GENERAL NOTES: 2. ALL WORDS, ARROWS, STOP BARS AND CROSSWALKS SHALL BE THERMOPLASTIC. 7.

L WORDS, ARROWS, STOP BARS AND CROSSWALKS SHALL BE THERMOPLASTIC. 7. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH TOWN OF FAIRVIEW 25. TOWN DESIGNATED WORK DAYS AND HOURS ARE AS FOLLOWS: MONDAY THRU FRIDAY
CONSTRUCTION STANDARD SPECIFICATIONS AND DETAILS, EXCEPT WHERE MODIFIED IN 7 A.M. TO 6 P.M. AND SATURDAY 8 A.M. TO 6 P.M. CONTRACTOR IS ALLOWED TO BEGIN AT 7
1. THE SIZE AND LOCATION OF ALL UNDERGROUND UTILITIES IDENTIFIED ON THESE PLANS 3. WHITE EDGE LINES SHALL BE PAINT WITH REFLECTIVE BEADS. THESE PLANS OR IN THE SPECIAL CONDITIONS OF THE CONTRACT DOCUMENTS. A.M. AND END WORK AT 6 P.M. DURING WEEKDAYS, BUT NO INSPECTIONS WILL BE GIVEN
WERE OBTAINED FROM AVAILABLE RECORDS AND ARE APPROXIMATE. THE CONTRACTOR, BEFORE 8 A.M. OR AFTER 5 P.M. SATURDAY WORK REQUIRES A 48-HOUR ADVANCE
PRIOR TO CONSTRUCTION, MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF 4. REMOVAL OF EXISTING AND TEMPORARY PAVEMENT MARKINGS IS SUBSIDIARY TO ALL NOTIFICATION TO THE TOWN.
ALL PUBLIC UTILITIES AND SHALL BE RESPONSIBLE FOR CONTACTING ALL FRANCHISE AND PAVEMENT MARKING BID ITEMS. 8. THE CONTRACTOR SHALL REMOVE FROM THE PROJECT AREA ALL SURPLUS MATERIAL.
TOWN UTILITIES. THE TOWN AND ENGINEER DO NOT ASSUME RESPONSIBILITY FOR THIS SHALL BE INCIDENTAL AND NOT A SEPARATE PAY ITEM. SURPLUS MATERIALS FROM
UTILITIES NOT SHOWN OR NOT IN THE LOCATION SHOWN. 5. TOWN WILL FURNISH AND INSTALL ALL SIGNAGE. EXCAVATION INCLUDING DIRT, TRASH, ETC. SHALL BE PROPERLY DISPOSED OF AT A SITE 26. THE CONTRACTOR SHALL PROVIDE TEMPORARY EROSION, SEDIMENTATION, AND
ACCEPTABLE TO THE ENGINEER. WATER POLLUTION PREVENTION AND CONTROL IN ACCORDANCE WITH NCTCOG STANDARD
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL PUBLIC UTILITIES IN WATER & SEWER NOTES: SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THIRD EDITION 1998, ITEM 3.12
THE CONSTRUCTION OF THIS PROJECT. ALL MANHOLES, CLEANOUTS, VALVE BOXES, FIRE UNDER CONSTRUCTION METHODS.
1. ALL MATERIALS, CONSTRUCTION, TESTING AND WORKMANSHIP SHALL CONFORM TO THE 9. CONTRACTOR SHALL SAWCUT EXISTING CURB AND GUTTER, PAVEMENT, DRIVEWAYS,
HYDRANTS, ETC. MUST BE ADJUSTED TO PROPER LINE AND GRADE BY THE CONTRACTOR
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION FOR NORTH AND SIDEWALKS AT AREAS WHERE PAVEMENT OR CONCRETE IS TO BE REMOVED.
