Вы находитесь на странице: 1из 1

SIDE RUNNER ELEVATION ALONG GRID C

SECTION ALONG GRID 6 (AS DRAWN)


SECTION ALONG GRID 1 (OPP. HAND)

SIDE RUNNER ELEVATION ALONG GRID A

SECTIONAL ELEVATION ALONG GRID 2 & 5

VIEW 1-1

ISSUED FOR CONSTRUCTION

2 18.10.19 ISSUED FOR CONSTRUCTION R.R. Y.T. M.K.S.

1 15.07.19 GENERALLY REVISED Y.T. M.K.S.


0 08.01.19 RELEASED FOR APPROVAL R.R. A.S. M.K.S.
TYP. DETAIL OF GUTTER FIXING REV DATE DESCRIPTION DRAWN CHECKED APPROVED
' ' CHERIFIENNE
SOCIETE ' D'ENGRAIS ET
CLIENT:
DE PRODUITS CHIMIQUES

PROJECT: 50 MTPD CAPACITY (CL2 BASIS) CHLOR ALKALI PLANT

TITLE: ELEVATION OF UTILITY SHED

PROJECT No. SCALE DRAWING NO. SHEET REV.


9650 100 9650-11-CSG-000-0010 2 2
SIDE RUNNER ELEVATION ALONG GRID 6 (AS DRAWN)
ENGINEERING & TURN KEY CONTRACTOR
SIDE RUNNER ELEVATION ALONG GRID 1 (OPP. HAND) NUBERG ENGINEERING LTD.
SECTIONAL ELEVATION ALONG GRID 3 & 4 A-38H, SECTOR-64, NOIDA - 201301 U.P (INDIA)

This drawing is the property of Nuberg Engineering Ltd & should be used only in reference to contracts
of proposals of the company reproduction of this drawing or unauthorized use is prohibited

PLOTTED ON: 19 October 2019 06:03:48 SHEET SIZE-A1 (841 x 594)

Вам также может понравиться