SUMMARY OF ESTIMATED COST
JE AE Executive Engineer
Analysis of Rate as per PWD SOR Block Bhatwari Distt. :- Uttarkashi
PROTECTION WORK
29 Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
T&P etc required for proper completion of work.
1443.75
12% of basic rate 173.25
Total Rm 173.25
4 Structural Design Consultancy
Rate of suspension bridge more than 130 m span
as letter of CE L1 PWD dated 24-07-2010
6000 per mt
Add 19% index 1140
Total 7140 per Mt
or 0.071 lac per RMT
JE AE EE
dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢ vUrxZr
fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny >wyk iqy dk
fuekZ.k
BILL dk;Z A
OF QUANTITY
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
1 Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
T&P etc required for proper completion of work.
Total 80034061.16
Say 80034061.00
dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢ vUrxZr
fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny >wyk iqy dk
fuekZ.k dk;Z A
DETAILS OF MEASUREMENT
Wt. @ 1.20 Qtl / cum of Item no. 3 2308.50 1.20 2770.20 QtI
Wt. @ 0.80 Qtl. / cum of Item no. 5 37.10 0.80 29.68 QtI
0.25% of item no 7 51.00 0.0025 78.50 10.01 QtI
Total 2809.89 QtI
Say 28.10 MT
JE AE
Unit
484730296 12-5-4
Unit
114X2
57X2
114X2
Unit
290.00
190.00
180.00 48024
199.85
dk;Z dk uke &% tuin mRrjdk“kh ds fodkl [k.³ HkVok³h d¢ vUrxZr
fMMlkjh esa HkkxhjFkh unh ij 150 eh0 Liku dk iSny >wyk iqy dk
fuekZ.k dk;Z A
BILL OF QUANTITY
S.No. Item of Work Qty. Unit Rate Unit Amount (in Rs.)
Earthwork in foundation for R/wall,B/wall in all
types of soils,rocks i/c lead,lift & disposal of
surplus excavated material i/c s/o all m/l,Labour
1 T&P etc required for proper completion of work.
TOTAL 21537030.00
SAY 21537030.00
PROTECTION WORK
DETAILS OF MEASUREMENT
S.N. ITEM OF WORK NO. L B H/D Qty. Unit
TOTAL 597691.00
SAY 597691.00
APPROACH ROAD
DETAILS OF MEASUREMENT
15 Supply and febrication of bridge (Nut & Bolts) Ton 65323.50 30410 16-8
16 Fabrication and supply of main cable cIa imps
for 6 Nos 44mm dia wire rope i/c cutting, filling,
machining drilling holes i/c one coat of
anticorosive red oxide paint confirming to IS 102
i/c all T&P nuts, bolts washers etc. i/c supply
and fixing of shop rivets cutting, threading etc.
reffeed as per drawing i/c supply of all material,
labour and T&P etc. required for proper
completion of the work.
#REF! 65.32 30411 16-8
17 Fabrication and supply of wind cable clamps for
2 Nos 44mm dia wire ropes as per drawing. i/c
cutting, filling, machining drilling holes. i/c one
coat of anti corrosive red oxide paint confirming
to IS 102 i/c supply of all material labours and
T&P etc. required for proper completion of the
work.
#REF! 65.32 30411 16-8
18 Supply fabrication and fixing of CI saddle for 6
Nos wire ropes as per detail drawing i/c cutting,
filling, machining etc. i/c one coat of anti
corrosive red oxide paint confirming to IS 102 i/c
all T&P nuts, boltswashers etc, i/c supply of all
material labours and T&P etc. required for
proper completion of the work.
No. 173204.00 Not In SOR
19 Supply and fixing of MS clips for 18mm dia
suspender as per detail drawing i/c supply
of all material, labour T&P etc. required
for proper completion of the work.
