Вы находитесь на странице: 1из 3

BOQ Summary Page 1 of 1

BOQ SUMMARY

Project Name: M/S MAHATHI MEDICAL

Element :  Footing

No. Material Unit Quantity Rate Cost


1 Concrete C30 (cum) 198.76 7000.00 1391320
Sub Total 198.76 13,91,320

2 Rebar T12 (Fe500) (kg) 3319.07 60.00 199144


3 Rebar T16 (Fe500) (kg) 1115.62 60.00 66937
Sub Total 4434.69 2,66,081

4 Shuttering (sqm) 316.62 500.00 158310


5 PCC (cum) 41.56 4500.00 187020
6 Excavation (cum) 1108.16 350.00 387856
7 Backfilling (cum) 837.57 250.00 209393
Sub Total 9,42,578

Grand Total 25,99,979

Design Metrics
1 Consumption : Reinforcement/Concrete ratio = 22.31 kg/cum
2 Concrete % C30 = 100.00 % 
3 Shuttering  = 1.59 sqm/cum

file:///C:/TEMP/tmp380A.tmp 10-02-2020
Detailed - Reinf Type Wise Page 1 of 1

DETAILED BOQ (AS PER REINFORCEMENT TYPE)


Project Name : M/S MAHATHI MEDICAL
Client Name : M/S MAHATHI MEDICAL
Engineer Name : JJV
Design File : C:\Users\vijay\OneDrive\Desktop\SSD3.rcdx
Analysis File : C:\Users\vijay\OneDrive\Desktop\MAHATHI\MAHATHI.std
Analysis Last Modified : 10-02-2020 02:00:35

Element Concrete (cum) Reinforcement (kg) Shuttering PCC Excavation Back Filling


C30 Main Links Face Total sqm cum cum cum
C1 1.13 30 0 0 30 4.05 0.30 8.10 5.87
C12 1.13 30 0 0 30 4.05 0.30 8.10 5.87
C27 1.13 30 0 0 30 4.05 0.30 8.10 5.87
C38 1.13 30 0 0 30 4.05 0.30 8.10 5.87
C2 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C3 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C4 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C5 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C28 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C29 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C30 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C31 2.99 70 0 0 70 6.57 0.68 18.04 13.57
C6 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C7 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C8 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C9 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C10 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C11 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C32 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C33 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C34 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C35 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C36 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C37 8.50 185 0 0 185 11.07 1.71 45.54 34.53
C13 4.45 101 0 0 101 8.01 0.96 25.48 19.28
C14 4.45 101 0 0 101 8.01 0.96 25.48 19.28
C18 4.45 101 0 0 101 8.01 0.96 25.48 19.28
C19 4.45 101 0 0 101 8.01 0.96 25.48 19.28
C22 4.45 101 0 0 101 8.01 0.96 25.48 19.28
C23 4.45 101 0 0 101 8.01 0.96 25.48 19.28
C15 6.44 143 0 0 143 9.63 1.33 35.38 26.82
C16 6.44 143 0 0 143 9.63 1.33 35.38 26.82
C17 6.44 143 0 0 143 9.63 1.33 35.38 26.82
C20 6.44 143 0 0 143 9.63 1.33 35.38 26.82
C21 6.44 143 0 0 143 9.63 1.33 35.38 26.82
C24 6.44 143 0 0 143 9.63 1.33 35.38 26.82
C25 1.46 36 0 0 36 4.59 0.37 9.90 7.27
C26 1.46 36 0 0 36 4.59 0.37 9.90 7.27
Total 198.70 4436 0 0 4436 316.62 41.64 1108.16 837.54

file:///C:/TEMP/tmp3974.tmp 10-02-2020
Detailed - Reinf Type Wise Page 1 of 1

DETAILED BOQ (AS PER REBAR)


Project Name : M/S MAHATHI MEDICAL
Client Name : M/S MAHATHI MEDICAL
Engineer Name : JJV
Design File : C:\Users\vijay\OneDrive\Desktop\SSD3.rcdx
Analysis File : C:\Users\vijay\OneDrive\Desktop\MAHATHI\MAHATHI.std
Analysis Last Modified : 10-02-2020 02:00:35

Element Concrete (cum) Reinforcement (kg) Shuttering PCC Excavation Back Filling


C30 12 16 Total sqm cum cum cum
C1 1.13 30 30 4.05 0.30 8.10 5.87
C12 1.13 30 30 4.05 0.30 8.10 5.87
C27 1.13 30 30 4.05 0.30 8.10 5.87
C38 1.13 30 30 4.05 0.30 8.10 5.87
C2 2.99 70 70 6.57 0.68 18.04 13.57
C3 2.99 70 70 6.57 0.68 18.04 13.57
C4 2.99 70 70 6.57 0.68 18.04 13.57
C5 2.99 70 70 6.57 0.68 18.04 13.57
C28 2.99 70 70 6.57 0.68 18.04 13.57
C29 2.99 70 70 6.57 0.68 18.04 13.57
C30 2.99 70 70 6.57 0.68 18.04 13.57
C31 2.99 70 70 6.57 0.68 18.04 13.57
C6 8.50 92 93 185 11.07 1.71 45.54 34.53
C7 8.50 92 93 185 11.07 1.71 45.54 34.53
C8 8.50 92 93 185 11.07 1.71 45.54 34.53
C9 8.50 92 93 185 11.07 1.71 45.54 34.53
C10 8.50 92 93 185 11.07 1.71 45.54 34.53
C11 8.50 92 93 185 11.07 1.71 45.54 34.53
C32 8.50 92 93 185 11.07 1.71 45.54 34.53
C33 8.50 92 93 185 11.07 1.71 45.54 34.53
C34 8.50 92 93 185 11.07 1.71 45.54 34.53
C35 8.50 92 93 185 11.07 1.71 45.54 34.53
C36 8.50 92 93 185 11.07 1.71 45.54 34.53
C37 8.50 92 93 185 11.07 1.71 45.54 34.53
C13 4.45 101 101 8.01 0.96 25.48 19.28
C14 4.45 101 101 8.01 0.96 25.48 19.28
C18 4.45 101 101 8.01 0.96 25.48 19.28
C19 4.45 101 101 8.01 0.96 25.48 19.28
C22 4.45 101 101 8.01 0.96 25.48 19.28
C23 4.45 101 101 8.01 0.96 25.48 19.28
C15 6.44 143 143 9.63 1.33 35.38 26.82
C16 6.44 143 143 9.63 1.33 35.38 26.82
C17 6.44 143 143 9.63 1.33 35.38 26.82
C20 6.44 143 143 9.63 1.33 35.38 26.82
C21 6.44 143 143 9.63 1.33 35.38 26.82
C24 6.44 143 143 9.63 1.33 35.38 26.82
C25 1.46 36 36 4.59 0.37 9.90 7.27
C26 1.46 36 36 4.59 0.37 9.90 7.27
Total 198.70 3320 1116 4436 316.62 41.64 1108.16 837.54

file:///C:/TEMP/tmp3ACE.tmp 10-02-2020