PRIOR TO AND AFTER THE PLACING OF FINAL GRADE AND/OR PAVEMENT. ANY REMOVAL
CENTRAL TEXAS, THIRD EDITION, EXCEPT AS NOTED HEREIN AND APPROVED BY THE TOWN. SAWCUTS WILL BE CONSIDERED SUBSIDIARY TO THE PRICE BID FOR THE RESPECTIVE 27. CONTRACTOR SHALL BE REQUIRED TO SUBMIT A CONSTRUCTION SEQUENCE PLAN
OR DAMAGE TO EXISTING IMPROVEMENTS SHALL BE REPLACED OR REPAIRED BY THE
ITEM. CONTRACTOR SHALL PROVIDE COMPACTED SELECT MATERIAL AS NEEDED TO OUTLINING THE ORDER IN WHICH HE PLANS TO RECONSTRUCT THE STREETS IN THIS
CONTRACTOR AT HIS EXPENSE AND SHALL BE APPROVED BY THE TOWN. EXISTING
2. ANY PLUMBING INSTALLED OUTSIDE OF R.O.W. OR IN AN EASEMENT SHALL BE INSTALLED REPAIR DAMAGED DRIVES, STREETS, WALKS, ETC. PROJECT.
IMPROVEMENTS INCLUDE BERMS, DITCHES, FENCES, VEGETATION, ETC.
BY A LICENSED PLUMBER AND INSPECTED BY BUILDING INSPECTIONS.
3. DURING THE CONSTRUCTION OF THIS PROJECT, ANY INTERPRETATION OF THE 10. THE CONTRACTOR SHALL PRESERVE AND PROTECT OR REMOVE AND REPLACE (WITH 28. CONTRACTOR WILL NOT BE PERMITTED TO BEGIN CONSTRUCTION ON ANY ADDITIONAL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION FOR NORTH CENTRAL 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING "RECORD DRAWING" PLANS PRIOR APPROVAL OF AFFECTED PROPERTY OWNER) ANY TREES, SHRUBS, HEDGES, STREETS UNTIL RECEIVING CLEARANCE FROM THE TOWN ENGINEER.
TEXAS, AND ANY MATTER WHICH REQUIRES THE APPROVAL OF THE OWNER, MUST BE TO THE TOWN SHOWING THE LOCATION OF WATER & SANITARY SEWER SERVICES AND RETAINING WALLS, LANDSCAPING, BUILDING, WALKS, SPRINKLERS, ETC. IN OR NEAR
APPROVED BY THE TOWN BEFORE ANY CONSTRUCTION INVOLVING THAT DECISION VALVES BY DISTANCES TO LOT LINES. PROPOSED CONSTRUCTION AREA WHICH ARE NOT SPECIFICALLY DESIGNATED ON THE
COMMENCES. PLANS FOR REMOVAL AND/OR REPLACEMENT. THIS WORK SHALL BE CONSIDERED 29. ALL BLUE FIRE HYDRANT PAVEMENT MARKERS SHALL BE REMOVED AND REPLACED BY
ASSUMPTIONS ABOUT WHAT THESE DECISIONS MIGHT BE, WHICH ARE MADE DURING THE 4. ALL SANITARY SEWER LINES SHALL BE TESTED FOR INFILTRATION AND EXFILTRATION INCIDENTAL AND NOT A SEPARATE PAY ITEM. THE CONTRACTOR ON NEW PAVEMENT.
