Академический Документы
Профессиональный Документы
Культура Документы
¤ Change management Skill PROCESS Name : Project Management ¤ RICO12 QSP 03 (Process for PPAP) TS Standards
¤ Knowledge of Core Tools (New Product Development) ¤ RICO 12 QSP 02 (Process for Process FMEA) TS 16949:2009
¤ Engineering design Skill ¤ RICO 12 QSP 01( Procedure for control plan)
¤ Costing Skill ¤ RICO 12 QSP 04( Procedure for Process Flow Diagram) EMS / OHSAS Standards
¤ Project Management Skill ISO 14001:2004 / OHSAS 18001:2007
ECN Management
Development
Government regulatory requirement Timely Implementation of ECN
¤ AIAG Manual On Time Development of Part PROJECT MANAGEMENT
¤ Special Product characteristics
(NEW PRODUCT DEVELOPMENT)
¤ TGW / TGR Reports / PFMEA
Plant Head
PROCESS OBJECTIVES
PROCESS INTERFACE
¤ Marketing EFFECTIVENESS
Customer Drawings / Customer Specific requirements / Kick-off Dates
¤ Purchase TOOL ROOM
VENDOR
DEVELOPMENT
Vendor registration / Parts as per BOM ¤ Project under taken Plan Vs Timely completed
¤ Stores ¤ Capability Proveout Data (Cpk / Ppk)
Issues of Material ¤ No. of mistake proofing Plan Vs Implemented
ENGINEE
¤ Mainteneance R
¤ No. of ECN received Vs Timely implementation
Master List of Machines / Machine Installation , Machining Capability ¤ No. of RFQ received Vs Timely Completion
¤ Quality & Lab
Test as per control plan/ Inspection Standard Project Group Leader- 1 Project Group Leader-2
Lab Test Schedules (NPD,RFQ & ECN) (NPD,RFQ & ECN) EFFICIENCY
Performance / Layout reports / MSA ¤ Continuous improvement Projects
Master List of IMTE / Calibration record
Lab Matrix PROJECT PROJECT
LEADER LEADER
¤ PPC
Daily Production Plan as per customer requirement / Capacity utilization
¤ Human Resources
ENGINEER ENGINEER
Training / Motivational schemes / Competency / OJT
Govt. / Legal regulation
¤ Manufacturing Process
ASSOCIATES ASSOCIATES
Similar Line OEE / Rejection PPM / Rework PPm / Poke Yoke
¤ Tool Room
Tool Maintenance / Master List
2 19.10.2011 Reviewed & revised
Prepared By
1 01.07.2011 Reviewed & revised
0 25.06.2003 Initial Checked by
Sl.No Rev.No / Rev. date Revision Details Remarks Approved By
Turtle Diagram Vendor Development
PROCEDURES PERFORMANCE
►CAPITAL PROCUREMENT
Department Objectives
►LEAN MANUFACTURING
Feasibility APQP Timing plan & Activities PILOT LOT SPC STUDY
study
Submit to SOP
customer
Key Customer and Products (Domestic)
Differential Case,Fly Wheel Assy Rotor Oil Filter,Front &Rear Panel, Alloy Wheel,Crank Case,Front Panel
Forks,Steering Knuckle, Crank Case,Clutch Assy,Grip Rear Panel,Grip
Brake DiscCover Cylinder Head,
Engine Brackets,Case oil Pump Assy.
Brake Drum,Oil Pan. Cap MainBearing,Head Lube Oil Filter
Cylinder Block,Cylinder Head,
Connection Water Inlet,Head Fuel Filter
Bed Plate,Cover Cyl Head
Connection Water Out Let
FiamMinda Housing Thermostat,Cover intake
Connection Water Out let
Jerico Body, Housing Regulator mnfoldCover Rear,Housing Gear.
Plate EGR,ACG Braket
Stay Front,Cover Cam Thrust FCC RICO(JV)
Differential Case Support ASM FRNT DIFF Trsfr DRV(6F) Bracket alternator
Plate Adaptor Bracket Fly wheel Sensor
Stay Front,Support Bracket
Oil Filter Head,Timing Gear Case
Base as fuel filter Pipe Intake,Pipe angle
Manifold,Container cat
Manifold,Housing regulator Base as fuel Head
Housing Pump,Housing RR Axle.
Cover side,Base rocker arm