Вы находитесь на странице: 1из 6

INDRAPRASTHA GAS LIMITED PTS-FILTER ELEMENT IGL/ FE /PTS / 2020

INDRAPRASTHA GAS LIMITED CITY GAS

DISTRIBUTION PROJECT IN NCT OF DELHI & NCR

PTS- FILTER ELEMENT

Page 1 of 5
INDRAPRASTHA GAS LIMITED PTS-FILTER ELEMENT IGL/ FE /PTS / 2020

1.0 INTENT OF SPECIFICATION ............................................................................................................................... 3


2.0 SCOPE OF WORK .................................................................................................................................................. 3
3.0 DEFINITIONS ........................................................................................................................................................ 3
4.0 MATERIAL SPECIFICATION FOR FILTER ELEMENT…………………….……………………………………….3

5.0 INSPECTION……………………………………………………………………………………………………………………….….. 3
6.0. DOCUMENTS TO BE SUBMITTED……………………………………………………………………………………………….4

ANNEXURE - I ………………………………………………………………………………………………….5

Page 2 of 5
INDRAPRASTHA GAS LIMITED PTS-FILTER ELEMENT IGL/ FE /PTS / 2020

1.0 INTENT OF SPECIFICATION

The intent of this specification is to establish minimum requirements to manufacture and


supply of Gaskets used for flanges in supply of natural gas.

2.0 SCOPE OF WORK

2.1 The scope includes manufacture, supply, inspection, testing, marking, packaging, handling
and despatch of Filter Element, as indicated in the Material Requisition & Schedule of Rates,
meeting all the requirements as laid down in manufacturing standards.

2.2 All codes and standard for manufacture, testing, inspection etc. shall be of latest edition.

2.3 Owner/ Owner’s Representative reserves the right to delete or order additional quantities
during execution of order, based on unit rates and other terms & conditions in the original
order

2.4 The dimensions mentioned in the Drawings are indicative. The successful bidder has to
ensure and confirm the dimensions and the material for the particular type of filter after
visiting the site. The samples has to approved by the TPI/EIC before supplying the entire lot.

3.0 DEFINITIONS

OWNER Shall mean Indraprastha Gas Limited (IGL)


Manufacturer Means Manufacturer of the Gaskets
PTS Particular Technical Specifications
Third Party Inspection Agency Means the Inspection Agency to be appointed by IGL

4.0 MATERIAL SPECIFICATION FOR FILTER ELEMENT

As given in Annexure 1

5.0 INSPECTION

SUPPLIER shall submit ITP to CLIENT/CLIENT’s representative for approval and also provide
required certification as mentioned in MR.

Inspection shall be carried out as per Technical Specifications and approved Inspection Test
Plan.

SUPPLIER shall furnish all the material test certificates, proof of approval/license from
specified authority as per specified standard, at the time of final inspection of each supply lot of
material. Also, all above mentioned certificates to be furnished in soft copy to M/s IGL.

Even after third party inspection, owner reserves the right to select a sample randomly from
each manufacturing batch and have these independently tested .should the results of these
tests fall outside the limits specified in IGL technical specifications, then IGL reserves the right
to reject all production supplied from the batch.

5.1.1. Packaging

Package size to be mentioned to ensure uniformity in delivery conditions of the material being
procured. Package size shall be approved by owner / owner’s representative before despatching
the material. Bidder shall submit the packaging details during offer and also complied with at the
time of delivery

Page 3 of 5
INDRAPRASTHA GAS LIMITED PTS-FILTER ELEMENT IGL/ FE /PTS / 2020

6.0. Documents to Be Submitted At the Time of Bidding

The bidder shall submit following documents

Manufacturing Standards

Catalogues in English

Approval of statutory bodies,

Types of test Reports

Deviation from technical standards, if any, with justification

Supplies against major orders for Natural gas applications

Sizing calculations

6.1.0 Documents to Be Submitted Along With Dispatch Of Material

The bidder shall submit following documents along with material

All relevant Material test certificates

Test reports

Catalogue and technical literature in English

Operational/Installation Manual

Dimensional and sectional drawings with material of construction

Page 4 of 5
INDRAPRASTHA GAS LIMITED PTS-FILTER ELEMENT IGL/ FE /PTS / 2020

ANNEXURE-I

S.NO DESCRIPTION DATA SHEET


1.00 PROCESS DATA
1.01 Fluid Natural gas
1.02 Corrosive/Toxic Component(CO2) 3.88%
2.00 Operating condition
2.01 Pressure 17-32 Bar
0
2.02 Temperature ( C) 0-50
3.00 Design condition
3.01 Pressure 48 Bar
0
3.02 Temperature ( C) 0-60
4.00 FILTER DATA
4.01 Size As per M.R.
4.02 Type CARTRIDGE TYPE (Vertical/Horizontal),Mesh Size=2/5 Micron
(as per Drawing and MR)
4.03 Particle/Mesh Size 2 Micron/5 Micron (as per Drawing and MR)
4.04 Pressure drop 0.2 Bar
4.05 Filtration Efficiency 98%
4.06 Filter Element material As mentioned in Drawings
4.07 Dimensions As per Drawings and MR

Page 5 of 5