: 01
Dated : 10-04-2016
CLIENT : ABUDHABI COMPANY FOR ONSHORE OIL OPERATION (ADCO) Prepared By : MF
Checked By : SH
MAIN CONTRACTOR: PIVOT ENGINEERING & GENERAL CONTRACTING
INSTRUMENT SCHEDULE
INSTRUMENT
Sr.
TAG NUMBER SERVICE LINE / EQUIPMENT TAG LOCATION CALIBRATION OPERATING REV
No. INSTRUMENT TYPE MAKE MODEL RANGE Eng. Units
RANGE / SET PT VOLTAGE
Endress & PROMAG 10L
1 02-90-FT-25-01-01 Sewage Lifting's Pumps Discharge EM Flow DN150 / PVC Field Electromagnetic 0-120 20 to 600 m3/hr 24 VDC 0
Hauser 10L1F-QL1A1AG4A5AA
Sensor - CPF81D-7LH11
PH Sensor & Endress &
15 02-90-AIT-25-01-01 Aeration Tank-1 (Settling Tank-1) Outlet PH Open Tank Field Transmitter -CM442-AAM1A2F060A+AA 0-10 0 to 14 PH 24 VDC 0
Transmitter Hauser
Cable - CYK10-A151
Sensor - CPF81D-7LH11
PH Sensor & Endress &
16 02-90-AIT-25-02-01 Aeration Tank-2 (Settling Tank-2) Outlet PH Open Tank Field Transmitter -CM442-AAM1A2F060A+AA 0-10 0 to 14 PH 24 VDC 0
Transmitter Hauser
Cable - CYK10-A151
Page 1
PROJECT: SUPPLY, TESTING AND COMMISSIONING OF STP EFLOCT 710m3/day Revision No. : 01
Dated : 10-04-2016
CLIENT : ABUDHABI COMPANY FOR ONSHORE OIL OPERATION (ADCO) Prepared By : MF
Checked By : SH
MAIN CONTRACTOR: PIVOT ENGINEERING & GENERAL CONTRACTING
INSTRUMENT SCHEDULE
Aeration Tank-1 (Settling Tank-1) Outlet MLSS Sensor & Endress & Sensor - CUS51D-AAD1A4
21 02-90-AIT-25-07-01 Open Tank Field 0-6 0 to 300 g/l 24 VDC 0
MLSS Transmitter Hauser Transmitter -CM442-AAM1A2F060A+AA
Aeration Tank-2 (Settling Tank-2) Outlet MLSS Sensor & Endress & Sensor - CUS51D-AAD1A4
22 02-90-AIT-25-08-01 Open Tank Field 0-6 0 to 300 g/l 24 VDC 0
MLSS Transmitter Hauser Transmitter -CM442-AAM1A2F060A+AA
Sensor - CUS52D-AA1BA4
Turbidity Sensor & Endress &
23 02-90-AIT-25-XX-XX Multi Media Filters Outlet Turbidity DN100 / PVC Field Transmitter -CM442-AAM1A2F060A+AA 0-2 0.000 to 4000 FNU 24 VDC 0
Transmitter Hauser
Flowfit - CUA252-AAB311
Endress &
24 02-90-LSLL-25-02-01 Sewage Lifting Tank Level LO LO Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
25 02-90-LSL-25-08-01 Sewage Lifting Tank Level LO Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
26 02-90-LSH-25-04-01 Sewage Lifting Tank Level HI Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
27 02-90-LSHH-25-02-01 Sewage Lifting Tank Level HI HI Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
28 02-90-LSLL-25-03-01 Sewage Balancing Tank Level LO LO I Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
29 02-90-LSL-25-08-02 Sewage Balancing Tank Level LO Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
30 02-90-LSH-25-04-02 Sewage Balancing Tank Level HI Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
31 02-90-LSHH-25-02-02 Sewage Balancing Tank Level HI HI Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
32 02-90-LSL-25-08-03 Chlorine Contact Tank Level LO Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
33 02-90-LSH-25-04-03 Chlorine Contact Tank Level HI Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
34 02-90-LSL-25-08-04 Sludge Holding Tank Level LO Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
35 02-90-LSH-25-04-04 Sludge Holding Tank Level Hi Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
36 02-90-LSL-25-08-05 TSE Tank Level LO Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
37 02-90-LSH-25-04-05 TSE Tank Level HI Open Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
38 02-90-LSL-25-08-06 Odour Dosing Tank Level LO Closed Tank Field Dosing Switch 52010124 + 52010125 + 52010126 + 52010127 - 0-5 m 24 VDC 0
Hauser
Endress &
39 02-90-LSL-25-08-07 Pre Chlorination Dosing Tank Level LO Closed Tank Field Dosing Switch 52010124 + 52010125 + 52010126 + 52010127 - 0-5 m 24 VDC 0
Hauser
Endress &
40 02-90-LSL-25-08-08 Post Chlorination Dosing Tank Level LO Closed Tank Field Dosing Switch 52010124 + 52010125 + 52010126 + 52010127 - 0-5 m 24 VDC 0