BIDDING PHASE, WILL HAVE NO BEARING ON THE DECISION. IN ACCORDANCE WITH TOWN STANDARDS. TV INSPECTIONS, LOW PRESSURE AIR
TESTING, VACUUM TESTING OF THE MANHOLES, AND MANDREL TESTING ARE REQUIRED
4. TOWN WILL PAY FOR ALL TESTING. ANY TEST THAT FAILS TO MEET TOWN REQUIREMENTS ON ALL SEWER LINES. 11. ALL GRASS AREAS DAMAGED BY CONSTRUCTION SHALL RECEIVE 4" OF TOPSOIL AND 30. ALL REINFORCING BARS SHALL BE NO.3 BARS; TRANSVERSE BARS TO BE SPACED ON
SHALL BE RE-TESTED AT THE CONTRACTOR'S EXPENSE. THE TOWN WILL ONLY ACCEPT SOLID SODDING. CONTRACTOR SHALL INSTALL SOLID BLOCK SODDING TO PRIVATE YARDS 18" CENTERS, AND LONGITUDINAL BARS TO BE SPACED ON 18" CENTERS, EXCEPT WHERE
SIGNED ORIGINAL COPIES OF ALL TESTING REPORTS FOR REVIEW. STORM SEWER NOTES: DISTURBED. REMOVE SOD, GRASS, ROOTS, WEEDS, STICKS, STONES OVER TWO (2") NOTED.
INCHES IN DIAMETER, AND OTHER FOREIGN MATERIAL FROM THE TOPSOIL. THIS WORK
5. THE CONTRACTOR SHALL LOCATE AND VERIFY THE WORKING CONDITION OF ALL 1. ALL MATERIALS, CONSTRUCTION, TESTING AND WORKMANSHIP SHALL CONFORM TO SHALL BE SUBSIDIARY TO THE PAY ITEM FOR YARD & LANDSCAPE RESTORATION.
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION FOR NORTH 31. BAR LAPS SHALL BE THIRTY (30) DIAMETERS. (12 INCHES MINIMUM).
EXISTING SPRINKLER SYSTEMS, AND PROTECT ALL EXISTING SPRINKLER SYSTEM LINES
AND HEADS (IF ANY). THE CONTRACTOR SHALL REMOVE, ADJUST AND REINSTALL CENTRAL TEXAS, THIRD EDITION, EXCEPT AS NOTED HEREIN AND APPROVED BY THE
SPRINKLER SYSTEMS IN GOOD CONDITION; REPLACE THE SPRINKLER SYSTEM, IF IN DIRECT TOWN. 12. ALL LOCAL RESIDENTS WHO WILL BE DENIED ACCESS TO THEIR DRIVEWAYS SHALL BE
32. BAR CHAIRS OR AN APPROVED DEVICE SHALL BE USED TO SUPPORT REINFORCING
CONFLICT WITH PROPOSED CONSTRUCTION, WITH THE SAME OR BETTER QUALITY NOTIFIED BY THE CONTRACTOR TWO (2) WORKING DAYS PRIOR TO THE CLOSURE OF THEIR
STEEL IN CONCRETE PAVEMENT.
MATERIAL AND APPURTENANCES, ALL AT NO EXTRA PAY. 2. ALL PRECAST BOX CULVERTS, DRAINAGE STRUCTURES AND RCP WILL REQUIRE A ACCESS. THE NOTICE SHALL INCLUDE SPECIFIC INFORMATION REGARDING THE PROPOSED
CERTIFICATION FROM THE MANUFACTURER THAT THE PRODUCT MEETS THE DESIGN CONSTRUCTION OPERATIONS AND THE LENGTH OF TIME REQUIRED BEFORE ACCESS WILL
CONSTRUCTION NOTES: REQUIREMENTS AND 28 DAY COMPRESSIVE STRENGTH. BE RESTORED. 33. MAIL SERVICES SHALL BE MAINTAINED THROUGHOUT THE PROJECT.

1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND 3. CONTRACTOR SHALL HAVE A TRENCH SAFETY PLAN AT THE TIME OF PRE-
CONSTRUCTION MEETING. 13. ALL DRIVEWAYS WHICH ARE OPEN CUT SHALL HAVE AT LEAST A TEMPORARY RIDING 34. CONCRETE USED FOR REPLACING CONCRETE CURB AND GUTTER, SIDEWALKS, VALLEY
APPROVALS BEFORE CONSTRUCTION BEGINS.
