SHIFT REPORT GEOLOGY

PT NARAYANA LAMBALE SELARAS

Project Name : Nickel Mine Project Hari : Sabtu


Lokasi : Tapuhaka, Kec Kabaena Timur Tanggal : 18 Des 2019
Work Package : Stockpile EFO Jam Kerja : 8 Jam

Unit Total
No. Manpower Description Man Hours Total Mhr No. Equipment / Tools
EA Hours Hours
1 Spt Kualitas 1 8 8 1 Exavator Pc 200 1 8 8
2 Spv Produksi 1 8 8 2 -
3 Surveyor 1 8 8 3 -
4 Operator 4 8 32 4 -
5 Crew Sampler 7 8 56 5 -
6 Crew Survey 5 8 40 6 - -
7 - 7 - -
8 - 8 - -
9 - 9 - -
10 10 - -
- -
Total 1 8

Weather
No. Condition Remarks
(Time)

Clear

19 152 Weather Condition : Clear, Windy, Cloudy, Drizle, Rainy


-
No. Activity (Today) Vol. Unit Activity (Plan Tomorrow) Vol Unit

1 Pengukuran Tumpukan Ore EFO 10 Tumpukan Pengukuran Tumpukan Ore EFO 5 Tumpukan
2 Pengambilan Sampel Ore 10 Tumpukan 1 Pengambilan Sampel Ore 5 Tumpukan 1
Tranch Sampling 12 Titik 1

Problem

1 1 Unit Excavator breakdown (Hoose boom pecah ) - Teratasi

PT NARAYANA LAMBALE SELARAS


Reported By, Checked by Approved by,

Ade Lesmana Rizal Syahputtra Moch Djumarna ST


Geologist Spt Kualitas Kepala Teknik Tambang