About :
Hery Mada Indra Paska ,SET, ST, MMT, M.Eng, CCP
Degree :
• Bachelor Applied Degree in Accounting
• Bachelor of Mechanical Engineering
• Master of Management Technology
• Master of Engineering in Mechanical Engineering
Experience :
• More than 15 years of industrial experience in Mining and Oil&Gas.
Certification :
• Cost Certified Professional – AACEI
Competency :
Cost Engineering :
• Budgeting, Cost Engineering and Control
• ESAR and CSRA
• Well Development Project Planning
• Cost Estimation & Analysis
• Oil & Gas Project Management, Earn Value Management and Risk Management System
• Proficiency in Total Cost Management (life cycle costing).
• Proficiency from conceptual to detailed design engineering estimate
• Familiar with various construction contracts such as Production Sharing Contract (PSC System),
traditional lump sum, unit rate and EPC contracts
• Project Portfolio Monitoring
• Contract Administration and Implementation
Mechanical Engineering :
• New Renewable Energy : Solar Chimney Power Plant
• Basic Heat Transfer, Thermodynamics and Fluid Mechanics
Industrial Engineering :
• Quality Function Deployment : From Voice of Engineer to Voice of Customer
• Master Production Schedule, Layout System, Total Quality Management, Lean Sigma, Ergonomics 2
Agenda
3
© 2020 Hery Business Strategic Corporation
What is Cost Engineering?
• Consistency of Project
Management / Cost
Engineering
Implementation
• Organizational Capability
• Consistency of competency
development
• “Cost Engineering includes the work processes, procedures, tools, and practitioners to develop
quality, predictable project cost estimates, schedules and CE risk management plans; and then
manage project execution through sound project controls.”
• AACE International defines Cost Engineering as: “That area of engineering practicewhere
engineering judgment and experience are utilized in the application of scientific principlesand
techniques to the problems of cost estimating, cost control and profitability”.
Good
Randomly
Project
Project
EXECUTION
Success
Success
Project Poor
Fail Project
Successful Project from CE perspective:
Actual Cost = in +/- 10% variance from Planned Cost Poor PLANNING Good
Actual Schedule = in +/- 10% variance from Planned Schedule
5
© 2020 Hery Business Strategic Corporation
What is Cost Engineering?
• Estimating
• Planning
• Cost Control / Cost Management
• Contracting / Tendering
• Quantity Survey
• Risk Assessment
• Value Engineering
6
© 2020 Hery Business Strategic Corporation
Cost Engineering Hand Book
TCM is a Process for Applying the Skills and Knowledge of Cost Engineering :
“…the effective application of professional and technical expertise to plan and control resources,
costs, profitability and risks. Simply stated, it is a systematic approach to managing cost
throughout the life cycle of any enterprise, program, facility, project, product, or service. This is
accomplished through the application of cost engineering and cost management principles,
proven methodologies and the latest technology in support of the management process.”
7
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
Birth of the Cost Engineer
• Merchants should seek advise from engineers
• Engineers often see their designs too optimistic
• The merchants protect themselves by cost experts, and than it all went a bit
wrong!
• medical disabled technicians became Cost Engineers
• technologists saw the Cost Engineers as spoilers
• Cost Engineers could shoot the technologists
• the Cost Engineer is the only engineer who knows that the outcome of
his calculations will be wrong
8
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
9
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
10
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
11
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
12
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
13
© 2020 Hery Business Strategic Corporation
Why Cost Engineering?
14
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
15
© 2020 Hery Business Strategic Corporation
CE Framework
16
© 2020 Hery Business Strategic Corporation
Project Element
Quality
Schedule
Cost
Scope
Plan
Implement
PM Tools
Skills
Project Communication Plan
Risks
Review, Reflect or Report
Project Organization
17
© 2020 Hery Business Strategic Corporation
The Enterprise Perspective of Cost Engineering
18
© 2020 Hery Business Strategic Corporation
The Two Levels of Cost Engineering
Focus and Process Areas
19
© 2020 Hery Business Strategic Corporation
The Two Levels of Cost Engineering
Asset Level Activities by Project Development &
Execution Process (PDEP) Phase
20
© 2020 Hery Business Strategic Corporation
The Two Levels of Cost Engineering
Project Level Activities by Project Development &
Execution Process (PDEP) Phase
21
© 2020 Hery Business Strategic Corporation
Cost Engineering in PDEP
22
© 2020 Hery Business Strategic Corporation
The Influence Curve
23
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
24
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
25
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
26
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
27
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
28
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
29
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
30
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
31
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
32
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
33
© 2020 Hery Business Strategic Corporation
Role of Cost Engineer
34
© 2020 Hery Business Strategic Corporation
Q&A
35
Thank You
36