Manufacturing Engineering Department


Doc.Number RICO 14 DOC 03
RICO TURTLE DIAGRAM - PROJECT MANAGEMENT (NEW PRODUCT DEVELOPMENT) Rev.No. 2
Rev. Date 19.10.11
SKILLS
Management Skill Technical Skill PROCESS CONTROL PROCEDURE WORK INSTRUCTION/ STANDARDS
¤ Leadership Skill ¤ Product & Process Knowledge PROCESS : PRODUCT DESIGN & DEVELOPMENT ¤ Procedure - - Customer Specific Standard
¤ Communication Skill ¤ Knowledge of relevant standards PROCESS OWNER : HEAD - DEVELOPMENT ¤ RICO18 QSP 01 (APQP / Product Realization / Proj. Mgmt.)

¤ Change management Skill PROCESS Name : Project Management ¤ RICO12 QSP 03 (Process for PPAP) TS Standards
¤ Knowledge of Core Tools (New Product Development) ¤ RICO 12 QSP 02 (Process for Process FMEA) TS 16949:2009
¤ Engineering design Skill ¤ RICO 12 QSP 01( Procedure for control plan)

¤ Costing Skill ¤ RICO 12 QSP 04( Procedure for Process Flow Diagram) EMS / OHSAS Standards
¤ Project Management Skill ISO 14001:2004 / OHSAS 18001:2007

INPUT Product Desgin &


VARIABLE INPUT COMMON INPUT Development OUTPUT
Plan & Define

¤ QEHS Policy - On time Development of Part as per Customer Requirement

¤ Engineering Drawings & Standards


¤ Business Plan -On time Completion of RFQ as per Marketing Requirement
¤ Customer Target Dates ¤ Objectives

ECN Management

Process Design &


Customer specific requirements including
¤ -On time Implementation of ECN as per Customer Requirement

Development
Government regulatory requirement Timely Implementation of ECN
¤ AIAG Manual On Time Development of Part PROJECT MANAGEMENT
¤ Special Product characteristics
(NEW PRODUCT DEVELOPMENT)
¤ TGW / TGR Reports / PFMEA

¤ Targets for Productivity , Process capability, Cost

¤ Packing Standards / Norms


¤ Customer complaints / Feed back
¤ Bill of Material Quality rating
¤ APQP Timing Chart Warranty rating Feedback & Submission
PPAP Submission
Lot Rejection PPM / Line Rejection PPM

Plant Head
PROCESS OBJECTIVES
PROCESS INTERFACE
¤ Marketing EFFECTIVENESS
Customer Drawings / Customer Specific requirements / Kick-off Dates
¤ Purchase TOOL ROOM
VENDOR
DEVELOPMENT
Vendor registration / Parts as per BOM ¤ Project under taken Plan Vs Timely completed
¤ Stores ¤ Capability Proveout Data (Cpk / Ppk)
Issues of Material ¤ No. of mistake proofing Plan Vs Implemented
ENGINEE
¤ Mainteneance R
¤ No. of ECN received Vs Timely implementation
Master List of Machines / Machine Installation , Machining Capability ¤ No. of RFQ received Vs Timely Completion
¤ Quality & Lab
Test as per control plan/ Inspection Standard Project Group Leader- 1 Project Group Leader-2
Lab Test Schedules (NPD,RFQ & ECN) (NPD,RFQ & ECN) EFFICIENCY
Performance / Layout reports / MSA ¤ Continuous improvement Projects
Master List of IMTE / Calibration record
Lab Matrix PROJECT PROJECT
LEADER LEADER
¤ PPC
Daily Production Plan as per customer requirement / Capacity utilization
¤ Human Resources
ENGINEER ENGINEER
Training / Motivational schemes / Competency / OJT
Govt. / Legal regulation

¤ Manufacturing Process
ASSOCIATES ASSOCIATES
Similar Line OEE / Rejection PPM / Rework PPm / Poke Yoke

¤ Tool Room
Tool Maintenance / Master List
2 19.10.2011 Reviewed & revised
Prepared By
1 01.07.2011 Reviewed & revised
0 25.06.2003 Initial Checked by
Sl.No Rev.No / Rev. date Revision Details Remarks Approved By
Turtle Diagram Vendor Development

INTERFACE COMPETENCE AND SKILL

- QUALITY ASSURANCE DEPTT. - MANAGERIAL SKILL


- STORES - COMMUNICATION SKILLS
- ACCOUNTS DEPTT. - PROCESS KNOWLEDGE
- PRODUCTION, PLANNING & CONTROL - DECISION MAKING
- TRAINING - SUPPLIER DEVELOPMENT SKILL
- MARKETING DEPTT.
- ENGINEERING DEPTT.

