Form No.

: GPOS-ENG-05-002
CIRCUIT BREAKER TEST Revision : R0

CUSTOMER : AREA :
EQUIPMENT NO : FEEDER :
Manufacture : Rated Voltage :
Model / Type : Rated Current :
Serial No : Frequency :
Control Power : Year :
Rated Lighting impulse withstand voltage : Rated short circuit breaking current :

TEST EQUIPMENT :

A. FUNCTION TEST
MECHANICAL
1. Closing System :
2. Opening System :
ELECTRICAL
1. Closing System :
2. Opening System :
B. INSULATION RESISTANCE
Megger circuit breaker by 5000 VDC and measure at point

1. Pole A to B,C and Grounding :


2. Pole B to A,C and Grounding :

3. Pole C to A,B and Grounding :


4.Between Pole A :
5.Between Pole B :
6.Between Pole C :

C. EQUIPMENT ACCESSORIES
1. Spring Charging Motor :
2. Under Voltage release :
3. Other :

D REMARKS :

COMPLETED BY SESCO VENDOR OWNER (PT SMART)

SIGNATURE

NAME
Eko Ageng Tang Huai Qiang Candra Irawan
DATE

File No. E.7/1-HO


Project : TARJUN
Client : PT SMART
Project Name : TARJUN POWER PLANT 1X6MW
Commissioning Test Certificate
Form No. : GPOS-ENG-05-003
TRANSFORMER PROTECTION INSPECTION
Revision : R0

LOCATION: Project Tarjun 1x6 MW RELEVANT DRAWINGS:

EQUIPMENT NO: Main Transformer 02 AREA CLASS:

INSPECTION

Primary Voltage : 6300 V Manufacture: Jihan FAAO ELECTRIC


Secondary Voltage : 400 V Serial No.: 905002
Nom. Current : 6300V = 366.6A , 400 = 5773.5A Vector Group: DY01
Tap Range : Jihan FAAO ELECTRIC Imp/Reactance:

Function Check of Protectives Devices


OK Not OK
1. Oil Level Gauge for Transformer
- minimum level contact action Oke
- maximum level contact action Oke
2. Oil Level Gauge for OLTC
- minimum level contact action
- maximum level contact action
3. Contact Thermometer for oil temperature
- warning at : 65⁰C contact action Oke
- tripping at : 80⁰C contact action Oke
4. Winding Temperature Indicator
- reserved at: contact action
- fan "ON" at: contact action
- warning at : contact action
- tripping at : contact action
5. Buchholz Relay for Transformer
- warning contact action Oke
- tripping contact action Oke
6. Protective Relay for OLTC
- warning contact action

Remarks:

COMPLETED BY SESCO VENDOR OWNER (PT SMART)

SIGNATURE

NAME Eko Ageng Tang Huai Qiang Chandra Irawan


DATE
File No. E.7/1-HO
: GPOS-ENG-05-003

ELECTRIC

Not OK

R (PT SMART)

ndra Irawan
Project : TARJUN
Client : PT SMART
Project Name : TARJUN POWER PLANT 1X6MW

TRANSFORMER INSPECTION Form No. :GPOS-ENG-05-006


( INSULATION OIL TEST )
Revision : R0

Transformer No : O1 System : ONAN


Data sheet : Manufacture : JIHAN FAAO Made in China
Serial No : 905001 Operating voltage : 6.3kV to 0.4kV

Sample taken from : Transformer Tank Volume : 1940 Litres

TEST RESULTS-SAMPLE NO: Transformer 01


Break Down Voltage test
No OIL TIME Colour Average
1 2 3 4 5 6
1 Test before filtering 10.3 Clear 10 13 17 17 18 14.2
2 After filtering 1 12.26 AM Clear 35 32 33 32 44 35.2
3 After filtering 2
4 After filtering 3
5 After filtering 4

Remarks :

Electric strenght:...................................kV
Test equipment gap: 2.5mm
Equipment/Instrument Used for Testing :

COMPLETED BY CONTRACTOR COUNSULTANT/VENDOR OWNER (PT SMART)

SIGNATURE

NAME Tang Huai Qiang Candra Irawan


DATE 3/7/2010 3/7/2010 3/7/2010

Reported by,

PT SESCO
File No. E.7/1-HO
Project : TARJUN
Client : PT SMART
Project Name : TARJUN POWER PLANT 1X6MW

