Академический Документы
Профессиональный Документы
Культура Документы
Q1. The production volume of a product line is the ________________ of the production quantities
of different stations in the product line.
Q2. _____ is the application of a set of techniques to an existing product with a view to improving its
value.
(a) Value analysis (b) Value engineering (c) Value stream mapping (d) Value optimization
Q4. In which of the following methods, the time durations of the activities are deterministic?
a. Time, Tasks b. Tasks, Criticality index c. Tasks, Minimum time d. Tasks, Time
Q7.
Q8. Who among the following is one of the originators of the Total Quality Management approach?
Q10. What is the time required to finish the task using Critical Path Method?
(The numbers present above the boxes represent time required to complete that activity)
a. 12 b. 9 c. 14 d. 19
Q11. Product line manufacturing phones has 5 stations in series. Actual output of the line is 500 per
shift.
Station no. 1 2 3 4 5
Individual 600 650 650 550 600
capacity/shift
Q12. Which of the following method of forecasting is used for subjective nature of demand values?
Q13. Which analysis is based on the frequency of use of the items in the stores?
Q14. EOQ corresponds to the _________________ point on the total cost curve.
Q16. In ABC analysis, finally the items are to be sorted according to the _________________ order
of their consumption values before obtaining the cumulative consumption values.
(a) Minimum inventory level – Current stock level (b) Maximum inventory level + Current stock level
(c) Maximum inventory level – Current stock level (d) Minimum Inventory level + Current stock level
Q19. Which of the following SAP TCodes is used for checking the stocks of materials in plant?
Q20 Identify this tool which is used for identifying the causes of the defects in a production plant.