Date : 20-Nov-18

Shree Cement Ltd. (BGU, AUrangabad)

Department : Technical

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

1 Cement Mill Section 414 401 427.5 Deptwise shortfall is given in breakwup.

1.1 BCP 311 297 319

1.2 NBCP 103 104 108.5

2 Packing Plant 66 65 66

2.1 BCP 40 39 40

2.2 NBCP 26 26 26

3 Utility 28 25 28

3.1 BCP 18 17 18

3.2 NBCP 10 8 10

Some manpower are approved for 12 hrs therefore sanction is


Total (S. No. 1 to 3) 508 491 521.5
less than required.

ADDITIONAL REQUIREMENT

4 Additional 8

Total 8 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 522 18.25 9517 9517

2 4 National Holiday in a year 522 4 2086 2086

3 Breakdown/Shutdown/Schedual Maintenance 6415 0 0

4 Adhoc Labour 6157 0 0

Total OT Duty per annum (mandays) 11603


Total Normal Duty in a year (mandays) 191315
% OT Duty in a year (mandays) 6.07

Future requirements are not included in Normal duty hours.


Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : Mechanical

Sectionwise Contractual Manpower optimisation Details

Sanctioned Existing Required


Sl. No. Section Working Details
Manpower Manpower Manpower

1 Material Handling 98 94 98 Four man power short. 8 hrs duty with off considered.

1.1 BCP _ O&M 53 49 53

1.2 NBCP_O&M 32 32 32

1.3 Cleaning 13 13 13

2 Cement mill 120 118 120 Two man power short. 8 hrs duty with off considered.

2.1 BCP _ O&M 83 81 83

2.2 NBCP_O&M 20 20 20

2.3 Cleaning 17 17 17

3 Packing Plant 20 20 20 8 hrs duty with off considered.

3.1 BCP 16 16 16

3.2 NBCP 4 4 4

4 Utility 28 25 28 Three man power short. 8 hrs duty considered with off.

4.1 BCP 18 17 18 Required Turner.

4.2 NBCP 10 8 10

Total (S. No. 1 to 4) 266 257 266

ADDITIONAL REQUIREMENT

0 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 266 18.25 4854.5 4855

2 4 National Holiday in a year 266 4 1064 1064

Breakdown/Shutdown/Schedual Maintenance (5% of total


3 4855 0 0
mandays)

4 Adhoc Labour 0 0 0

Total OT Duty per annum (mandays) 5919

Total Normal Duty in a year (mandays) 96026

% OT Duty in a year (mandays) 6.16

Future requirements are not included in Normal duty hours.


Date : 20-Nov-17
Shree Cement Ltd. (BGU, AUrangabad)

Department : Packing plant

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

One operator taken in shift (company role). Weekly off not


1 ILMS operator 6 5 6
considered.

1.1 BCP 3 2 3

1.2 NBCP 3 3 3

2 House keeping supervisor 2 2 2 Weekly off not considered

2.1 BCP 1 1 1

2.2 NBCP 1 1 1

3 House keeping labours 30 30 30 Weekly off is not considered.

3.1 BCP 20 20 20

3.2 NBCP 10 10 10

8 nos in NBCP. BCP is given in contract. Weekly off is not


4 Bag godown 8 8 8
considered.

4.1 BCP Given in monthly contract

4.2 NBCP 8 8 8

Total (S. No. 1 to 4) 46 45 46

ADDITIONAL REQUIREMENT

Total 0 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 46 18.25 839.5 840

2 4 National Holiday in a year 46 4 184 184

3 Breakdown/Shutdown/Schedual Maintenance 0 0 0

Adhoc Labour ( for cleaning 5.5 meter floor area & elevator pit) 50
4 600 0 0
nos x 2 plant x 6 times (once in two month)

Total OT Duty per annum (mandays) 1024


Total Normal Duty in a year (mandays) 16367
% OT Duty in a year (mandays) 6.25

Future requirements are not included in Normal duty hours.


Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : Instrumentation

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

One manpower left. Requirement is for 8 hours without weekly


1 Technician-Shift operation 14 13 14
off.

1.1 BCP 7 6 7

1.2 NBCP 7 7 7

One manpower left. Requirement is for 8 hours without weekly


2 Technician - Maint. 6 5 6
off.

2.1 BCP 4 3 4

2.2 NBCP 2 2 2

Total (S. No. 1 to 2) 20 18 20

ADDITIONAL REQUIREMENT

Technician for attending field


problem in packing plant.
1 Existing two technicians are 3 one technician for both packing plant shift problem
looking after weight
variation.

Total 3 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 20 18.25 365 365

2 4 National Holiday in a year 20 4 80 80

3 Breakdown/Shutdown/Schedual Maintenance 720 0 0

4 Adhoc Labour 0 0 0

Total OT Duty per annum (mandays) 445


Total Normal Duty in a year (mandays) 7575
% OT Duty in a year (mandays) 5.87

Future requirements are not included in Normal duty hours.


Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : Electrical

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

Three manpower left. Requirement is for 8 hours without weekly


1 Electrician-Shift operation 14 11 14
off.

1.1 BCP 7 6 7

1.2 NBCP 7 5 7

Two manpower left. Requirement is for 8 hours without weekly


2 Electrician - Maint. 8 6 8
off.

2.1 BCP 4 3 4

2.2 NBCP 4 3 4

3 Semi-Skilled helper 10 10 10 Requirement is for 8 hrs without weekly off

3.1 BCP 6 6 6

3.2 NBCP 4 4 4

Total (S. No. 1 to 3) 32 27 32

ADDITIONAL REQUIREMENT

4 Lift operator 2 0 2 For BCP & NBCP silo lift

Electrician for maintaining


5 3 0 3
power factor in NBCP

Total 5 0 5

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 32 18.25 584 584

2 4 National Holiday in a year 32 4 128 128

3 Breakdown/Shutdown/Schedual Maintenance 720 0 0

Adhoc Labour for motor overhauling & work shop (one mechanical
4 1440 0 0
gang of 4 nos per day)

Total OT Duty per annum (mandays) 712


Total Normal Duty in a year (mandays) 13128
% OT Duty in a year (mandays) 5.42

Future requirements are not included in Normal duty hours.


Three manpowers are irregular in duty.
Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : Process

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

1 Attender 9 9 9 without weekly off

1.1 BCP 6 6 6

1.2 NBCP 3 3 3

2 Helper 30 30 30 without weekly off

2.1 BCP 15 15 15

2.2 NBCP 15 15 15

Total (S. No. 1 to 2) 39 39 39

ADDITIONAL REQUIREMENT

Total 0 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 39 18.25 711.75 712

2 4 National Holiday in a year 39 4 156 156

3 Breakdown/Shutdown/Schedual Maintenance 120 0 0

Adhoc Labour (HAG raw material like sand screening and drying,
Charcoal drying 10 nos.x10 daysx12 months & local furnace
4 1680 0 0
operation-10 Nos x 3 days x 6 months)(Grinding media sorting and
handling 10 nos x 30 days x 1 time)

Total OT Duty per annum (mandays) 868


Total Normal Duty in a year (mandays) 15167
% OT Duty in a year (mandays) 5.72

Future requirements are not included in Normal duty hours.


Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : RMH (Raw material handling)

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

Approval is for 2 operators in 12 hrs duty. Required manpower


1 JCB operator 2 2 3
is for 8 hrs duty without off day.

Approval is for 12 hrs duty. Required man power is for 8 hrs


2 JCB helper 1 1 1
without off day.

All are in 8 hrs duty. One is in Quess category and one in


3 Supervisor 6 6 6 voucher payment who avail weekly off. Other 4 supervisors are
in contractor's scope without weekly off.

Approval is for 12 hrs duty. Required man power is for 8 hrs


4 RMH labour 10 10 15
without off day.

Total (S. No. 1 to 4) 19 19 25

ADDITIONAL REQUIREMENT

1 RMH labour

Total 0 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 25 18.25 456.25 456

2 4 National Holiday in a year 25 4 100 100

3 Breakdown/Shutdown/Schedual Maintenance 0 0 0

Adhoc Labour (540 mandays in rainy season + 110 mandays for


4 650 0 0
material unloading)

Total OT Duty per annum (mandays) 556


Total Normal Duty in a year (mandays) 9219
% OT Duty in a year (mandays) 6.03

Future requirements are not included in Normal duty hours.


Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : Quality control

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

1 PP bags 2 2 2 Sampling and testing

2 Physical / R&D 6 6 6 Cube casting and gauging

Sampling ( BCP - 7 man power & NBCP - 4 man power) NBCP


3 Shift operation 11 7 11 -4 man power is short and duty adjusted in available man
power.

Total (S. No. 1 to 3) 19 15 19

ADDITIONAL REQUIREMENT

Total 0 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 19 18.25 346.75 347

2 4 National Holiday in a year 19 4 76 76

3 Breakdown/Shutdown/Schedual Maintenance 0 0 22

4 Adhoc Labour 500 0 0

Total OT Duty per annum (mandays) 445


Total Normal Duty in a year (mandays) 7012
% OT Duty in a year (mandays) 6.34

Future requirements are not included in Normal duty hours.


Date : 20-Nov-18
Shree Cement Ltd. (BGU, AUrangabad)

Department : Civil

Sectionwise Contractual Manpower optimisation Details


Sanctioned Existing Required
Sl. No. Section Working Details
Manpower Manpower Manpower

TPS machine (2 nos.) Approval for 12 hrs duty. Two extra operators required for 8 hrs
1 4 4 6
operator duty to run two machines

1.1 BCP 2 2 3

1.2 NBCP 2 2 3

2 NBCP -Tractor driver ( 1nos) 1 1 1.5 Approval for 12 hrs duty. One operator required for 12 hrs duty.

Approval for 12 hrs duty. One operator required for 8 hrs duty in
3 Chipper (1 No.) 1 1 2
NBCP.

4 Supervisor 3 3 3 Two no. supervisors reduced as per approval of 5 nos.

Skilled ( Carpenter, Plumber,


5 3 3 3 Work in G shift as per their skill.
Mason)

Unskilled house keeping


6 55 55 55 House keeping & helper for skilled manpower
helper

6.1 BCP 49 49 49

6.2 NBCP 6 6 6

Total (S. No. 1 to 10) 67 67 70.5

ADDITIONAL REQUIREMENT

Total 0 0 0

Expected Over Time per annum

Sr. No. Particulars Total Labour Holidays Mandays in Holiday Overtime (Mandays)

1 Absentism (5% per man power in a year) 70.5 18.25 1286.625 1287

2 4 National Holiday in a year 70.5 4 282 282

3 Breakdown/Shutdown/Schedual Maintenance 0 0 0

4 Adhoc Labour 1287 0 0

Total OT Duty per annum (mandays) 1569


Total Normal Duty in a year (mandays) 25451
% OT Duty in a year (mandays) 6.16

Future requirements are not included in Normal duty hours.