TRANSFORMER INSPECTION Form No. :GPOS-ENG-05-006


( INSULATION OIL TEST )
Revision : R0

Transformer No : O2 System : ONAN


Data sheet : Manufacture : JIHAN FAAO Made in China
Serial No : 905002 Operating voltage : 6.3kV to 0.4kV

Sample taken from : Transformer Tank Volume : 1940 Litres

TEST RESULTS-SAMPLE NO: Transformer 02


Break Down Voltage test
No OIL TIME Colour Average
1 2 3 4 5 6
1 Test before filtering 13.30 Clear 13 16 30 34 28 24.2
2 After filtering 1 16.52 Clear 25 32 35 43 38 34.6
3 After filtering 2 19.39 Clear 25 28 34 41 40 33.6
4 After filtering 3 19.39 Clear 35 35 32 32 34 33.6
5 After filtering 4

Remarks :

Electric strenght:...................................kV
Test equipment gap: 2.5mm
Equipment/Instrument Used for Testing :

COMPLETED BY CONTRACTOR COUNSULTANT/VENDOR OWNER (PT SMART)

SIGNATURE

NAME Tang Huai Qiang Candra Irawan


DATE 3/7/2010 3/7/2010 3/7/2010

Reported by,

PT SESCO
File No. E.7/1-HO
NG-05-006

Average

24.2
34.6
33.6
33.6

SMART)

awan
10
MEGGERING Form No. : GPOS-ENG-05-009
TEST REPORT Revision : R0

CONTRACTOR : PBN PROJECT : TARJUN POWER PLAN 1X6MW


EQUIP TAG No. : EXITATION TRANSFORMER DRAWING No :
DESCRIPTION : SPECIFICATION :
LOCATION : PT SMART REPORT No. :

TEST EQUIPMENT :

No PHASE OHM
SEQUENCE SPECIFICATION REMARKS
5000V 10000V
1
L1 - L2 400 MegaOhm
2
L2 - L3 390 MegaOhm
3
L3 - L1 400 MegaOhm
4
L1 - G
5
L2 - G
6
L3 - G

COMPLETED BY CONSULTANT VENDOR OWNER (PT SMART)

SIGNATURE

NAME Wahyu Tang Huai Qiang Candra Irawan

DATE 7/7/2010 7/7/2010 7/7/2010

REPORTED BY : PT SESCO

Eko Ageng
MEGGERING Form No. : GPOS-ENG-05-009
TEST REPORT Revision : R0

CONTRACTOR : PBN PROJECT : TARJUN POWER PLAN 1X6MW


EQUIP TAG No. : Busbar generator 1x6 MW DRAWING No :
DESCRIPTION : SPECIFICATION :
LOCATION : PT SMART REPORT No. :

TEST EQUIPMENT :

No PHASE OHM
SEQUENCE SPECIFICATION REMARKS
1000V 5000V
1
L1 - L2 100 MΩ MegaOhm
2
L2 - L3 100 MΩ MegaOhm
3
L3 - L1 100 MΩ MegaOhm
4
L1 - G 100 MΩ MegaOhm
5
L2 - G 100 MΩ MegaOhm
6
L3 - G 100 MΩ MegaOhm

COMPLETED BY CONSULTANT (AVK) VENDOR OWNER (PT SMART)

SIGNATURE

NAME Frans Haryanto Tang Huai Qiang Candra Irawan

DATE 27/7/2010 27/7/2010 27/7/2010

REPORTED BY : PT SESCO

Eko Ageng
Project : TARJUN
Client : PT SMART
Project
Name : TARJUN POWER PLANT 1X6MW