SURFACE AT THE END OF EACH DAY WHICH WILL BE CONSIDERED A NON-PAY ITEM. GUTTERS, PAVEMENT, ETC. SHALL BE 28 DAYS, 3000 PSI.
2. IT IS THE CONTRACTOR’S RESPONSIBILITY TO MAINTAIN A NEAT AND ACCURATE RECORD EROSION CONTROL NOTES:
OF CONSTRUCTION FOR THE TOWN’S RECORDS. THE CONTRACTOR SHALL PROVIDE THE 14. TOPSOIL IS DEFINED AS FRIABLE SURFACE SOIL SIMILAR IN QUALITY TO PRODUCTIVE
TOWN FULL SIZE REPRODUCIBLE MARKUPS THAT RECORD ALL CONSTRUCTION DEVIATING 1. EROSION CONTROL DEVICES SHALL BE INSTALLED PRIOR TO ANY SOIL DISTURBING
AGRICULTURAL SOILS COMMONLY OCCURRING IN THE VICINITY OF THE PROJECT. REMOVE
FROM THE PLANS. ACTIVITIES AT THE PROJECT SITE.
SOD, GRASS, ROOTS, WEEDS, STICKS, STONES OVER TWO (2") INCHES IN DIAMETER, AND
OTHER FOREIGN MATERIAL FROM THE TOPSOIL. THE CONTRACTOR SHALL REMOVE
3. CONTRACTOR SHALL NOT STORE MATERIALS, EQUIPMENT OR OTHER CONSTRUCTION 2. EROSION CONTROL DEVICES SHALL BE INSPECTED WEEKLY AND AFTER MAJOR RAIN
TOPSOIL FROM AREAS WHICH WILL BE DISTURBED BY CONSTRUCTION OPERATIONS AND
ITEMS ON ADJACENT PROPERTIES OR RIGHT-OF-WAY WITHOUT THE PRIOR WRITTEN EVENTS TO ENSURE THAT THEY ARE FUNCTIONING PROPERLY.
STOCKPILE IN EACH TEMPORARY CONSTRUCTION AREA OR A DESIGNATED AREA FOR
CONSENT OF THE PROPERTY OWNER AND THE TOWN. ALL CONSTRUCTION MATERIALS TO REUSE. BACKFILL TRENCHES ACCORDING TO SPECIFICATIONS WITH THE TOP FOUR (4")
BE REMOVED SHALL BE DISPOSED OF AT A LOCATION OFF SITE, UNLESS WRITTEN 3. SEDIMENT SHALL BE REMOVED FROM EROSION CONTROL DEVICES WHEN THE DESIGN
INCHES MINIMUM TO BE FILLED WITH THE TOPSOIL.
APPROVAL IS OBTAINED FROM THE PROPERTY OWNER AND THE TOWN. CAPATOWN HAS BEEN REDUCED BY ONE-THIRD. EROSION CONTROL DEVICES THAT
UTILIZE STONE, SHALL HAVE THE STONE REPLACED WHEN THE VOIDS SPACES IN THE
4. THE CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROL DUST. ROCK BECOME CLOGGED WITH SEDIMENT. 15. THE LOCATION OF DRIVEWAYS, STEPS, RETAINING WALLS, ETC. AND ALL WATER,
CONTRACTOR SHALL CONTROL DUST BY SPRINKLING WATER (NO SEPARATE PAY), OR AS SANITARY SEWER, STORM SEWER, TELEPHONE, GAS, ELECTRIC AND CABLE TELEVISION
APPROVED BY THE TOWN AND ENGINEER. 4. IF AN EROSION CONTROL DEVICE IS NOT FUNCTIONING PROPERLY TO ELIMINATE UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION AFTER
EROSION OR OFF-SITE SEDIMENTATION, THEN THE DEVICE MUST BE REPLACED OR CONSULTATION WITH THE RESPECTIVE UTILITY COMPANIES.
PAVING NOTES: MODIFIED. IN ADDITION, THE STORM WATER POLLUTION PLAN SHALL BE REVISED TO
INDICATE THE CHANGE.
