Вы находитесь на странице: 1из 1

ROOFING CONSTRUCTION ROOFING CONSTRUCTION

• To be constructed with aid of an engineers. • To be constructed with aid of an engineers.


• Thickness of slab and reinforcement to engineers details • Thickness of slab and reinforcement to engineers details
and specification ROOF/L +9154 and specification ROOF/L +9154
ROOF/L +9154 ROOF/L +9154
Chimney as PARTv OF NBR
TO COMPLY WITH SANS/SABS
natural stone cladding
to be placed on chimney walls ROOF 1/L +7349 ROOF 1/L +7349
ROOF 1/L +7349 ROOF 1/L +7349

SLAB +170 SLAB +170


SLAB +170 plaster and paint SLAB +170 CL/L+ 2725 CL/L+ 2725
CL/L+ 2725 client choice approved by HOA CL/L+ 2725 WN/L+2125 WN/L+2125
WN/L+2125 WN/L+2125
Window and door frames: plaster and paint STEEL BALUSTRADES STEEL BALUSTRADES
Powder coated w34 w32 HOA APPROVAL HOA APPROVAL
client choice approved by HOA
Charcoal aluminium finish STEEL BALUSTRADES
FFL+170 FFL+170
FFL+170 WC HOA
B APPROVAL WC B FFL+170
CL/L- 2725 Window and door frames: CL/L- 2725
CL/L- 2725 w15 w16 w17 w18 w22 w23 CL/L- 2725 Powder coated
w3 w2 w1 WN/L-2125 WN/L-2125
WN/L-2125 Charcoal aluminium finish
WN/L-2125
BW/L-1800
1.8M HIGH BOUNDARY
BW/L-1800 GENERAL NOTES
DRAINAGE NOTES:
WC WALL
FFL-225 B FFL-225 * ALL PLUMBING AND DRAINAGE WORK AND INSTALLATION OF SANITARY FITTINGS
FFL-225 S FFL-225 RE RE TO COMPLY WITH THE RELEVANT LOCAL AUTHORITY BYLAWS, REGULATIONS &
1.8M HIGH BOUNDARY WALL G REQUIREMENTS.
* ALL SOIL PIPES MUST BE 110[ PVC
IE NEW 100mm DIA uPVC to be laid at1:60 MIN. Depth 1:50m fall IE NEW 100mm DIA uPVC to be laid at1:60 MIN. Depth 1:50m fall IE * ALL WASTE PIPES MUST BE 50[ PVC
STEEL BALUSTRADES IE IE IE STEEL BALUSTRADES
HOA TO APPROVE HOA TO APPROVE * PROVIDE IE'S TO ALL BENDS AND JUNCTIONS WITH SUITABLE MARKERS AT NGL.
NEW 100mm DIA uPVC to be laid at1:60 MIN. Depth 1:50m fall * MINIMUM FALLS TO DRAINPIPES TO BE 1-60 UNLESS OTHERWISE INDICATED.
* PROVIDE RESEAL TRAPS TO ALL WASTE FITTINGS.
* PROVIDE ANTI-VAC TRAPS ON ALL 1ST FLOOR FITTINGS.
* PROVIDE AE'S TO FOOT OF ALL SOIL STACKS.
* IE'S TO ALL PIPES TO BE FULLY ACCESSIBLE AT ALL TIMES AND SOIL PIPES
PASSING UNDER BUILDING OR FOOTINGS TO BE ENCASED IN A MIN. OF 100mm
CONC.
* ONE TAP OVER ONE GULLY WILL BE SUPPLIED.
* DRAIN PIPES, IE'S AND CE'S TO BE CLEAR OF ANY FOUNDATIONS OR PAVING
Pergola strucuture below AND EASILY ACCESSIBLE
ROOFING CONSTRUCTION specialist to comply with ROOFING CONSTRUCTION
• To be constructed with aid of an engineers. design • To be constructed with aid of an engineers. GENERAL:
• Thickness of slab and reinforcement to engineers details • Thickness of slab and reinforcement to engineers details * ALL WORK TO BE IN ACCORDANCE WITH LOCAL
and specification and specification BYLAWS, WORK TO FIGURED DIMENSIONS ONLY.
ROOF/L +9154 ROOF/L +9154
* DO NOT SCALE DRAWING.
ROOF/L +9154 chimney as per v of nbr ROOF/L +9154 * OVERALL EXTERNAL DIMS TO TAKE PRECEDENCE.
to comply with SANs/SABS * ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE CONSTRUCTION.
roof concrete tile roof concrete tile ROOF 1/L +7349 ROOF 1/L +7349 * FINAL LEVELS HEIGHT OF PLINTHS, DEPTHS OF EXCAVATIONS & NUMBER OF STEPS
pitched@24 deg Steel balustrades to be pitched@24 deg TO BE DETERMINED ON SITE BY CONSTRUCTOR.
ROOF 1/L +7349 approved by HOA ROOF 1/L +7349 * ALL MATERIALS, FITTINGS, FINISHES ETC. TO BE FULL APPROVAL OF THE OWNER.
* ALL STEPS TO CONFORM TPO SABS REGULATIONS.
*SEWERAGE
IN CASE OFNOTE:
DOUBT - ASK
* ALL WASTE PIPES TO BE 50[ PVC
Window and door frames: * ALL SOIL PIPES TO BE 100[ PVC
Powder coated
SLAB +170 SLAB +170
* FOUNDATIONS TO BE RE-INFORCED
SLAB +170 Charcoal aluminium finish SLAB +170 CL/L+ 2725 CL/L+ 2725 OVER SOIL PIPES RUNNING UNDER
CL/L+ 2725 CL/L+ 2725 WN/L+2125 WN/L+2125 ANY BUILDINGS.
Better Architectural Projects
WN/L+2125 WN/L+2125 Pty (Ltd)
Cell 060 920 2623
FFL+170 FFL+170 Cell 2 076 266 9117
FFL+170 FFL+170 betterarchitects@mail.com
CL/L- 2725 CL/L- 2725
03 Kalafong heights Atteridgeville
CL/L- 2725 CL/L- 2725 WN/L-2125 WN/L-2125
WN/L-2125 WN/L-2125 *0-0.75m = 3mm GLASS. 0008
B.WALL/L-1800 B.WALL/L-1800 *0.75m-1.5m = 4mm GLASS
B.L/L-1800 B.L/L-1800 *1.5m-2.0m = 5mm glass
FFL-225
RE
B WC
RE
FFL-225 *4mm OBSCUERED GLASS GLAZING
FFL-225 FFL-225 BATHROMS
GLAZING AS PER PART N OF
Ngl to FFL 170 (min 150)
IE IE Excavations min 300mm NBR
NEW 100mm DIA uPVC to be laid at1:60 MIN. Depth 1:50m fall
ELECTRIC LAYOUT

