Вы находитесь на странице: 1из 5

Scheduling/Leveling Report - 24-Nov-18 - PM.

exe
===============================================

Default Project..................................................Bldg

Projects:
Bldg............................................................Office
Building Addition

Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................Yes
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................Yes
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Start Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Successor
Activity Calendar
Preserve scheduled early and late dates..........................Yes
Level resources only within activity Total Float.................No
Level all resources..............................................Yes

Advanced
--------
Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Free Float
Number of paths to calculate.....................................50

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................87
# Not Started....................................................46
# In Progress....................................................10
# Completed......................................................31
# Relationships..................................................93
# Activities with Constraint.....................................0

Errors:
-------
Warnings:
---------
Activities without predecessors..................................17
Project: Bldg Activity: B-PE Plumbing & Electrical Summary
Project: Bldg Activity: BA-B Brick Summary
Project: Bldg Activity: BA-C Ceiling Summary
Project: Bldg Activity: BA-DE Design & Engineering Summary
Project: Bldg Activity: BA-DW Doors and Windows Summary
Project: Bldg Activity: BA-E Elevator Summary
Project: Bldg Activity: BA-EXT Exterior Finishes Summary
Project: Bldg Activity: BA-F Foundation Summary
Project: Bldg Activity: BA-FC Floor and Carpeting Summary
Project: Bldg Activity: BA-HVAC HVAC Summary
Project: Bldg Activity: BA-IF Interior Finishes Summary
Project: Bldg Activity: BA-ME Mech/Electrical Summary
Project: Bldg Activity: BA-P Paint Summary
Project: Bldg Activity: BA-PLF Plumbing & Light Fixtures
Summary
Project: Bldg Activity: BA-R Roof Summary
Project: Bldg Activity: BA-S Structure Summary
Project: Bldg Activity: BA000 Start Office Building Addition
Project

Activities without successors....................................20


Project: Bldg Activity: B-PE Plumbing & Electrical Summary
Project: Bldg Activity: BA-B Brick Summary
Project: Bldg Activity: BA-C Ceiling Summary
Project: Bldg Activity: BA-DE Design & Engineering Summary
Project: Bldg Activity: BA-DW Doors and Windows Summary
Project: Bldg Activity: BA-E Elevator Summary
Project: Bldg Activity: BA-EXT Exterior Finishes Summary
Project: Bldg Activity: BA-F Foundation Summary
Project: Bldg Activity: BA-FC Floor and Carpeting Summary
Project: Bldg Activity: BA-HVAC HVAC Summary
Project: Bldg Activity: BA-IF Interior Finishes Summary
Project: Bldg Activity: BA-ME Mech/Electrical Summary
Project: Bldg Activity: BA-P Paint Summary
Project: Bldg Activity: BA-PLF Plumbing & Light Fixtures
Summary
Project: Bldg Activity: BA-R Roof Summary
Project: Bldg Activity: BA-S Structure Summary
Project: Bldg Activity: BA701 Foundation Phase Complete
Project: Bldg Activity: BA702 Begin Structural Phase
Project: Bldg Activity: BA741 Close-In Phase Begins
Project: Bldg Activity: BA970 Building Addition Complete

Out-of-sequence activities.......................................0

Activities with Actual Dates > Data Date.........................0

Milestone Activities with invalid relationships..................0

Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................87
# Relationships with other projects..............................0
Data Date........................................................01-Jul-07
Earliest Early Start Date........................................02-Jul-07
Latest Early Finish Date.........................................03-Jan-08
Number of float paths............................................0
Exceptions:
-----------
Critical Activities..............................................26
Project: Bldg Activity: BA-B Brick Summary
Project: Bldg Activity: BA-C Ceiling Summary
Project: Bldg Activity: BA-EXT Exterior Finishes Summary
Project: Bldg Activity: BA-R Roof Summary
Project: Bldg Activity: BA-S Structure Summary
Project: Bldg Activity: BA710 Erect Structural Frame
Project: Bldg Activity: BA712 Floor Decking
Project: Bldg Activity: BA730 Concrete First Floor
Project: Bldg Activity: BA735 Concrete Second Floor
Project: Bldg Activity: BA737 Structure Complete
Project: Bldg Activity: BA750 Brick Exterior Walls
Project: Bldg Activity: BA780 Insulation and Built-up Roofing
Project: Bldg Activity: BA800 Building Enclosed
Project: Bldg Activity: BA850 Install Wiring and Cable
Project: Bldg Activity: BA870 Connect Equipment
Project: Bldg Activity: BA871 Startup and Test HVAC
Project: Bldg Activity: BA880 Rough In Complete
Project: Bldg Activity: BA890 Drywall in Offices
Project: Bldg Activity: BA900 Install Ceiling Grid
Project: Bldg Activity: BA910 Install Floor and Carpeting
Project: Bldg Activity: BA911 Finish Carpentry and Millwork
Project: Bldg Activity: BA940 Touch-up and Clean-up
Project: Bldg Activity: BA941 Test and Balance HVAC Equipment
Project: Bldg Activity: BA950 Finishes Complete
Project: Bldg Activity: BA960 Punch List
Project: Bldg Activity: BA970 Building Addition Complete