Hauser
Endress &
41 02-90-LSL-25-08-09 Drain Sump Tank Level LO Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
42 02-90-LSH-25-04-06 Drain Sump Tank Level HI Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Endress &
43 02-90-LSHH-25-02-03 Drain Sump Tank Level HI HI Closed Tank Field Float Switch 71035520 + 52010125 + 52010126 + 52010127 - 0-20 m 24 VDC 0
Hauser
Page 2
PROJECT: SUPPLY, TESTING AND COMMISSIONING OF STP EFLOCT 710m3/day Revision No. : 01
Dated : 10-04-2016
CLIENT : ABUDHABI COMPANY FOR ONSHORE OIL OPERATION (ADCO) Prepared By : MF
Checked By : SH
MAIN CONTRACTOR: PIVOT ENGINEERING & GENERAL CONTRACTING
INSTRUMENT SCHEDULE
Indicator - 233.30
44 02-90-PI-25-07-01 Sewage Lifting Pump-1 Discharge Pressure ∅4" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Snubber - 910.12
Indicator - 233.30
45 02-90-PI-25-07-02 Sewage Lifting Pump-2 Discharge Pressure ∅4" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Snubber - 910.12
Indicator - 233.30
46 02-90-PI-25-07-03 Sewage Lifting Pump-3 Discharge Pressure ∅4" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Snubber - 910.12
47 02-90-PI-25-07-04 Air Blower-1 Discharge Pressure ∅4" / GI Field Indicator Wika Indicator - 232.30 0-1 0-1 Bar - 0
48 02-90-PI-25-07-05 Air Blower-2 Discharge Pressure ∅4" / GI Field Indicator Wika Indicator - 232.30 0-1 0-1 Bar - 0
49 02-90-PI-25-07-06 Air Blower-3 Discharge Pressure ∅4" / GI Field Indicator Wika Indicator - 232.30 0-1 0-1 Bar - 0
Indicator - 233.30
53 02-90-PI-25-07-10 Sludge Transfer Pump-1 Discharge Pressure ∅2" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Diaphragm Seal -L990.TB.N4F.N4F.SS.SS.0.SS.2500.
Indicator - 233.30
54 02-90-PI-25-07-11 Sludge Transfer Pump-2 Discharge Pressure ∅2" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Diaphragm Seal -L990.TB.N4F.N4F.SS.SS.0.SS.2500.
Indicator - 233.30
55 02-90-PI-25-07-12 Filter Feed Pump-1 Suction Pressure ∅2" / uPVC Field Indicator Wika -1 to +1 -1 to +1 Bar - 0
Snubber - 910.12
Indicator - 233.30
56 02-90-PI-25-07-13 Filter Feed Pump-2 Suction Pressure ∅2" / uPVC Field Indicator Wika -1 to +1 -1 to +1 Bar - 0
Snubber - 910.12
Indicator - 233.30
57 02-90-PI-25-07-14 Filter Feed Pump-3 Suction Pressure ∅2" / uPVC Field Indicator Wika -1 to +1 -1 to +1 Bar - 0
Snubber - 910.12
Indicator - 233.30
58 02-90-PI-25-07-15 Filter Feed Pump-1 Discharge Pressure ∅2" / uPVC Field Indicator Wika 0-6 0-6 Bar - 0
Snubber - 910.12
Indicator - 233.30
59 02-90-PI-25-07-16 Filter Feed Pump-2 Discharge Pressure ∅2" / uPVC Field Indicator Wika 0-6 0-6 Bar - 0
Snubber - 910.12
Indicator - 233.30
60 02-90-PI-25-07-17 Filter Feed Pump-3 Discharge Pressure ∅2" / uPVC Field Indicator Wika 0-6 0-6 Bar - 0
Snubber - 910.12
61 02-90-PI-25-07-18 Media Filter-1 Outlet Pressure ∅3" / uPVC Field Indicator Wika Indicator - 233.30 0-6 0-6 Bar - 0
62 02-90-PI-25-07-19 Media Filter-2 Outlet Pressure ∅3" / uPVC Field Indicator Wika Indicator - 233.30 0-6 0-6 Bar - 0
63 02-90-PI-25-07-20 Media Filter-3 Outlet Pressure ∅3" / uPVC Field Indicator Wika Indicator - 233.30 0-6 0-6 Bar - 0
Indicator - 233.30
64 02-90-PI-25-07-21 Drain Sump Pump-1 Discharge Pressure ∅3" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Snubber - 910.12
Indicator - 233.30
65 02-90-PI-25-07-22 Drain Sump Pump-2 Discharge Pressure ∅3" / uPVC Field Indicator Wika 0-2.5 0-2.5 Bar - 0
Snubber - 910.12
Page 3
PROJECT: SUPPLY, TESTING AND COMMISSIONING OF STP EFLOCT 710m3/day Revision No. : 01
Dated : 10-04-2016
CLIENT : ABUDHABI COMPANY FOR ONSHORE OIL OPERATION (ADCO) Prepared By : MF
Checked By : SH
MAIN CONTRACTOR: PIVOT ENGINEERING & GENERAL CONTRACTING
INSTRUMENT SCHEDULE
Temperature Indicator -S5550 / 4
67 02-90-TI-25-01-02 Air Blower-2 Discharge Temperature ∅4" / GI Field Indicator Wika 0 -160 0 -160 Deg C - 0
Thermowell-TW15
Page 4