1. ALL MATERIALS, CONSTRUCTION, TESTING AND WORKMANSHIP SHALL CONFORM TO THE 16. THE PROPOSED IMPROVEMENTS AT TIMES WILL BE CONSTRUCTED CLOSE TO OTHER
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION FOR NORTH CENTRAL 5. OFF-SITE MATERIAL STORAGE AREAS USED SOLELY BY THE PERMITTED PROJECT (I.E., EXISTING UTILITIES AND STRUCTURES BOTH ABOVE AND BELOW GROUND. THE
TEXAS, THIRD EDITION, EXCEPT AS NOTED HEREIN AND APPROVED BY THE TOWN. OFF-SITE SOIL BORROW OR SPOIL SITES) ARE CONSIDERED A PART OF THE PROJECT CONTRACTOR SHALL MAKE NECESSARY PROVISIONS FOR THE SUPPORT AND PROTECTION
AND SHALL BE ADDRESSED IN THE STORM WATER POLLUTION PREVENTION PLAN. THESE OF ALL UTILITY POLES, GAS MAINS, TELEPHONE CABLES, SANITARY SEWER LINES, TV
2. ABSOLUTELY NO LIME APPLICATION OR OTHER PREPARATION OF THE SUBGRADE FOR AREAS SHALL BE STABILIZED WITH PERMANENT GROUND COVER PRIOR TO FINAL CABLES, DRAINAGE PIPES, UTILITY SERVICES, AND ALL OF THE UTILITIES AND STRUCTURES
PAVING OF STREETS OR ALLEYS SHALL BE INITIATED WITHOUT AUTHORIZATION FROM THE APPROVAL OF THE PROJECT. BOTH ABOVE AND BELOW GROUND DURING CONSTRUCTION. THE CONTRACTOR IS LIABLE
TOWN. ONCE ALL TESTING OF UNDERGROUND FACILITIES HAVE BEEN COMPLETED AND FOR ALL DAMAGES DONE TO SUCH EXISTING FACILITIES AS A RESULT OF THE
VERIFIED TO MEET THE TOWN'S SPECIFICATIONS, THE TOWN WILL ISSUE A LETTER TO THE 6. LITTER, CONSTRUCTION DEBRIS AND CONSTRUCTION CHEMICALS EXPOSED TO STORM CONTRACTOR'S OPERATIONS.
PROJECT OWNER OR SUPERINTENDENT THAT WILL AUTHORIZE THE INITIATION OF ALL WATER SHALL BE PREVENTED FROM BECOMING A POLLUTANT SOURCE FOR STORM
SUBGRADE WORK IN PREPARATION FOR PAVING. WATER DISCHARGES.
17. NO EXCESS EXCAVATED MATERIAL SHALL BE DEPOSITED IN LOW AREAS OR ALONG
3. IF THE CONTRACTOR USES A BATCH PLANT, THE PLANT MUST BE WITHIN THE TOWN OF 7. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN NATURAL DRAINAGE-WAYS WITHOUT WRITTEN PERMISSION FROM THE PROPERTY OWNER.
FAIRVIEW LIMITS. PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR IF THE CONTRACTOR PLACES EXCESS MATERIAL IN AREAS WITHOUT WRITTEN PERMISSION,
PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE HE WILL BE RESPONSIBLE FOR ALL DAMAGE RESULTING FROM SUCH FILL, AND HE SHALL
4. THE SIDEWALKS SHALL BE CONSTRUCTED TO COMPLY WITH ALL ADA REQUIREMENTS. CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR REMOVE THE MATERIAL AT HIS OWN COST IF THE ENGINEER SO DIRECTS.
BARRIER FREE RAMPS SHALL BE CONSTRUCTED AT ALL STREET INTERSECTIONS, DRIVE PERMANENTLY CEASED.
