Академический Документы
Профессиональный Документы
Культура Документы
PROGRAM OF WORK
Item I.D. Item Description % of Total Unit Quantity Total Cost Remarks
1.0 Masonry Works / Carpentry Works 100.00% 1 lot 20,000.40 New Construction
I. a. MATERIALS 14,286.00
I. b. LABOR (40% of the Materials) 5,714.40
II. CONTINGENCIES 0.00
TOTAL
III. TOTAL CONSTRUCTION COST ( I.a + I.b +II ) 20,000.40
I. a. MATERIALS 14,286.00
I. b. LABOR (40% of the Materials) 5,714.40
II. TOTAL CONSTRUCTION COST ( I.a + I.b ) 20,000.40
2 of 5
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF EDUCATION
Division of Surigao del Sur
PROGRAM OF WORKS
(Fund Source)-(Region)-(Division)-(No.)
School: Date:
Budget Allocation:
Region: Estimated Government Expenses:
Division: Approved Budget for Contract:
Project Title: Completion Period:
Minimum Required Manpower:
Project Engineer Mason Painter Plumber
Const. Foreman Steelman Tinsmithry Electrician
Leadman Carpenter Laborer Equipment Operator
Plan: Minimum Required Equipment:
Location: Crane Transit Mixer Welding Machine Plate Compactor
Diesel Hammer Bar Cutter Hand Tools Concrete Vibrator
Item I.D. Item Description % of Total Unit Quantity Total Cost Remarks
I. DIRECT COST
GENERAL REQUIREMENTS
1 #REF!
2 #REF!
3 #REF!
4 #REF!
5 #REF!
6 #REF!
7 #REF!
8 #REF!
9 #REF!
10 #REF!
11 #REF!
12 #REF!
13 #REF!
14 #REF!
Sub-Total
II. INDIRECT COST 17% / 22% of (I)
Overhead Expenses (5%)
Contingencies (3%)
Miscellaneous (1%)
Contractor's Profit (8% / 10%)
Sub-Total
III. TAX 5% of (I+II)
Sub-Total
PROGRAM OF WORK
JOCELYN NARISMA
BOD Secretary
Approved by:
EDMOND R. JUMALON
GPTA President