Name of Work :- Providing LWSS Kurpan Khad to Banokhari Group Of Village in Sub Tehsil

Nankhari Tehsil Rampur, Distt. Shimla (HP)


DESIGN OF ANCHORE BLOCK
INPUT DATA :- (Ist Stage)
1) Deviation of Angle ( a ) = 33.75 Degrees
2) Diameter of pipe = 150 mm
3) Pressure (P) = 41.46 Kg/cm 2
4) Angle of internal Friction ( f ) = 30 Degrees
5) Density of concrete = 2300 Kg/m 3
6) Density of soil = 1800 Kg/m 3
7) Minimum cover of earth = 600 mm
8) Cohesion for sandy soils ( C ) = 0
Solution :-
Horizontal Thrust (F) = 2pA
X-sectional area (A) = p/4 x dia.of pipe (in cm 2 ) 176.71 Cm 2
Sin a/ 2 = 16.88 Degrees = 0.2903
F = 2 x (p) x (A) x ( Sin f / 2 ) x 10 -3 ) = 4.25 Tonnes
Lateral resistance to counter act the horizontal thrust
Try a Thrust block of size = Length = 0.90 Mts.
breadth = 0.90 Mts.
depth = 1.30 Mts.
Weight of thrust block = 2.42 Tonnes
Weight of water in pipe = 0.02 Tonnes
Weight of earth = 0.15 Tonnes
Total weight = 2.58 Tonnes
Total force available considering frictional resistance
of soil = 0.78 Tonnes
ii) Lateral resistance of soil against the block.
fp =Ysh(1+Sinf)/(1-Sinf)-2 CHL (1+Sinf)/(1-Sinf)
By assuming cohension as 0
the above equation
Yields=Density of soil(Ton/m3)xH2/2xlength of blockx(1+Sinf)/(1-Sinf)
= 4.11 Tonnes
iii) Lateral resistance of soil when the thrust block is
free to yield away from the soil mass i.e. the portion
of projected pipes.
fa=Ysh(1-Sinf)/(1+Sinf)-2 C (1-Sinf)/(1+Sinf)
Yields=Density of soil(Ton/m3)xH2/2xlength of blockx(1-Sinf)/(1+Sinf)
= 0.09 Tonnes
Total lateral = 4.97 Tonnes
Total horizontal thrust = 4.25 Tonnes
Factor of safety = 1.17 > 2.00 (Safe)
REINFORCEMENT :-
The min.surface reinforcement should be provided not less than 5 kg
per m2.The spacing of these bars is not exceed 500mm.Hence prov.
10 mm bars @ 200 mm c/c which is more than 5 kg per m 2.
Sin a/ 2 = 45.00 0 = 0.7071
Sin a/ 2 = 22.50 0 = 0.3827
Sin a/ 2 = 11.25 0 = 0.1950
Sin a/ 2 = 5.63 0 = 0.0981
Sin a/ 2 = 16.88 0 = 0.2903
DETAIL OF MEASUREMENT
Name of Work :- Providing LWSS Kurpan Khad to Banokhari Group Of Village in
Sub Tehsil Nankhari Tehsil Rampur, Distt. Shimla (HP)
(SH:-C/O ANCHORE BLOCK OF SIZE 0.90 0.90 1.50
DIMENSION
S.N. DESCRIPTION OF ITEM Nos. Quantity Unit
L B H/D
1) Excavation in foundations & trenches etc.
in earth work in all kinds of soil
Anchore Block 1.5 mtr ht. 20.00 1.20 1.20 0.45 12.96 Cum
Total 12.96 Cum
2) P/L c.concr.1:4:8 (1cement : 4 sand : 8
graded stone aggregate 40 mm nominal
size) & curing complete in foundation &
plinth.
Anchore Block 1.5 mtr ht. 20.00 1.20 1.20 0.15 4.32 Cum
Total 4.32 Cum
3) Providing form work with steel plates 3.15
mm thick welded with angle iron in frames
30 x30 x 5 mm so as to give a fair finish
Anchore Block 1.5mtr ht. Long side 40.00 0.90 1.05 37.80 Sqm.
Short side 40.00 0.90 1.05 37.80 Sqm.
Total 75.60 Sqm.
4) P/L c.concr.1:2:4 (1cement : 2 sand : 4
graded stone aggregate 20 mm nominal
size) & curing complete excluding the cost
of form work & reinforcement for RCC
work in :-
Foundation,footing,bases of columns &
the like & mass concrete.
Anchore Block 1.50 mtr ht. 20.00 0.90 0.90 1.50 24.30 Cum

Total 24.30 Cum


5) Providing Tor steel for RCC work i/c bend-
ing,binding & placing in position complete
upto floor two level.
Qty same as per item No.4 = 24.30 Cum @ 30.00 Kg/Cum 729.00 Kg
ANCHORE BLOCK

PCC "M:15"
m Width
0.90

1.50 CENTRE LINE

0.15
1.20
150 mm dia
0.10
1.20
100 mm thick.Lean concrete M - "7.5"
SECTION OF BLOCK AT "A - B"
10 mm f 200mm C/C (BOTH WAYSo
150 mm f
CC 1:2:4

0.60

10 mm f 200 mm C/C
A B

1.20 0.60
0.90

0.90
1.20

PLAN
ABSTACT OF COST
Name of Work :- Providing LWSS Kurpan Khad to Banokhari Group Of Ann. " D "
Village in Sub Tehsil Nankhari Tehsil Rampur, Distt. Shimla (HP)

(SH:-C/O ANCHORE BLOCK OF SIZE 0.90 0.90 1.50 )Mtr.

S.N. DESCRIPTION OF ITEM Qty. Rate Unit Amount


1) Excavation in foundations & trenches etc. 12.96 301.60 Cum 3909.00
in earth work in all kinds of soil such as
pick work,jumper work,blasting work &
chiselling work (where blasting work is
prohibited),lift upto 1.50 mts. Stacking the
excavated soil not more than 3.00 mts.
clear from the edge of excavation & then
returning the stacked soil in 15 cms.
layers,when required into plinth,sides of
foundation etc. consolidating each deposi-
trd layers by ramming & watering and then
disposing of all surplus excavated earth as
directed within a lead of 20 mts.
2) P/L c.concr.1:4:8 (1cement : 4 sand : 8 4.32 5188.70 Cum 22415.00
graded stone aggregate 40 mm nominal
size) & curing complete in foundation &
plinth.
3) Providing form work with steel plates 3.15 75.60 241.30 Sqm. 18242.00
mm thick welded with angle iron in frames
30 x30 x 5 mm so as to give a fair finish
i/c centring,shuttering,strutting & propping
etc. with wooden battens & ballies, height
of propping & centring below supporting
floor to ceiling not exceeding 4 mts. &
removal of the same for in situ-reinforced
concrete & plain concrete work in :-
Vertical surfaces such as walls (any thick.)
partitions & the like i/c attached pillasters,
buttresses,plinth & string courses & the like
4) P/L c.concr.1:2:4 (1cement : 2 sand : 4 24.30 7758.90 Cum 188541.00
graded stone aggregate 20 mm nominal
size) & curing complete excluding the cost
of form work & reinforcement for RCC
work in :-
Foundation,footing,bases of columns &
the like & mass concrete.
5) Providing Tor steel for RCC work i/c bend- 729.00 62.85 Kg 45818.00
ing,binding & placing in position complete
upto floor two level.
TOTAL 278925.00

Executive Engineer,
I&PH Division Rampur