Activities with unsatisfied constraints..........................0

Activities with unsatisfied relationships........................0

Activities with external dates...................................0

Activities delayed due to predecessor delay......................0

Activities delayed due to resource leveling......................0

Activities that cannot be leveled................................2


Project: Bldg Activity: BA550 Fabricate and Deliver Heat Pump and
Controls
Project: Bldg Activity: BA620 Fabricate and Deliver Flooring

Activities that are not on any float paths.......................70


Project: Bldg Activity: BA000 Start Office Building Addition
Project
Project: Bldg Activity: BA407 Prepare and Solicit Bids for
Flooring
Project: Bldg Activity: BA408 Review Bids for Flooring
Project: Bldg Activity: BA409 Award Contract for Flooring
Project: Bldg Activity: BA411 Prepare and Solicit Bids for Heat
Pump
Project: Bldg Activity: BA412 Review Bids for Heat Pump
Project: Bldg Activity: BA413 Award Contract for Heat Pump
Project: Bldg Activity: BA421 Prepare and Solicit Bids for Brick
Exterior
Project: Bldg Activity: BA422 Review Bids for Brick
Project: Bldg Activity: BA423 Award Contract for Brick
Project: Bldg Activity: BA450 Assemble Brick Samples
Project: Bldg Activity: BA469 Assemble Technical Data for Heat
Pump
Project: Bldg Activity: BA470 Review Technical Data on Heat Pumps
Project: Bldg Activity: BA480 Assemble and Submit Flooring
Samples
Project: Bldg Activity: BA501 Review and Approve Designs
Project: Bldg Activity: BA530 Review and Approve Brick Samples
Project: Bldg Activity: BA550 Fabricate and Deliver Heat Pump and
Controls
Project: Bldg Activity: BA560 Review and Approve Flooring
Project: Bldg Activity: BA600 Deliver Brick
Project: Bldg Activity: BA620 Fabricate and Deliver Flooring
Project: Bldg Activity: BA630 Begin Building Construction
Project: Bldg Activity: BA640 Site Preparation
Project: Bldg Activity: BA650 Excavation
Project: Bldg Activity: BA660 Install Underground Water Lines
Project: Bldg Activity: BA670 Install Underground Electric
Conduit
Project: Bldg Activity: BA680 Form/Pour Concrete Footings
Project: Bldg Activity: BA681 Concrete Foundation Walls
Project: Bldg Activity: BA690 Form and Pour Slab
Project: Bldg Activity: BA700 Backfill and Compact Walls
Project: Bldg Activity: BA701 Foundation Phase Complete
Project: Bldg Activity: BA702 Begin Structural Phase
Project: Bldg Activity: BA710 Erect Structural Frame
Project: Bldg Activity: BA712 Floor Decking
Project: Bldg Activity: BA720 Erect Stairwell and Elevator Walls
Project: Bldg Activity: BA730 Concrete First Floor
Project: Bldg Activity: BA731 Concrete Basement Slab
Project: Bldg Activity: BA735 Concrete Second Floor
Project: Bldg Activity: BA737 Structure Complete
Project: Bldg Activity: BA741 Close-In Phase Begins
Project: Bldg Activity: BA750 Brick Exterior Walls
Project: Bldg Activity: BA770 Install Door and Window Frames
Project: Bldg Activity: BA780 Insulation and Built-up Roofing
Project: Bldg Activity: BA790 Install Exterior Doors and Windows
Project: Bldg Activity: BA800 Building Enclosed
Project: Bldg Activity: BA809 Rough-In Phase Begins
Project: Bldg Activity: BA810 Set Mechanical and Electrical
Equipment
Project: Bldg Activity: BA820 Install HVAC Ducts
Project: Bldg Activity: BA830 Insulate Ducts
Project: Bldg Activity: BA831 Set Heat Pump
Project: Bldg Activity: BA840 Rough-In Plumbing/Piping
Project: Bldg Activity: BA850 Install Wiring and Cable
Project: Bldg Activity: BA860 Install Elevator Rails and
Equipment
Project: Bldg Activity: BA870 Connect Equipment
Project: Bldg Activity: BA871 Startup and Test HVAC
Project: Bldg Activity: BA880 Rough In Complete
Project: Bldg Activity: BA890 Drywall in Offices
Project: Bldg Activity: BA900 Install Ceiling Grid
Project: Bldg Activity: BA901 Install Lighting Fixtures
Project: Bldg Activity: BA902 Install AC Grills and Registers
Project: Bldg Activity: BA910 Install Floor and Carpeting
Project: Bldg Activity: BA911 Finish Carpentry and Millwork
Project: Bldg Activity: BA912 Install Plumbing Fixtures
Project: Bldg Activity: BA913 Install Elevator Cab and Finishes
Project: Bldg Activity: BA930 Paint Building Interior
Project: Bldg Activity: BA940 Touch-up and Clean-up
Project: Bldg Activity: BA941 Test and Balance HVAC Equipment
Project: Bldg Activity: BA950 Finishes Complete
Project: Bldg Activity: BA960 Punch List
Project: Bldg Activity: BA970 Building Addition Complete
Project: Bldg Activity: BA983 Relocate HVAC Chiller

Вам также может понравиться