Академический Документы
Профессиональный Документы
Культура Документы
Smart Task 04
✔ Apart from making one report, there is NO other task in this module. Your evaluation of this
internship will be done on the report and hence make it in a professional way.
1. The report should be in the A4 page ONLY, prepared on MS Word / Google Docs / WPS. Reports in
the form of presentation will NOT be accepted.
2. The report SHOULD be well formatted and MUST have all the features of a good report. Such as
Cover Page, Executive Summary, Table of Contents, List of Figures, List of Tables, Footnote,
Endnote, Justified Text, Bibliography and References. Please check the Sample Report for
reference.
4. Report SHOULD have pictures, graphs, tables and charts etc showing the analysis done during the
project. Having ONLY text in the report is not acceptable.
6. The content of the report SHOULD have “Introduction” as first chapter and “Conclusion” as last
chapter. The middle chapters can be chosen as per the project title and analysis done.
7. In the executive summary, the interns should mention about VCE and the experience about this
internship. There is NO need to mention about VCE anywhere else in the report.
8. The content of the report SHOULD be in your words, so that you can take the reference of this
report in future.
9. Your quality of report will be the main deciding factor for evaluating your work in this internship. We
will provide an internship certificate, letter of recommendation and select the best interns as per the
report submitted by the interns. So, focus and prepare it as per the instructions.
https://techvardhan.com/
VCE Summer Internship Program 2020
Smart Task 04
As an intern of VCE, we would like you to help some of our clients by preparing financial model and report
on different cases (you need to select ONE case only).
CASE-01
Project Title : Financial Modeling and Analysis of 10 MW Solar/Wind Power Project in Porbandar, Gujarat IN
Techvardhan Power Pvt. Ltd (Any Company) “CLIENT” has signed a PPA for 25 years with GUVNL for a 10 MW
Solar PV / Wind Power Plant at a fixed tariff of Rs. 3.50 / kWh. The project location is in Porbandar Gujarat,
India.
They are expecting a net annual energy production of 18 Million kWh / year with a degradation of 1% per annum.
The expected CapEx is Rs. 3 Crore / MW and OpEx is Rs. 30 Lacs / per annum for the whole plant.
They are seeking a non-recourse debt (project financing) with 70:30 as D/E ratio from leading commercial banks
in India as a 12 years (maximum) term loan.
Please prepare a financial model and analyse the cost, revenue and debt repayment along with finflow / cash
flow analysis. Calculate equity IRR and DSCR.
https://techvardhan.com/
VCE Summer Internship Program 2020
Smart Task 04
CASE-02
Project Title : Financial Modeling and Analysis of 20 TPD Pyrolysis Project in Pune, Maharashtra IN
Techvardhan Energy Pvt. Ltd (Any Company) “CLIENT” has signed a long term FSA with a large industrial player
for supplying refined pyrolysis oil of 10,000 LPD at a rate of Rs. 15 per Litre. They want to set up a 20 TPD
pyrolysis plant near Pune MH.
The expected CapEx is Rs. 10 Crore and OpEx is Rs. 2 Crore / per annum for the whole project.
They are seeking a non-recourse debt (project financing) with 70:30 as D/E ratio from leading commercial banks
in India as a 12 years term loan.
Please prepare a financial model and analyse the cost, revenue and debt repayment along with finflow / cash
flow analysis. Calculate equity IRR and DSCR.
CASE-03
Project Title : Financial Modeling and Analysis of 50 Flats Housing Project in Gurgaon, Haryana IN
Techvardhan Infra Pvt. Ltd (Any Company) “CLIENT” has acquired a piece of land near Gurugram HR and wants
to develop it as a residential building having 50 flats of 900 sq. ft each.
They are expecting to sell the flats at a rate of Rs. 4000 / sq.ft. The expected CapEx is Rs. 8 Crore and OpEx is Rs.
50 Lacs / per annum for the whole project.
They are seeking a non-recourse debt (project financing) with 70:30 as D/E ratio from leading commercial banks
in India as a 12 years term loan.
Please prepare a financial model and analyse the cost, revenue and debt repayment along with finflow / cash
flow analysis. Calculate equity IRR and DSCR.
CASE-04
Project Title : Financial Modeling and Analysis of PPP based Airport Development Project in Ranchi, JH
Techvardhan Infra Pvt. Ltd (Any Company) “CLIENT” has been alloted a project of building and operating (for 20
years) a new commercial airport in Ranchi, JH. They can charge different charges to the airlines through their
Schedule of Charges. The charges were eventually paid by the passengers which roughly calculated as Rs. 500
per passenger.
They are expecting to have a passenger traffic of 1 Million with an increase of 5% every year. The expected CapEx
is Rs. 100 Crore and OpEx is Rs. 25 Crores / per annum for the whole airport.
https://techvardhan.com/
VCE Summer Internship Program 2020
Smart Task 04
They are seeking a non-recourse debt (project financing) with 70:30 as D/E ratio from leading commercial banks
in India as a 12 years term loan.
Please prepare a financial model and analyse the cost, revenue and debt repayment along with finflow / cash
flow analysis. Calculate equity IRR and DSCR.
CASE-05
Project Title : Financial Modeling and Analysis of PPP based Expressway Project in Hyderabad, TN
Techvardhan Infra Pvt. Ltd (Any Company) “CLIENT” has been alloted a project of building and operating (for 20
years) a new expressway between Hyderabad and Anantapur AP. They can charge different charges to the
vehicles using the expressway through their Schedule of Charges, which is averagely calculated as Rs. 160 per
vehicle.
They are expecting to have a vehicle traffic of 10000 vehicles per day with an increase of 5% every year. The
expected CapEx is Rs. 200 Crore and OpEx is Rs. 28 Crores / per annum for the whole airport.
They are seeking a non-recourse debt (project financing) with 70:30 as D/E ratio from leading commercial banks
in India as a 12 years term loan.
Please prepare a financial model and analyse the cost, revenue and debt repayment along with finflow / cash
flow analysis. Calculate equity IRR and DSCR.
CASE-06
Project Title : Lender's Analysis of Project Financial Cash Flows and Risk Assessment of Infrastructure
Projects.
Techvardhan Infra Bank Ltd (Any Company) “CLIENT” is a bank who want to provide Non-Recourse Debt as per
their policy.
They want your help to analyse the financial models, cost break up and revenue realization sheets and make a
credit worthiness report on any proposed infrastructure project for project financing.
Take the example of any infrastructure project from the above and create a credit worthiness report of the
project. Please perform a risk assessment also and advise the bank if it is worthy to fund or not as per the