Вы находитесь на странице: 1из 2

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2019'
Institute Name: Indian Institute of Science Education & Research Kolkata [IR-O-U-0572]

Sanctioned (Approved) Intake


Academic Year 2017-18 2016-17 2015-16 2014-15 2013-14 2012-13

UG [5 Years Program(s)] 200 200 200 200 200 -

PG [2 Year Program(s)] 5 0 - - - -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [5 Years 700 223 923 320 603 0 133 433 218 0 0 348
Program(s)]

PG [2 Year 2 1 3 0 3 0 2 0 0 0 0 2
Program(s)]

Placement & Higher Studies

UG [5 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2011-12 200 90 2012-13 0 2015-16 78 3 800000(Eight Lakh 65


Rupees Only)

2012-13 200 109 2013-14 0 2016-17 92 3 1200000(Twelve Lakh 81


Rupees Only)

2013-14 200 143 2014-15 0 2017-18 127 11 650000(Six Lakh Fifty 110
Thousand Only)

PG [2 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2014-15 5 5 2015-16 2 0 0(Zero) 0

2015-16 0 0 2016-17 0 0 0(Zero) 0

2016-17 0 0 2017-18 0 0 0(Zero) 0

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2017-18; Students admitted in the academic year 2018-19 should not be entered here.)

Total Students

Full Time 428

Part Time 0

No. of Ph.D students graduated (including Integrated Ph.D)

2017-18 2016-17 2015-16

Full Time 43 41 32

Part Time 0 0 0

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 49616603 (Rupees four crore ninty six lakh sixteen thousand 55981027 (Rupees five crore fifty nine lakh eighty one 46235603 (Rupees four crore sixty two lakh thirty five thousand
six hundred and three only) thousand and twenty seven only) six hundred and three only)

New Equipment for Laboratories 85671810 (Rupees eight crore fifty six lakh seventy one 124860565 (Rupees twelve crore forty eight lakh sixty 49140922 (Rupees four crore ninty one lakh forty thousand
thousand eight hundred and ten only) thousand five hundred and sixty five only) nine hundred and twenty two only)

Engineering Workshops 37829095 (Rupees three crore seventy eight lakh twenty nine 5969549 (Rupees fifty nine lakh sixty nine thousand five 565376 (Rupees five lakh sixty five thousand three hundred
thousand and ninty five only) hundred and forty nine only) and seventy six only)

Other expenditure on creation of Capital Assets (excluding 54647526 (Rupees five crore forty six lakh forty seven 48940315 (Rupees four crore eight nine lakh forty thousand 79069280 (Rupees seven crore ninty lakh sixty nine thousand
expenditure on Land and Building) thousand five hundred and twenty six only) three hundred and fifteen only) two hundred and eighty only)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 376328011 (Rupees thirty seven crore sixty three lakh twenty 257830810 (Rupees twenty five crore seventy eight lakh thirty 219654012 (Twenty one crore ninty six lakh forty thousand and
eight thousand and eleven only) thousand eight hundred and ten only) twelve only)

Maintenance of Academic Infrastructure or consumables, 308678138 (Rupees thirty crore eighty six lakh seventy eight 328393339 (Rupees thirty two crore eighty three lakh ninty 221466731 (Rupees twenty two crore fourteen lakh sixty six
other running expenditures etc.(excluding maintenance of thousand one hundred and thirty eight only) three thousand three hundred and thirty nine only) thousand seven hundred and thirty one only)
hostels and allied services)

Seminars/Conferences/Workshops 886608 (Rupees eight lakh eighty six thousand six hundred 1681134 (Rupees sixteen lakh eighty one thousand one 3176164 (Rupees thirty one lakh seventy six thousand one
and eight only) hundred and thirty four only) hundred and sixty four only)

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

Вам также может понравиться