Вы находитесь на странице: 1из 1

General Notes:

NOTES IN RESPECT OF SA STANDARD CODE OF PRACTICE FOR THE APPLICATION OF


THE NATIONAL BUILDING REGULATIONS, SANS 10400

PART D PUBLIC SAFETY


· all balustrade to comply with dd2

PART M STAIRWAYS
· dimensions of stairways to be in compliance with mm2
· all balustrade to comply with mm3

Top Copying wall TOC + 3.040 Top Copying wall TOC + 3.040 Top Copying wall TOC + 3.040 PART N GLAZING
Amphi · all glazing to comply with SABS CODE N
Theatre
Top Fourth Seat TOC + 2.040 Top Fourth Seat TOC + 2.040 Top Fourth Seat TOC + 2.040 PART O LIGHTING & VENTILATION
· all areas to be artificially lit in compliance with oo6, offices & other habitable rooms min
plaster&paint to owner's
choice Stage plaster&paint to owner's
plaster&paint to owner's
plaster&paint to owner's
choice
35o lux,
choice
choice toilets min 160 lux
Walking Area
Paving:
· all designed by electrical consultant and in accordance with ohs act
Top stage TOC + 0.340
· natural ventilation of 5% of floor area
ngl ngl · natural smoke ventilation of 1.5% of floor area
Natural Ground TOC - 0.000 ngl Natural Ground TOC - 0.000 Natural Ground TOC - 0.000 ngl Natural Ground TOC - 0.000 · if required toilets to be mechanically ventilated by extraction to external at rate of
20l/s/fitment
SOUTH ELEVATION WEST ELEVATION · all air conditioning will be designed by a professional engineer
· and will be in accordance with NBS regulations
Scale 1:100 Scale 1:100
PART P DRAINAGE
· all joints to comply with pp2 & pp6
· all sanitary fixtures to be in accordance with pp3 - pp5
· all drainage to comply with the relevant portions of pp15, depending on type of system
utilized
· all discharge & ventilating pipes to be installed in compliance with pp20
· drains to be accessible in accordance with pp21
· all sanitary fixtures to have traps in accordance with pp22
· gully to comply with requirements of pp23
· all drains to be laid in accordance with with pp24
· all wet services are to be designed by a professional and registered engineer

PART R STORM WATER DISPOSAL


Top Copying wall TOC + 3.040 Top Copying wall TOC + 3.040 Top Copying wall TOC + 3.040 · sizes of roof valleys & gutters to comply with rr3
Amphi plaster&paint to owner's · drains to be accessible in accordance with rr4
plaster&paint to owner's
Theatre choice
choice plaster&paint to owner's plaster&paint to owner's · the storm-water disposal system shall be designed by a professional engineer
choice choice
Top Fourth Seat TOC + 2.040 Top Fourth Seat TOC + 2.040 Top Fourth Seat TOC + 2.040
PART S FACILITIES FOR DISABLED PERSONS
Stage plaster&paint to owner's
Top Third Seat TOC - 1.530 Top Third Seat TOC - 1.530 · ramps to be provided in accordance with ss2
choice
Top Second Seat TOC - 1.020 Top Second Seat TOC - 1.020
· toilet facilities to be provided in accordance with ss5
· parking bays to be provided in compliance with ss8
Walking Area
Paving: Top First Seat TOC - 0.510 Top First Seat TOC - 0.510 · signage to comply with ss9
Top stage TOC + 0.340
Natural Ground TOC - 0.000 ngl ngl Natural Ground TOC - 0.000 Natural Ground TOC - 0.000 Natural Ground TOC - 0.000 PART T FIRE PROTECTION
· occupancy to comply with tt3

NORTH ELEVATION EAST ELEVATION ·


·
all materials to comply with tt5
all structural elements & components to comply with tt7
Scale 1:100 · fire resistance of division separating elements to comply with tt6
Scale 1:100 · internal partitions and walls to comply with tt9
· all openings to be protected in compliance with tt10
· roof assemblies & coverings to comply with tt12
· provision escape routes to comply with tt1
· all feeder & emergency routes to comply with tt18 & tt19
· dimensions of components of escape routes to comply with tt20
· width of escape routes to comply with tt21
· reception area to comply with tt2
· all fire services are to be designed by a professional and registered fire consultant
· all ceilings to comply with tt13
· all floor coverings to comply with tt14
· all wall finishes to comply with tt15
· feeder routes to be provided in accordance with tt18
· when partition layouts are designed - to be submitted under separate application
· locks to escape & access doors to be fitted with knob/cylinder locks in compliance with
tt19.9
· ventilation to stairs to comply with tt24
· all openings in floors to comply with tt26
· signage to be provided in accordance with tt29, tt32, tt55,4 & tt55,5
· emergency routes to be lit in accordance with tt30, designed by professional engineer &
certificate issued on completion
· water reticulation for fire fighting purposes to be comply with tt33
· fire hose reels to be provided in accordance with tt34
· hydrants to be provided in accordance with tt35
Amphi · portable fire extinguishers to be provided in accordance with tt37 to the satisfaction of the
chief
Theatre fire officer
· any inaccessible concealed space with a max dimension of more than 5m to be fire
stopped in
Stage ·
accordance with tt39
service pipes, conduits & sleeves to comply with tt41
· provision to be made for smoke ventilation and detection system designed in accordance
C-C with
tt42, designed by professional engineer & certificate issued on completion
· air conditioning system to be designed by professional engineer to comply with tt43 &
certificate
issued on completion
D-D ·
·
stairway to comply with tt23.6
parking to comply with tt51
C-C ·
·
no smoking signs to comply with tt44
sprinkler system to be designed by professional
· engineer & certificate issued on completion

