Вы находитесь на странице: 1из 9

7.

Level 2 Repair

7-1. Disassembly

1) Displace the temperature chamber 1) Unscrew 16 points and disassemble


1 2
of 80℃ for 10 minute RF cap
2) Detach the OCTA using Vaccum jig

Disassemble RF cap

※ Caution
1) Displace the temperature chamber of 80℃ ※ Caution
for 10 minute 1) Be careful of scratch.
2) Detach the OCTA using Vaccum jig

3 1) Disassemble from side hook. 4 1) Disassemble inner hook of REAR.

※ Caution
1) Disassemble rear case pushing BRAKCET ※ Caution
to outside 1) Be careful of scratch.
2) Be careful of bonding of SUS PLATE

7-1
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

5 1) Unscrew 1 point 6 1) Disassemble 3 connectors and 2


coaxial cables.

※ Caution
※ Caution 1) Be careful of damage to the connectors and
1) Be careful of scratch
coaxial cables.

7 1) Seperate MAIN PBA, BRACKET. 8 1) Disassemble rest electronic material.

Disassemble
connector first

※ Caution
※ Caution 1) Be careful of scratch
1) Be careful of scratch 2) Be careful of connector damage and FPCB
damage

7-2
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

9 1) HOME KEY Disassemble 10 1) SUB PBA Disassemble

2.Disassemble touch key

1.unscrew 1 point
3.Detach FPCB

4.Disassemble (Be careful


not to damage it)

※ Caution ※ Caution
1) Be careful of connector damage and FPCB 1) Be careful of connector damage and FPCB
damage damage

11 1) Disassemble SIDE contact FPCB 5


12 1) Volume key FPCB disassemble
point

2.disassemble hook

3.disassemble FPCB
from bracket

1.disassemble volume
key first

※ Caution ※ Caution
1) Be careful of connector and FPCB damage 1) Be careful of connector and FPCB damage

7-3
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

13 1) disassemble motor

3.disassemble from bracket 2.disassemble hook

1.disassemble motor FPCB first

※ Caution
1) Be careful of connector and FPCB damage

7-4
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

7-2. Assembly

1 1) MOT FPCB assemble 2 1) volume key FPCB assemble

2.attach FPCB following


1.attach motor following guide home
2.insert FPCB through hole
guide hook.
1.attach volume key
following guide hook.

3.attach FPCB following


guide line

3. attach FPCB following guide line

※ Caution ※ Caution
1) Be careful of FPCB tilt 1) Be careful of FPCB tilt

3 1) SIDE contact FPCB assembly 4 1) IF PBA assembly

Assemble blue RF
cable and assemble
into the clip
press FPCB
to attach

Assemble white
RF cable

attach following guide rib

attach KEY FPCB


following guide rib

※ Caution
※ Caution 1) Be careful of TOUCH KEY LED damage
1) Be careful of reverse assembly
2) Be careful of TOUCH KEY LED damage

7-5
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

5 1) Assemble RF cable 6 1) Screw 1 points

※ Caution ※ Caution
1) Be careful not to be lifted up of FPCB 1) Check if screw is fully assembled.

7 1) OCTA TAPE attach 8 1) OCTA press

※ Caution
※ Caution - press power : 5 ~ 6 kgf/cm2
1) Be careful of FPCB tilt - press time : 4.7 sec
- be careful of damage

7-6
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

9 1) OCTA CONN PORON attach 10 1) DIGITIZER attach

OK NG
Check OCTA poron's TILT

※ Caution ※ Caution
1) Be careful of FPCB tilt 1) Be careful of FPCB tilt

11 1) SENSOR BRACKET assemble 12 1) Assemble camera


2) SENSOR assemble 2) SIM/SD socket FPCB assemble

assemble hook
PUT following rib
and guide hole
assemble hook assemble connector
PUT following rib and guide hole
Be careful of
damage of pin

assemble module

Attach FPCB following


guide hook
assemble connector
assemble connector

※ Caution ※ Caution
1) Be careful of connector pin damage 1) Be careful of FPCB tilt

7-7
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

13 1) HRM sensor rubber assembly 14 1) PBA assemble


2) Assemble receiver connector

assemble home key


assemble receiver connector
connector

assemble receiver
and attach it

assemble sub pba


insert sub-cam connector
through bracket
assemble HRM sensor hole
rubber

※ Caution
※ Caution
1) Be careful of connector damage and FPCB
1) Be careful of connector damage and FPCB
damage.
damage.
2) Be careful of scratch

15 1) Assemble RF cable
2) PBA SCREW 1 point

there should be no
lift up of cable
screw 1 point
white cable should be
inner side of PCB

cable coming up
white cable is overlapped on cable is outter side of PCB. it will
blue cable be overlapped on spk module too.

※ Caution
1) Be careful of
- cable coming up
- cable is lifted

7-8
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Level 2 Repair

16 1) REAR SCREW 16 points 17 1) OCTA assemble

※ Caution ※ Caution
1) Be careful of scratch 1) Check if connector is fully assembled or not

18 1) OCTA press

※ Caution
- press power : 5 ~ 6 kgf/cm2
- press time : 11.7 sec
- be careful not to damage

7-9
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.

Вам также может понравиться