Description Unit Quantity Unit Price ($) Amount ($) Opinion ($)
Site Preparation
MOBILIZATION LS 1 2,000 2,000
EROSION CONTROL LF 600 10 6,000
CONSTRUCTION SIGNS LS 1 500 500
CONSTRUCTION STAKING/SURVEY LS 1 5,000 5,000
TRAFFIC CONTROL ON SPEAR STREET LS 1 1,000 1,000
14,500 15
US Wetland
EARTH EXCAVATION CY 996 10 9,960
RIPRAP CY 10 40 400
10,360 10
Remove berm along Spear Street
EARTH EXCAVATION CY 10 284 2,840 5
Length
Along Station Across Existing Proposed Distance
River River Elevation Elevation Cut (feet) (feet)
Reconnect U/S left
bank wetland near
Lewis Creek Road 770.4 486.03 486.03 0
100 800.4 488.43 486.03 -2.4 30
130 824.4 488.38 486.03 -2.35 24
100 869.4 489.1 486.03 -3.07 45
90 896 484.04 484.04 0 26.6
Station
Across Proposed Distance Average
cut at Section 5.5 River Existing Elevation Elevation Cut (feet) (feet) Cut (feet)
1055.5 483.8 483.8 0
1065.9 485.01 484.37 -0.64 10.4 -0.32
1077.9 485.01 484.37 -0.64 12 -0.64
1089.9 485.01 484.37 -0.64 12 -0.64
1099.9 484.9 484.37 -0.53 10 -0.585
XS 5.5 Cut:
Station
Across Proposed Distance Average
cut at Section 5.0 River Existing Elevation Elevation Cut (feet) (feet) Cut (feet)
1055.5 483.8 483.42 -0.38
1062.9 484.88 483.42 -1.46 7.4 -0.92
1077.9 484.88 483.42 -1.46 15 -1.46
1084.9 484.88 483.42 -1.46 7 -1.46
1087 483.42 483.42 0 2.1 -0.73
1097.1 484.37 483.42 -0.95 10.1 -0.475
1220 482.79 482.79 0 122.9 -0.475
XS 5.0 Cut:
Cut Cut
Length Average Volume Volume
Along Cut Area (cubic (cubic
River Cut Area (sq feet) (sq feet) feet) yards)
0
5.5 50 -24.538 -12.269 -613.45 -23
5.0 50 -74.927999999999 -49.733 -2486.65 -92
230 0 -37.464 -8616.72 -319
Road Cut: -11716.82 -434
-489.15025 -18
-891.27325 -33
-5838.33 -216
-461.25 -17
-7680.0035 -284
Cut Area
(sq feet)
-3.328
-7.68
-7.68
-5.85
-24.538
Cut Area
(sq feet)
-6.808
-21.9
-10.22
-1.533
-4.7975
-58.3775
-74.928