S L RR Category S L RR Category
Follow designated pathway and road
safety protocols/traffic management
plan of the project
Ensure deployment of flagman, area
barricades & reverse alarms
Follow the road speed
Slow speed near passing pedestrians.
Untrained
No overtaking of two vehicles.
driver
Apply no mobile phone policy
Usage of
Ensure the maintenance record of the
phone
Vehicle collision, vehicle and FIT
Lack of
Material Personal injuries Try to avoid manual lift where
flagmen 4 3 12 H Logistic & HSE 4 1 4 L
Transportation Property or mechanical lifting is possible if not
Area
structure damages then Ensure safe method for MH.
restrictions
Ensure trained riggers if unloading via
Vehicle Poor
crane, including the operator & crane
maintenance
3rd party certifications.
Loading/
Ensure area barricades with required
unloading
signage
Ensure trained individuals equipped
with mandatory PPEs
Ensure road closure and other
applicable permits followed by closed
monitoring by direct supervisor.
S L RR Category S L RR Category
Follow designated pathway and road
safety protocols/traffic management
plan of the project
Ensure deployment of flagman, area
barricades & reverse alarms
Follow the road speed
Slow speed near passing pedestrians.
Untrained
No overtaking of two vehicles.
driver
Apply no mobile phone policy
Usage of
Ensure the maintenance record of the
phone
Vehicle collision, vehicle and FIT
Lack of
Material Personal injuries Try to avoid manual lift where
flagmen 4 3 12 H Logistic & HSE 4 1 4 L
Transportation Property or mechanical lifting is possible if not
Area
structure damages then Ensure safe method for MH.
restrictions
Ensure trained riggers if unloading via
Vehicle Poor
crane, including the operator & crane
maintenance
3rd party certifications.
Loading/
Ensure area barricades with required
unloading
signage
Ensure trained individuals equipped
with mandatory PPEs
Ensure road closure and other
applicable permits followed by closed
monitoring by direct supervisor.
S L RR Category S L RR Category
Follow designated pathway and road
safety protocols/traffic management
plan of the project
Ensure deployment of flagman, area
barricades & reverse alarms
Follow the road speed
Slow speed near passing pedestrians.
Untrained
No overtaking of two vehicles.
driver
Apply no mobile phone policy
Usage of
Ensure the maintenance record of the
phone
Vehicle collision, vehicle and FIT
Lack of
Material Personal injuries Try to avoid manual lift where
flagmen 4 3 12 H Logistic & HSE 4 1 4 L
Transportation Property or mechanical lifting is possible if not
Area
structure damages then Ensure safe method for MH.
restrictions
Ensure trained riggers if unloading via
Vehicle Poor
crane, including the operator & crane
maintenance
3rd party certifications.
Loading/
Ensure area barricades with required
unloading
signage
Ensure trained individuals equipped
with mandatory PPEs
Ensure road closure and other
applicable permits followed by closed
monitoring by direct supervisor.
Likelihood of Risk
Severity of Risk