Вы находитесь на странице: 1из 1

Mecca

KEY PLAN

RAFT FOUNDATION

PLB 05 SOUTH SIDE

RAFT FOUNDATION
PLB 05 NORTH SIDE

RAFT FOUNDATION
PLB 01 SOUTH SIDE

RAFT FOUNDATION

PLB 01 NORTH SIDE


ROOM

PLANT
PLB 05

PLANT
PLB 01
ROOM
WEARING COURSE LIMIT

ENTRY FROM REEM


400 KV JOINT
ABU DHABI
ISLAND TO

L.O.W
SUB-STATION 1

L.O.W
1
STAIR
FIRE EXIT
RAFT FOUNDATION
RAFT
FIRE
FOUNDATION
EXIT STAIR 2

PLB 03
PLANT ROOM STAIR
3
FIRE EXIT
RAFT FOUNDATION

SUB-STATION 3

PLANT ROOM

PLB 02
FIRE EXIT STAIR 6 FIRE EXIT STAIR 5 FIRE EXIT STAIR 4
RAFT FOUNDATION RAFT FOUNDATION PLB 04 RAFT FOUNDATION
PLANT ROOM

L.O.W
L.O.W
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHER
³ °C
WISE MENTIONED.
2. ALL LEVELS ARE IN MEASURED FROM FFL UNLESS OTHER
³
WISE MENTIONED.
3. ALL LEVELS ARE IN MILLIMETERS.
4. ALL EQUIPMENTS DETAILS (PUMPS, WATER TANK, WATER
HEATER ETC.) SUBJECT TO MATERIAL APPROVAL.
³

LEGENDS:
SYMBOLS DESCRIPTION

WATER TANK GF-02


ENLARGEMENT

1 2 3 4 5 6

EXISTING FUEL TANK

TOF +3.10

A
TOILET

M
METER
ROOM

B
EXISTING GENERATOR MEP SHAFT 3

ROOM GUARD
ROOM
WATER TANK DETAILS GF-02
N.T.S

SSL +3.00
PASSAGE WAY 02

+3.0m

ROOF ABOVE GUARD ROOM

C
TRANSFORMER ROOM 3
(CLEAR HEIGHT 4M)
SCALE 1 : 50

+5.60m

EXISTING OCC BUILDING 00 ISSUED FOR APPROVAL MK SK 23-03-20

D
EGRESS STAIR 01 Rev. Description Prepared Checked Date
Up
+5.60m
EMPLOYER

TOF +3.10
PASSAGE WAY 01

+3.0m
PMC

E
TRANSFORMER ROOM 2

FIRE PUMP ROOM


+6.55m
+3.35m
TECHNICAL ADVISOR
FGL +3.00
+5.6m

F
EGRESS CORRIDOR
MAIN CONTRACTOR
+3.1m AN
l asrContracn
tigCompanyL.L.C.
Abu Dhabi, P.O.Box 2436, UAE

G
T +971 2 642 0002 | F +971 2 642 0228
Dubai, P.O.Box 122979, UAE
+5.60m T +971 4 351 3665 | F +971 4 351 1095
alnasr.r044@alnasruae.com | www.alnasruae.com

SUB CONSULTANT :

+6.55m
EXISTING
BATTERY
EXISTING
UPS
TRANSFORMER ROOM 1
(CLEAR HEIGHT 4M)
OBERMEYER
ROOM ROOM

+3.35m SUB CONTRACTOR


UP

+5.60m +3.2m

H
PROJECT TITLE
FIRE AND LIFE SAFETY REQUIREMENTS
Main Corridor
+3.0m
FOR SERVICE ROADS OF AL MARYAH
ISLAND PROJECT
PROJECT COMPONENTS
MEP SHAFT 1

J
UP EGRESS
STAIR 02
+3.0m
HV Room
Up MEP SHAFT 2

+3.35m
DRAWING TITTLE
LIFT LOBBY

K
TECHNICAL BUILDING
INFRASTRUCTURE WATER
ELEVATOR SUPPLY LAYOUT

STATUS
SHOP DRAWING

L
Format Date Prepared Checked Scale Plot No. Int. Rev.

A1 23-03-2020 MK SK AS P1a 0b
SHOWN
SERVICE ROAD (TECHNICAL BUILDING) INFRASTRUCTURE WATER SUPPLY LAYOUT DRAWING NO. REV.
SCALE 1:100 FLS-ANC-TB-SD-IS-1033 00

Вам также может понравиться