APPROACHES AND ACCESSIBLE ROUTES. 18. CONTRACTOR SHALL SUBMIT WRITTEN REQUEST TO THE ENGINEER FOR APPROVAL OF
ALL AREAS TO BE USED FOR STAGING, MOBILIZATION, EQUIPMENT, AND MATERIAL
5. TRAFFIC BARRICADES WILL BE REQUIRED FOR ALL CONSTRUCTION WITHIN THE PUBLIC TOWN OF FAIRVIEW– GENERAL NOTES
STORAGE AND GENERAL PROJECT CONSTRUCTION MANAGEMENT. REQUEST SHALL BE
R.O.W. BARRICADES SHALL CONFORM TO THE INSTALLATION IDENTIFIED IN THE TEXAS SUBMITTED TO THE ENGINEER WITHIN FIVE (5) DAYS OF NOTICE TO PROCEED.
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, AS CURRENTLY AMENDED. THE
CONTRACTOR SHALL HAVE THE TRAFFIC CONTROL PLAN AT THE TIME OF PRE- 1. THE CONTRACTOR SHALL DISTRIBUTE LETTERS TO ALL PROPERTY OWNERS PRIOR TO
CONSTRUCTION MEETING. BEGINNING WORK ON EACH PROPERTY. THE LETTER SHALL INCLUDE NAMES AND PHONE
19. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING GENERAL SAFETY AT AND
NUMBERS OF CONTRACTOR CONTACTS, A DESCRIPTION OF THE WORK TO BE DONE, AND
ADJACENT TO THE PROJECT AREA, INCLUDING THE PERSONAL SAFETY OF THE
6. CONTROL JOINTS SHALL BE SAWED IN THE PAVEMENT ON THIS PROJECT PER TOWN THE TIME FRAME FOR DOING THE WORK. COPIES OF THE LETTER SHALL BE FORWARDED
CONSTRUCTION CREW AND GENERAL PUBLIC AND SAFETY OF PUBLIC AND PRIVATE
DETAILS AND STANDARDS. TO THE TOWN INSPECTOR. THE CONTRACTOR SHALL NOTIFY RESIDENTS 48 HOURS IN
PROPERTY.
ADVANCE OF PERFORMING ANY WORK ON PRIVATE PROPERTY.
7. ALL PAVING DIMENSIONS ARE TO EDGE OF PAVEMENT AND/OR FACE OF CURB, UNLESS
OTHERWISE NOTED. 20. ALL BARRICADES, WARNING SIGNS, LIGHT DEVICES, ETC. FOR THE GUIDANCE AND
2. THE CONTRACTOR SHALL VIDEO ALL POTENTIALLY IMPACTED PRIVATE PROPERTY
PROTECTION OF TRAFFIC AND PEDESTRIANS MUST CONFORM TO THE INSTALLATION
AREAS PRIOR TO WORK. VIDEOS SHALL INCLUDE DATE NOTATION AND AUDIO
8. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PERFORMING ALL CONSTRUCTION SHOWN IN THE TEXAS MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, AS CURRENTLY
IDENTIFICATION OF PROPERTY ADDRESS AND PROJECT NAME. THE CONTRACTOR SHALL
LAYOUT FROM THE SITE LAYOUT CONTROL POINTS, AND FROM THE DIMENSIONS AND AMENDED, PUBLISHED BY THE TEXAS DEPARTMENT OF TRANSPORTATION.
PROVIDE ONE COPY OF THE VIDEO TAPE TO THE INSPECTOR PRIOR TO CONSTRUCTION.
CENTERLINES SHOWN. THE CONTRACTOR MUST NOTIFY THE ENGINEER OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
21. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND SIDEWALKS
3. CONTRACTOR’S PERSONNEL SHALL WEAR IDENTIFYING CLOTHING OR HATS AT ALL
9. ALL SIGNAGE THAT IS REMOVED BY THE CONTRACTOR SHALL BE SAVED AND ADJACENT TO THE PROJECT FREE OF MUD AND DEBRIS FROM THE CONSTRUCTION.
