Академический Документы
Профессиональный Документы
Культура Документы
1
PT. BERKAT MULIA WIRATAMA is a Indonesian based
company incorporated in year 2006. It is today Palm Oil
Mill engineering Contractor Company specializing in
fabrication, erection for all mechanical and electrical
works for palm oil mill. We install new unit, repair and
servicing all equipments for palm oil mill in our joint
operation workshop at Tanjung Mulia - Medan, our
founder had been in palm oil mill industry since 1985.
Our concepts are ENVIRONMENT FRIENDLY, we had
completed design and build in process new palm oil mill
30-45 t/h and specialized in ENERGY STATION with
Boiler Control System for SCADA automation, efficient
use of steam with VERTICAL or HORIZONTAL
STERLIZER.
We have good supported by local team comprising of
engineering professionals with a combined experience
involving in the project & design in Indonesia, Malaysia
and China.
We have demonstrated our understanding of the demands
of the engineering business. Our track record has proven
our ability for engineering excellence, completion on time,
strict cost control and good project management.
We bring real solutions to real problems for your business
and engineering success. Start today, you can count on
PT BERKAT MULIA WIRATAMA
2
Company Name : PT. BERKAT MULIA WIRATAMA
Business Reg. :
SIUP No. : 0311/0008/1.1/0501/01/2013
TDP No. : 02.12.51.10027/1229/1147/03/2012
SIUJK No. : 1.136593.1275.2.03961/K/PR/
0577/0610/0607/2012
SITU : 0330/0331/0009/2.1/0501/01/2013
NPWP : 02.501.945.6.113-000
PKP : PEM-062/PK/WP3.01/KP.0503/2007
3
4
work experiences
Additional Smart Fiber Hopper System di PKS Belian –
1 Kalimantan Barat.
2 Elevated Water Tank & Hydrant System di Badau Bulking
Pemasangan 1 unit Steam Turbine di PKS Selapan
3 Jaya, Kertamukti,
Mesuji Raya, Ogan Komering Ilir, Sumatera Selatan”
Pemasangan 1 Unit Digester, 1 Unit Screw Press dan 1 unit
4 Steam Turbine
di PKS Sungai Rangit, Kecamatan / Kabupaten Sukamara,
Kalimantan Tengah”
Mechanical & civil PKS Sungai Tawang 50/100 TPH -
5 Kalimantan Barat
6 Pembangunan PKS PT HAL di Jambi
Fabrication & erection steel structure MS tank dan SS tank
7 kap 3500 m3 di Kabil Nongsa Batam
Work experiences
5
Design and Fabricate by our engineering
team for Palm Oil Mill’s Structure, from :
Loading Ramp - Fruit Cages - Conveyor of
FFB, Cake, Nut and Silo - Sterilizer
(Horizontal, Vertical) - Back Pressure Vessel
– Thresser - Oil Tank, Hopper & Silo -
Polishing Drum - Fiber Cyclone - Piping
6
We are marketing for local assembly with standard
ASME of biomass boiler with competitive and faster
delivery time
7
Vertical sterilizer is a new cutting-edge milling technology
developed by our principle and manufactured in INDONESIA
to fulfill the need of the palm oil industry to stay competitive by
maximizing palm products extraction at a reduced cost and at
the same time meet the requirements of HACCP, GMP and
specific Principals and Criteria of RSPO/ISPO.
Vertical Sterilization System completely does away with the
marshalling yard for rail tracks, sterilizer cages, tippers,
capstans, bollards, overhead lifting cranes and much other
associated equipments. Fresh fruit bunches (FFB) are now
delivered directly from the reception ramp by a conveyor system
to the sterilizers. The conveyor system has a special contraption
added to separate sand and other foreign particles from the FFB.
Due to the new system's simplicity and the integration of
automation system, this process is now virtually a one-man
operation. As a basic concept of COMPACT DESIGN OF POM.
8
China’s manufactured with
INTERNATIONAL STANDARD gearbox
& motors
9
China’s manufactured with
INTERNATIONAL STANDARD gearbox
& motors
10
Conveyor chains
11
Hydraulic systems
1
2
We can repair,
service and
modification
with local
standard quality
material.
Supply press
cage, worm
screw , expeller
arm and blade
13
Empty fruit brunch are waste in
palm oil mill which recently used
as raw material for feed boiler ,
commercial briquette , fiber and
organic composting . Require
standard process or station for
EFB processing system until dry
(20% moisture)
Application equipment :
1. Shredder
2. Heavy Duty Press
3. Splitter (Vertical Sterilizer)
4. Bunch Crusher
5. Heavy Duty Shredder (2015
design)
14
Non-oily cake from the decanter is one
of the by-products obtained from the
processing of FFB to produce crude
palm oil (CPO). It is estimated that
about 0.4% of decanter cake could be
produced for every tone FFB processed.
Therefore, from a 90 t/hr mill, 160-
200 tons of decanter cake can be
produced every month.Decanter cake
obtains certain amount of nutrient and
the boiler ash containing high %
potassium. These products can be mixed
with inorganic fertilizer to enrich
the nutrient content of the palm based
bio-compound fertilizer
15
We are looking for potencial area to build palm oil
mill capacity 30-45 ton/hour, cooperation with
palm plantation (small holders) or KOPERASI
which can supply 700 ton/day in area of
Kalimantan.
16
CPO > Refined Palm Oil
The names physical and chemical refining come from the process
technology used to remove the Free Fatty Acids (FFA) that are
responsible for the oil acidity. Physical refining is a process
making use of the lower boiling point of the FFA compared to
the boiling point of the triglyceride oil. In chemical or alkaline
refining, an alkali is used to neutralize the FFA.
17
In the process of treating waste,
especially high-strength
wastewater, one efficient method is
to adopt anaerobic process which
produces Biogas as a by-product.
Biogas contains around 65% of
methane, which can be burnt to
produce electrical power or steam.
18
Work of scope :
- Project evaluation, feasible
study, options review, project
planning,
1. - Tender assessment, due
diligence investigation,
2. - Concept and detailed process
3. - Design
4. - Earthworks design
.
5. - Mechanical engineering
design
6. - Process control and
automation
7. - Project management and
procurement
8. - Construction management,
site supervision, and
monitoring
9. - Commisioning
10. - Operation support and
monitoring
19
Our principal have been involved in SE Asian biogas
projects for last 10 years, in various capacities.
Projects include starch waste, distillery waste and
animal waste as well as palm oil mill effluent, which is
currently the major focus.
Update 2013
POM projects : 18 in operation (incl : Musim Mas in Indonesia
Univanich in Thailand), 6 under construction
EFB Press Liquor : 1 in operation
Starch Plant : 10 in operation, 2 currently under construction
Molasses Distillery, Feed lot, Piggery Waste H2S Scrubbers,
Tank and horizontal configurations : 12 in operation.
20
PT. BERKAT MULIA WIRATAMA
Workshop :
Jl. Aluminium Raya No.2 Tanjung Mulia - Medan
Phone / Fax : 061-4579943
Email : info@ptbmw-id.com
Mobile : 62-878-6976-6788
21