
Page 3 of 4
S.
No Description of Work No L B D Quantity Rate Per Amount
1 2 3 4 5 6 7 8 9 10
Provision for Power connection for exisitng running
19 1 no's 55000 1 no's 55000
power bores