TIMES.
REINSTALLED. ANY DAMAGE TO THE SIGNS SHALL BE REPAIRED BY THE CONTRACTOR AND
ACCEPTED BY THE TOWN. IF THE SIGN CANNOT BE REPAIRED, THE CONTRACTOR SHALL
22. TWO-WAY TRAFFIC MUST BE MAINTAINED AT ALL TIMES. ONE LANE OF TRAVELWAY
REPLACE THE SIGN. NO SEPARATE PAY. 4. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING WATER AND SEWER CONNECTIONS TO
AROUND CONSTRUCTION OPERATIONS IN PROGRESS WITH ADEQUATE SAFEGUARDS WILL
HOMES IN WORKING ORDER AT ALL TIMES. IN NO CASE SHALL SERVICES BE ALLOWED TO
10. BROOM FINISHING SHALL BE PERFORMED SO THAT THE CORRUGATION PRODUCED IN BE ACCEPTABLE.
REMAIN OUT OF SERVICE OVERNIGHT.
THE SURFACE SHALL BE UNIFORM IN APPEARANCE AND NOT MORE THAN 1/8-INCH IN
DEPTH. BROOMING SHALL BE COMPLETED BEFORE THE CONCRETE IS IN SUCH CONDITION 23. THE CONTRACTOR SHALL CLEANUP AND RESTORE THE AREA OF OPERATIONS TO A
THAT THE SURFACE WILL BE TORN OR UNDULY ROUGHENED BY THE OPERATION. THE 5. VALVE ADJUSTMENTS SHALL BE CONSTRUCTED SUCH THAT THE COVERS ARE AT
CONDITION AS GOOD AS OR BETTER THAN THAT WHICH EXISTED PRIOR TO
FINISHED SURFACE SHALL BE FREE FROM ROUGH AND POROUS AREAS, IRREGULARITIES FINISHED SURFACE GRADE OF THE ASPHALT OVERLAY OR RECONSTRUCTION.
CONSTRUCTION.
AND DEPRESSIONS RESULTING FROM IMPROPER HANDLING OF THE BROOM.

11. CRACKS FORMED IN CONCRETE PAVEMENT SHALL BE REPAIRED OR REMOVED BY THE 6. CONTRACTOR SHALL BECOME FAMILIAR WITH THE TERMS AND CONDITIONS OF
24. STREETS CAN BE CLOSED IF THERE IS OTHER ACCESS TO THE SURROUNDING
CONTRACTOR AT THE TOWN’S DISCRETION. TEMPORARY CONSTRUCTION EASEMENTS AND/OR RIGHT-OF-ENTRY AGREEMENTS.
PROPERTIES. ALL STREET CLOSINGS MUST BE CLEARED THROUGH THE TOWN OF FAIRVIEW
INGRESS AND EGRESS IS ALLOWED ON PRIVATE PROPERTY IN ORDER TO ACCESS
ENGINEERING OFFICE. ALL PUBLIC SAFETY DEPARTMENTS (FIRE, POLICE, ETC.) AND THE
PAVEMENT MARKING AND SIGNAGE NOTES: TEMPORARY CONSTRUCTION EASEMENTS. IN THE AREAS WHERE NO CONSTRUCTION
AFFECTED HOMEOWNERS SHALL BE GIVEN NOTIFICATION AT LEAST 48 HOURS IN ADVANCE
EASEMENTS ARE AVAILABLE, CONTRACTOR SHALL LIMIT ACTIVITIES TO WITHIN THE
OF THE STREET CLOSING.
1. ALL PAVEMENT MARKINGS WITH THE EXCEPTION OF WORDS, ARROWS, STOP BARS, EXISTING UTILITY AND/OR DRAINAGE EASEMENT.
CROSSWALKS, AND WHITE EDGE LINES SHALL BE RAISED PAVEMENT MARKERS.