PART U REFUSE DISPOSAL


ROOF PLAN · refuse area to be constructed & provided with hose, bib-tap & sump

WATER SUPPLY NOTES

GROUND LAYOUT Scale 1:100 ·


·
existing municipal water connections to be used.
water pressure to be tested at existing fhr to determine if watertanks are required for fire
hose
Scale 1:100 reels.
· all water supply pipes above ground with a diameter of 38mm or less are to be copper
Area : 60 m² class
460/0. all pipes in chases to be spiral wrapped with kraftex building paper.
· no pipes are to be installed below surface beds.
· pipes in ground to be in upvc or hope installed to manufactures and sabs specification. all
galvanised pipes used in ground shall be denso-protected in strict accordance with manufactures
specification.
· fire hose reels and extinguishers to be SABS approved
· variation to pipe layout, design, sizes, etc., must be approved by the architect prior to
installation.
· hot and cold water system to be designed by a professional engineer

GENERAL SEWER NOTES


· cleaning facilities shall be provided at all changes in gradient and direction and
L4 L4 elsewhere
where required.
P1 DB-CH DB-CH · all levels and directions to be checked on site and any discrepancies to be reported to
architect immediately, before commencing with any work.
DB-CH · all work to be executed in strict accordance to the drawings and local authority
requirements
· all sabs applicable specifications and codes of practice to be used.
· all upvc pipes shall be installed according to manufactures instructions and specifications,
sabs
codes and other relevant requirements including those of local authority.
· all pipe fittings shall be inspected and approved before pipe laying commences.
· no section of drain shall be backfilled without the written approval of the engineer.
· a ball 5mm smaller than the internal of the drain shall pass freely along the length of the
C
drain
and shall be carried out in the presence of the engineer.
· all existing services in area where construction is to take place shall be located and
opened
before proposed drainage work is commenced.
· access shall be provided to drains at every change of gradient and direction and at least
25m
Top Copying Wall TOC - 3.040 intervals by means of a cleaning eye or manhole.
· the maximum bend on any single fitting shall be 45 deg. with the exception of the
Amphi Amphi ventilation
pipe where up to 90 deg. may be used.
Theatre
Theatre Stage C ·
·
all traps up to and including 50mm shall be of deep seal (75mm) reseal type.
all groups of wash hand basins and sinks shall be connected to a 50-100mm internal
waste
Top Fourth Seat TOC - 2.040 C pipe.
· all pipes shall be laid to falls as indicated on drawings.

C-C
Stage plaster&paint to owner's
choice
Top Third Seat TOC - 1.530

Top Second Seat TOC - 1.020


PAVING: C

Top First Seat TOC - 0.510 C-C


Top stage TOC + 0.340 DISTRIBUTION BOARD (DB-CH)
Natural Ground TOC - 0.000 ngl ngl Natural Ground TOC - 0.000 A 1X28W RECESSED WALL LIGHT
DESCRIPTION:
Floor finishon 30mm screed on concrete slab or B 1X28W CFL CIRCULAR BULKHEAD WALL MOUNTED
85 ground slabapproved damp proof course
DISTRIBUTION BOARD (DB-CH)
C 2X18W 1.2m DECORATIVE FLOURESCENT
on 20mm sand blinding 200mm well on compacted C 16A SINGLE SOCKET OUTLET BUILT 300mm AFL
Foundation hardcore on shelldrite termiteprufe soil poisoner treated soil Foundation Foundation D 36W ROUND DOWNLIGHTER
250x700 strip foundation to Foundation 250x700 strip foundation to 250x700 strip foundation to ELECTRICAL LAYOUT 16A DOUBLE SOCKET OUTLET BUILT 300mm AFL
engineer's details 250x1000 strip foundation to engineer's details engineer's details 16A DOUBLE SOCKET OUTLET BUILT 1200mm AFL D1 50W RECTANGULAR DOWNLIGHTER
engineer's details Scale 1:100
TELEPHONE POINT BUILT 300mm AFL 3X36W 0.6m LBR RECESSED FLOURESCENT
L2
Floor finishon 30mm screed on concrete slab or
DATA POINT BUILT 300mm AFL
85 ground slabapproved damp proof course
on 20mm sand blinding 200mm well on compacted
SECTION C-C L3 3X36W 1.2m LBR RECESSED FLOURESCENT
hardcore on shelldrite termiteprufe soil poisoner treated soil
Scale 1:50 40A SINGLE PHASE ISOLATOR - AIRCONS S 1X42W SPOTLIGHT STAGE SQUARE+BALLAST+CORD
20A SINGLE PHASE ISOLATOR - HAND DRIERS W 1X18W CFL DECORARTIVE WALL MOUNTED
LIGHT SWITCHES
54A SINGLE ISOLATOR - STOVE PHOTOCELL / DAY LIGHT SWITCH

Вам также может понравиться