KEY DESCRIPTION

CEILING LIGHT POINT


ROOFING CONSTRUCTION
• To be constructed with aid of an engineers. WALL MOUNTED LIGHT POINT
• Thickness of slab and reinforcement to engineers details
CONCRETE ROOF TILE and specification LIGHT SWITCHES
ROOF 1/L +7349 PITCHED @ 30 DEG. ROOF 1/L +7349
15 AMP PLUG POINT

PERGOLA MB METER BOX

30.0
STRUCTURE


SLAB +170 SLAB +170 DB DISTRIBUTION BOX
CL/L+ 2725 CL/L+ 2725
FLORESCENT
WN/L+2125 WN/L+2125
G GEYSER POINT

7302
BALCONY PJ LOUNGE STAIRCASE
LANDING TELEPHONE POINT
FFL+170 FFL+170
NGL
CL/L- 2725 NGL CL/L- 2725 RELEVISION POINT
NGL
WN/L-2125 WN/L-2125

B.L/L-1800 LOUNGE B.L/L-1800


KITCHEN YARD CLIENT/OWNER
FFL-225 NGL FFL-225
NGL NGL NGL MNISI

609
PROJECT TITLE

230

230
EARTH
600 600 NEW PROPOSSED DWELLING
ERF 43
SECTION A-A ESTATE D' AFRIQUE
SCALE 1:100 MNISI

AREAS
GROUND FLOOR FIRST FLOOR TOTAL
WINDOW AND GLAZING DOOR SCHEDULE
268M/2 155M/2 423M/2

600
SITE COVERAGE

1813
2065

2125
545 750M/2 56%

1678 1039 1725


TYPE TYPE TYPE TYPE
QUANTITY QUANTITY QUANTITY QUANTITY
Drawn by Scales used DATE
LEBO As shown
Sacap Reg Signature

DRAWING NUMBER
12
PAGE 1 OF 1

Вам также может понравиться