Вы находитесь на странице: 1из 2

Difficulties in Drinking Water Electric Power Services FACULTY OF ENGINEERING

and Drainage in Peru The electric sector in Peru. Access to PROFESSIONAL SCHOOL OF
electricity has grown from 45% in CIVIL ENGINEERING
1990 to 88.8% in June 2011, while TRAINING COURSES:
 Poor quality of service
improving the quality and efficiency
delivery that puts the health of the provision of the service. “INGLES”
of the population at risk. However, there are still many THEME:
challenges ahead. “Right to Enjoy Basic Services of
Drinking Water, Electric Light and
Drainage”
STUDENT:
Carrera Ponte Yhon Walter
TEACHER:
Juan Carlos Ausejo Manco
YEAR:
2017

• Rates that do not allow to cover


the costs of investment, operation
INTRODUCTION
and maintenance of the services.
With the Present Triptych, we intend
to inform about our Right to Enjoy the
Basic Services of Drinking Water,
Electric Light and Drainage, and to
Potable Water and Drainage
inform the progress of these services in
Services in Peru
Peru.
Significant progress has been made,
In addition, see the difficulties that the
such as the increase in access to
government has for the proper
 sewage system. potable water from 30% to 62%
distribution of these services.
between 1980 and 2004 and the

 The public lighting system.

increase in access to sanitation from


9% to 30% between 1985 and 2004 in
rural areas.

Right to Enjoy Basic Services


 The drinking water supply
system.

Вам также может понравиться