MOTOR TEST
TOTAL TEST
POWER
NO DESCRIPTION UNIT POWER
(KW) MEGGER RUN ROTATION
(KW)
1 FEED WATER PUMP 2 220 440 Oke Oke Oke
2 SPARSE WATER PUMP 2 7.5 15 Oke Oke Oke
3 FD FAN BLOWER/ AIR BLOWER 1 90 90 Oke Oke Oke
FD FAN BOOSTER/ SECONDARY
4 PRESSURIZATION BLOWER 1 90 90 Oke Oke Oke
5 ID FAN/ DRAWING FAN 1 250 250 Oke Oke Oke
6 INTAKE SEA WATER PUMP 3 200 600 Oke Oke Oke
COOLING TOWER PUMP/
7 CIRCULATING COOLING WATER 2 30 60 Oke Oke Oke
PUMP
8 COOLING TOWER FAN EXHAUST 1 11 11 Oke Oke Oke
9 CHAIN GRATE MOTOR 1 4 4 Oke Oke Oke
OIL TANK PUMP
10 OIL PUMP AUXILIARY 1 37 37 Oke Oke Oke
11 SMOKE BLOWER 1 0.75 0.75 Oke Oke Oke
DIRECT-FLOW OIL PUMP
12 1 4 4 Oke Oke Oke
DISTRIBUTING BOX
DOSING PUMP
13 DOSING PUMP PHOSPHAT 2 0.75 1.5 Oke Oke Oke
14 DOSING PUMP AMMONIA 2 0.55 1.1 Oke Oke Oke
15 AGITATOR AMMONIA 1 0.55 0.55 Oke Oke Oke
16 AGITATOR PHOSPHAT 1 0.55 0.55 Oke Oke Oke
17 CONDENSATE PUMP 2 7.5 15 Oke Oke Oke
RUBBER BALL SCAVENGING
18 1 11 11 Oke Oke Oke
PUMP
CONVEYOR UNIT
19 BELT CONVEYOR 1 1 4 4 Oke Oke Oke
20 BELT CONVEYOR 2 1 11 11 Oke Oke Oke
21 BELT CONVEYOR 3 1 7.5 7.5 Oke Oke Oke
22 PULLING COAL FEEDER 4 4 16 Oke Oke Oke
23 MOTOR STOKER 4 1.1 4.4 Oke Oke Oke
24 RECIPROCATING COAL FEEDER 1 4 4 Oke Oke Oke
ELECTROMAGNETIC IRON
25 1 1.5 1.5 Oke Oke Oke
REMOVER
26 NON-BLOCKAGE FINE CRUSHER 1 45 45 Oke Oke Oke
27 KOMPRESOR 1 55 55 Oke Oke Oke
28 SELONOID 1 0.09 0.09 Oke Oke Oke
29 WINS 1 1.5 1.5 Oke Oke Oke
30 MOTOR DAMPER ASH SILO 1 1.5 1.5 Oke Oke Oke
BOARD CHAIN TYPE BUCKET
31 1 11 11 Oke Oke Oke
ELEVATOR
32 PULLING CONVEYOR 1 4 4 Oke Oke Oke
MARTIN DISCHARGE/ THE
33 MARTIN TYPE LEARES THE DREG 1 1.5 1.5 Oke Oke Oke
MACHINE
34 ROLLING GEAR 1 2.2 2.2 Oke Oke Oke
35 SLAG HOPER 1 1.1 1.1 Oke Oke Oke
TROUGH THE COAL MACHINE UNIT
36 TROUGH THE COAL MACHINE 1 1 1.1 1.1 Oke Oke Oke
37 TROUGH THE COAL MACHINE 2 1 1.1 1.1 Oke Oke Oke
38 TROUGH THE COAL MACHINE 3 1 1.1 1.1 Oke Oke Oke
39 TROUGH THE COAL MACHINE 4 1 1.1 1.1 Oke Oke Oke
40 STOCKER 1 4 4 Oke Oke Oke
41 CHAIN GRATE MOTOR 1 4 4 Oke Oke Oke

COMPLETED BY CONSULTANT VENDOR OWNER (PT SMART)

SIGNATURE

NAME Wahyu Tang Huai Qiang Chandra Irawan


DATE
Project : TARJUN
Client : PT SMART
Project Name : TARJUN POWER PLANT 1X6MW

PROTECTION RELAYS
TEST AND SETTINGS
WBY 2000B WBY 2000B WBY 2000B WBY 2000B WBY 2000B

No Description 3AH SUBSTATION 4AH 5AH SEA 6AH MAIN 7AH MAIN
EMERGENCY WATER TRANSFORMER TRANSFORMER
TRANSFORMER TRANSFORMER PUMP #1 #2