SUPPLIER SELECTION CRITERIA

PART / SUPPLIER DEVELOPMENT


PLAN TO MEET CUSTOMER
REQUIREMENT
SUPPLIER DEVELOPMENT &
UPGRADATION TO REQUIRED TIMELY DEVELOPMENT OF PART / MATERIAL
CUSTOMER APPROVED SOURCES CONFORMING TO CUSTOMER SPECIFIED
INTERNATIONAL STANDARDS
REQUIREMENT, USER SPECIFICATION, AT
SUPPLIER DEVELOPMENT PLAN AS PER CUSTOMER OPTIMUM COST
REQUIREMENT
EHS SPECIFIC REQUIREMENT

PROCEDURES PERFORMANCE

RICO 08 QSP 01 / QSP/RICO GGN/ 06.1 PROCEDURE FOR PURCHASING EFFECTIVENESS


RICO 08 QSP 02 / QSP/RICO GGN/ 06.2 PROCEDURE FOR ASSESSMENT & SELECTION OF SUPPLIER (1) PART DEVELOPMENT COST PLANNED V/S ACTUAL
RICO 08 QSP 03 / QSP/RICO GGN/ 06.2 PROCEDURE FOR SUPPLIER DEVELOPMENT (2) PART DEVELOPMENT TIME PLANNED V/S ACTUAL
RICO 06 QSP 09 / QSP/RICO GGN/ 16.1 PROCEDURE FOR QUALITY / EHS RECORDS (3) NO OF PARTS DEVELOPED MONTHLY
RICO 02 QSP 04 PROCEDURE FOR RESOURCE MANAGEMENT (4) FAILURE IN PART SUBMISSION TO CUSTOMER DUE
RICO 18 QSP 01 PROCEDURE FOR PRODUCT REALIZATION PART NOT DEVELOPED ON TIME
EFFICIENCY
(1) PART DEVELOPED EFFECTIVELY INTERMS OF COST,
TIME & REQUIREMENT

PROCESS OWNER : VENDOR DEVELOPMENT HEAD


Department Functions

►REQUEST FOR QUOTATION

►TECHNICAL REVIEW WITH CUSTOMER

►NEW PRODUCT DEVELOPMENT

►APQP ACTIVITIES & DOCUMENTS

►PPAP ACTIVITIES & DOCUMENTS

►ENGINEERING CHANGE MANAGEMENT

►DESIGN OF FIXTURES,SPL TOOLS AND SPL GAUGES.

►MANUFACTURING OF FIXTURES & GAUGES.

►VENDOR DEVELOPMENT FOR BOP & CASTINGS

►CAPITAL PROCUREMENT
Department Objectives

►MEET CUSTOMER REQUIREMENTS

►REDUCE LEAD TIME FOR NEW PRODUCT DEVELOPMENTS

►LEAN MANUFACTURING

►ELIMINATE MANUAL OPERATIONS

►REDUCE CYCLE TIME

►REDUCE CONSUMABLE TOOL COST

►IMPLEMENT POKA YOKE.


Schematic of Process flow

Marketing submit to Customer Negotiation/Tech.Review OK.

Received dwg Cost Estimation Vendor Not OK. Tech.Reveiw


Development APQP Issues

Feasible BOP Parts Dwg Freeze L.O.I/P.O.Release

Feasibility APQP Timing plan & Activities PILOT LOT SPC STUDY
study

Not feasible Sample Dev Customer Feed Mark PPAP

Submit to SOP
customer
Key Customer and Products (Domestic)

Differential Case,Fly Wheel Assy Rotor Oil Filter,Front &Rear Panel, Alloy Wheel,Crank Case,Front Panel
Forks,Steering Knuckle, Crank Case,Clutch Assy,Grip Rear Panel,Grip
Brake DiscCover Cylinder Head,
Engine Brackets,Case oil Pump Assy.
Brake Drum,Oil Pan. Cap MainBearing,Head Lube Oil Filter
Cylinder Block,Cylinder Head,
Connection Water Inlet,Head Fuel Filter
Bed Plate,Cover Cyl Head
Connection Water Out Let
FiamMinda Housing Thermostat,Cover intake
Connection Water Out let
Jerico Body, Housing Regulator mnfoldCover Rear,Housing Gear.
Plate EGR,ACG Braket
Stay Front,Cover Cam Thrust FCC RICO(JV)

Face Movable Drive,Face Fix Drive


Turbine Housing, Center Housing
Bracket Rad Lwr Pressure Plste,Outer Clutch
Engine Bracket Center Clutch
Brace Transmission
Bracket Alternator FORKS
Water Pump(Casting)
Balance shaft,Bracket comp p/s pump

Tandum Master Cylinder (Casting)


Brake Drum, Brake Disc
Key Customer and Products (Export)

Differential Case Support ASM FRNT DIFF Trsfr DRV(6F) Bracket alternator
Plate Adaptor Bracket Fly wheel Sensor
Stay Front,Support Bracket
Oil Filter Head,Timing Gear Case
Base as fuel filter Pipe Intake,Pipe angle
Manifold,Container cat
Manifold,Housing regulator Base as fuel Head
Housing Pump,Housing RR Axle.
Cover side,Base rocker arm

Cap Main Bearing,Exhaust Manifold


Support Seal RING,Housing Pump Pressure plate,Intermediate Plate
Retainer bearing bracket
Engine support brACKET Rear case,Front Case.
Piston bearing break

Housing Connection water Inlet


Bearing Caps
Connection water outlet

Turbine Housing,Center Housing Support Alternator


Housing thermostat
Connection Fuel Block