6.0 6.0 6.0 6.0 6.0


1 PT Ratio Factor
CT Ratio
3.0 3.0 1.5 10 10
2 Factor
3 Fast Breaking 15.5 A 15.5 A 20 A 18.3 A 18.3 A
Fast Breaking
19.00 s 100 s 4.0 s 100 s 0.1s
4 Time
5 Over Current 3.5 3.5 4.6 4.4 4.4
Over Current
0.5 s 0.5 s 0.5 s 0.5 s 0.5 s
6 Time
Zero Seq.
1.0 A 100.00 A 3.0 A 0.5 A 1.0
7 Current
Zero Seq.
1.0 s 10.0 s 0.1 s 0.2s 1.0
8 Current Time
9 Over Load 3.20 A 3.20 A 4.1 A 3.85 A 3.85 A
Over Load 1.0 s 1.0 s 1.0 s 1.0 s 1.0 s
10 Time

49.00 Hz 49.00 Hz 49.00 Hz 49.00 Hz 49.00 Hz


11 Low Frequency
Low Frequency 99.00 s 99.00 s 99.00 s 99.00 s 99.00 s
12 Time
Busbar 30.00 30.00 30.00 30.00 30.00
13 Earthing
14 Low Voltage 50.0 100.00 0.1 2.0 0.1
Low Voltage 0.1 s 10.00s 10.00s 10.00 s 10.00s
15 Time Delay

COMPLETE BY SESCO VENDOR OWNER (PT SMART)

SIGNATURE

NAME Eko Ageng Tang Huai Qiang Candra Irawan

DATE
Project : TARJUN
Client : PT SMART
Project Name : TARJUN POWER PLANT 1X6MW

TRANSFORMER INSPECTION Form No. :GPOS-ENG-05-006


( INSULATION OIL TEST )
Revision : R0

Transformer No : 01 and 02 System : ONAN


Data sheet : Manufacture : JIHAN FAAO Made in China
Serial No : Operating voltage : 6.3kV to 0.4kV

Sample taken from : Transformer Tank Volume : 1940 Litres

TEST RESULTS-SAMPLE NO: Transformer 01 and 02


Break Down Voltage test
No OIL TIME Colour Average
1 2 3 4 5 6
1 Transformer 1 11.31 Clear 31.54 31.24 34.20 39.08 40.58 35.33
2 Transformer 2 10.00 Clear 36.08 36.07 36.66 39.06 40.03 36.58
3
4
5

Remarks :

Electric strenght:...................................kV
Test equipment gap: 2.5mm
Equipment/Instrument Used for Testing :

COMPLETED BY CONTRACTOR COUNSULTANT/VENDOR OWNER (PT SMART)

SIGNATURE

NAME Tang Huai Qiang Candra Irawan


DATE 29/7/2010 29/7/2010 29/7/2010

Reported by,

PT SESCO
File No. E.7/1-HO
NG-05-006

Average

35.33
36.58

SMART)

awan
10
Switchgear Form No. : GPOS-ENG-05-001
Functional test record Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 602 FEEDER : Incoming from Generator
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : 750 A
Serial No : 90675 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA

Mechanical / Electrical Inspection


No Description Oke N/A No
1 Examine the circuit Breaker for any internal damage Oke
2 Check all fixing andterminal screws for tightness Oke
3 Check completeness of module/equipment Oke
4 Clean as applicable Oke
5 Equipment label check Oke
6 Circuit breaker mechannical aligment and free movement Oke
7 Check mechanical Interlock of module Oke
8 Locking off fasility Oke
9 Lubricate all bearing surface bearing and pivots Oke
10 Charging the closing spring with the hand crank Oke
11 close the breaker by press close push bottom Mech ON Oke
12 Trip the breaker by pressing the open push bottom Mech OFF Oke
13 Check polarity of AC dan DC supplies Oke
14 Test operation with the motor mechanism by switch on the supply voltage Oke
15 Check by electrical actuation-the function of the under voltage release- F3 Oke
16 Check by electrical actuation-the function of the closing selenoid Y1 Oke
17 Check by electrical actuation-the function of the triping selenoid Y1 Oke
18 Check the circuit breaker open indication Oke
19 Check the circuit breaker close indication Oke
20 Check the circuit breaker trip indication Oke
21 Check permisivible closing by remote Oke
22 Check tripping system by remote Oke
23 Check spring charging motor operation Oke
24 Check operation of circuit breaker auxilery contack Oke
25 Check anti condesation heater operation Oke
26 Check metering Oke
File No. E.7/1-HO
Switchgear Form No. : GPOS-ENG-05-001
Functional test record Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 603 FEEDER : 1# DRY TRANSFORMER
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : 100 A
Serial No : 90676 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA

Mechanical / Electrical Inspection


No Description Oke N/A No
1 Examine the circuit Breaker for any internal damage Oke
2 Check all fixing andterminal screws for tightness Oke
3 Check completeness of module/equipment Oke
4 Clean as applicable Oke
5 Equipment label check Oke
6 Circuit breaker mechannical aligment and free movement Oke
7 Check mechanical Interlock of module Oke
8 Locking off fasility Oke
9 Lubricate all bearing surface bearing and pivots Oke
10 Charging the closing spring with the hand crank Oke
11 close the breaker by press close push bottom Mech ON Oke
12 Trip the breaker by pressing the open push bottom Mech OFF Oke
13 Check polarity of AC dan DC supplies Oke
14 Test operation with the motor mechanism by switch on the supply voltage Oke
15 Check by electrical actuation-the function of the under voltage release- F3 Oke
16 Check by electrical actuation-the function of the closing selenoid Y1 Oke
17 Check by electrical actuation-the function of the triping selenoid Y1 Oke
18 Check the circuit breaker open indication Oke
19 Check the circuit breaker close indication Oke
20 Check the circuit breaker trip indication Oke
21 Check permisivible closing by remote Oke
22 Check tripping system by remote Oke
23 Check spring charging motor operation Oke
24 Check operation of circuit breaker auxilery contack Oke
25 Check anti condesation heater operation Oke
26 Check metering Oke
File No. E.7/1-HO
Switchgear Form No. : GPOS-ENG-05-001
Functional test record Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 604 FEEDER : 0# DRY TRANSFORMER
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : 100 A
Serial No : 90677 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA

Mechanical / Electrical Inspection


No Description Oke N/A No
1 Examine the circuit Breaker for any internal damage Oke
2 Check all fixing andterminal screws for tightness Oke
3 Check completeness of module/equipment Oke
4 Clean as applicable Oke
5 Equipment label check Oke
6 Circuit breaker mechannical aligment and free movement Oke
7 Check mechanical Interlock of module Oke
8 Locking off fasility Oke
9 Lubricate all bearing surface bearing and pivots Oke
10 Charging the closing spring with the hand crank Oke
11 close the breaker by press close push bottom Mech ON Oke
12 Trip the breaker by pressing the open push bottom Mech OFF Oke
13 Check polarity of AC dan DC supplies Oke
14 Test operation with the motor mechanism by switch on the supply voltage Oke
15 Check by electrical actuation-the function of the under voltage release- F3 Oke
16 Check by electrical actuation-the function of the closing selenoid Y1 Oke
17 Check by electrical actuation-the function of the triping selenoid Y1 Oke
18 Check the circuit breaker open indication Oke
19 Check the circuit breaker close indication Oke
20 Check the circuit breaker trip indication Oke
21 Check permisivible closing by remote Oke
22 Check tripping system by remote Oke
23 Check spring charging motor operation Oke
24 Check operation of circuit breaker auxilery contack Oke
25 Check anti condesation heater operation Oke
26 Check metering Oke
File No. E.7/1-HO
Switchgear Form No. : GPOS-ENG-05-001
Functional test record Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 605 FEEDER : SEA WATER INTAKE
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : 60 A
Serial No : 90678 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA

Mechanical / Electrical Inspection


No Description Oke N/A No
1 Examine the circuit Breaker for any internal damage Oke
2 Check all fixing andterminal screws for tightness Oke
3 Check completeness of module/equipment Oke
4 Clean as applicable Oke
5 Equipment label check Oke
6 Circuit breaker mechannical aligment and free movement Oke
7 Check mechanical Interlock of module Oke
8 Locking off fasility Oke
9 Lubricate all bearing surface bearing and pivots Oke
10 Charging the closing spring with the hand crank Oke
11 close the breaker by press close push bottom Mech ON Oke
12 Trip the breaker by pressing the open push bottom Mech OFF Oke
13 Check polarity of AC dan DC supplies Oke
14 Test operation with the motor mechanism by switch on the supply voltage Oke
15 Check by electrical actuation-the function of the under voltage release- F3 Oke
16 Check by electrical actuation-the function of the closing selenoid Y1 Oke
17 Check by electrical actuation-the function of the triping selenoid Y1 Oke
18 Check the circuit breaker open indication Oke
19 Check the circuit breaker close indication Oke
20 Check the circuit breaker trip indication Oke
21 Check permisivible closing by remote Oke
22 Check tripping system by remote Oke
23 Check spring charging motor operation Oke
24 Check operation of circuit breaker auxilery contack Oke
25 Check anti condesation heater operation Oke
26 Check metering Oke
File No. E.7/1-HO
Switchgear Form No. : GPOS-ENG-05-001
Functional test record Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 606 FEEDER : MAIN TRANSFORMER 1
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : 390 A
Serial No : 90679 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA

Mechanical / Electrical Inspection


No Description Oke N/A No
1 Examine the circuit Breaker for any internal damage Oke
2 Check all fixing andterminal screws for tightness Oke
3 Check completeness of module/equipment Oke
4 Clean as applicable Oke
5 Equipment label check Oke
6 Circuit breaker mechannical aligment and free movement Oke
7 Check mechanical Interlock of module Oke
8 Locking off fasility Oke
9 Lubricate all bearing surface bearing and pivots Oke
10 Charging the closing spring with the hand crank Oke
11 close the breaker by press close push bottom Mech ON Oke
12 Trip the breaker by pressing the open push bottom Mech OFF Oke
13 Check polarity of AC dan DC supplies Oke
14 Test operation with the motor mechanism by switch on the supply voltage Oke
15 Check by electrical actuation-the function of the under voltage release- F3 Oke
16 Check by electrical actuation-the function of the closing selenoid Y1 Oke
17 Check by electrical actuation-the function of the triping selenoid Y1 Oke
18 Check the circuit breaker open indication Oke
19 Check the circuit breaker close indication Oke
20 Check the circuit breaker trip indication Oke
21 Check permisivible closing by remote Oke
22 Check tripping system by remote Oke
23 Check spring charging motor operation Oke
24 Check operation of circuit breaker auxilery contack Oke
25 Check anti condesation heater operation Oke
26 Check metering Oke
File No. E.7/1-HO
Switchgear Form No. : GPOS-ENG-05-001
Functional test record Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 607 FEEDER : MAIN TRANSFORMER 2
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : 390A
Serial No : 90680 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA

Mechanical / Electrical Inspection


No Description Oke N/A No
1 Examine the circuit Breaker for any internal damage Oke
2 Check all fixing andterminal screws for tightness Oke
3 Check completeness of module/equipment Oke
4 Clean as applicable Oke
5 Equipment label check Oke
6 Circuit breaker mechannical aligment and free movement Oke
7 Check mechanical Interlock of module Oke
8 Locking off fasility Oke
9 Lubricate all bearing surface bearing and pivots Oke
10 Charging the closing spring with the hand crank Oke
11 close the breaker by press close push bottom Mech ON Oke
12 Trip the breaker by pressing the open push bottom Mech OFF Oke
13 Check polarity of AC dan DC supplies Oke
14 Test operation with the motor mechanism by switch on the supply voltage Oke
15 Check by electrical actuation-the function of the under voltage release- F3 Oke
16 Check by electrical actuation-the function of the closing selenoid Y1 Oke
17 Check by electrical actuation-the function of the triping selenoid Y1 Oke
18 Check the circuit breaker open indication Oke
19 Check the circuit breaker close indication Oke
20 Check the circuit breaker trip indication Oke
21 Check permisivible closing by remote Oke
22 Check tripping system by remote Oke
23 Check spring charging motor operation Oke
24 Check operation of circuit breaker auxilery contack Oke
25 Check anti condesation heater operation Oke
26 Check metering Oke
File No. E.7/1-HO
Switchgear Form No. : GPOS-ENG-05-001
Functional test result Revision : R0

CUSTOMER : PT SMART AREA : ELECTRICAL ROOM


EQUIPMENT NO : 602,603,604,605,606,607 FEEDER :ALL
Manufacture : JIE YUAN Rated Voltage : 6.3 KV
Model / Type : KYN 28A Rated Current : ALL
Serial No : 90674,5,6,7,8,9,80 Frequency : 50 Hz
Control Power : Year : 2006
Rated Lighting impulse withstand voltage : Rated short circuit breaking current : 31.5 KA
Mechanical / Electrical Inspection

NOTE : All feeder and breaker already check and test, all good result

COMPLETED B SESCO VENDOR OWNER (PT SMART)

SIGNATURE

NAME
Eko Ageng Tang Huai Qiang Chandra Irawan
DATE

File No. E.7/1-HO