Nos. 143.00 Not In SOR
20 Supply and fixing of bull dog clamps (U Clamps)
for 44mm dia wire ropes as per detail drawing i/c
supply of all material, labour and T&P etc.
required for proper comoletion of the work.
Nos. 503.00 Not In SOR
21 Supply of wire ropes up to work site
manufactured as per IS 1835-1976 and general
requirement as per IS 6594-2008 i/c supply of all
material, labour and T&P etc. required for proper
completion of the work.
Rm 1570.50 Not In SOR
22 Providing, fitting and fixing mild steel railing
complete required for proper completion of the
work. Rm. 2207.20 33851 19-8
23 Tow coat painting on each part of bridge with
enamel paint. Over prime coat SI No 414 i/c
supply of all material, labour and T&P etc.
required for proper completion of the work.
Job 134000.00 L.S.
24 Errectiori of Steel Truss bridge i/c supply of all
material, labours and T&P etc. required for
proper completion of the work. (For suspension
bridge 75% rates of Steel Truss bridge)
B Main anchor girder 8x I x 0.60 x 0.60 2.88 Sqm @ 196.20 Kg/Sqm 565.06 Kg
25mm thick bed plate 4x 2 x 4.05 x 32.40 Rm @ 49.40 Kg/Rm 1600,56 Kg
ISMC 400 2 Nos back to back 4x 2 x 0.30 x 4.05 9.72 Sqm @ 196.20 Kg/Sqm 1907.06 Kg
Top plate 25mm thick 4x 2 x 0.37 x 4.05 11.99 Sqm @ 94.20 Kg/Sqm 1129.27 Kg
Flange plate 12mm thick 4x 2 x 125.00 x 1000.00 Rm @ 0.25 Kg/Rm 250.00 Kg
Rivets bottom and top 4x 2 x 125.00 x 1000.00 Rm @ 0.25 Kg/Rm 250.00 Kg
Main anchor rod 100mm dia 6x 2 x 1.70 x 20.40 Rm @ 61.66 Kg/Rm 1257.86 Kg
Side plate 25mm thick fork 6x 2 x 1.10 x 13.20 Rm @ 61.66 Kg/Rm 813.90 Kg
Pin 100mm dia 500mm tong for pulley 24 x 1 x 1.71 x 0.20 8.21 Sqm @ 196.20 Kg/Sqm 1610.41 Kg
(bolts and Nuts) 24x 1 x x 24.00 Nos. @ 30.83 Kg/Nos 739.92 Kg
Nuts for 100 mm dia anchor rod. foundation bolts
40mm dia and 450mm ng 24x 2 x x 48.00 Nos. @ 13.25 Kg/Nos 636.00 Kg
foundation bolts 40mm dia and 900mm 24x 3 x x 72.00 Nos. @ 13.25 KgJNos 954.00 Kg
Nuts for above 8x 4 x x 32.00 Nos. @ 4.44 Kg/Nos 142.08 Kg
8x 2 x x 16.00 Nos. @ 8.87 Kg/Nos 141.92 Kg
48x 2 x x 96.00 Nos. @ 7.00 Kg/Nos 672.00 Kg
Total 12670.06 Kg
Say 12.67 MT
C Wind Anchor girder.
25mm thick bed plate 4x 2 x 0.45 x 0.55 1.98 Sqm @ 196.2 Kg/Sqm 388.48 Kg
25mm thick fork 4x 2 x 1.71 x 0.2 2.74 Sqm @ 196.2 Kg/Sqm 536.8 Kg
ISMC 200 (2 Nos back to back) 4x 2 x 1.8 x 14.4 Rm @ 22.10Kg/Sqm 318.24 Kg
Top and bottom plate 20mm thick
flange. 4x 2 x 0.2 x 1.8 2.88 Sqm @ 157 Kg/Sqm 452.16 Kg
Rivets 28 x 8 x x 224 Nos @ 0.33Kg/Sqm 73.92 Kg
Bolts 8x 4 x x 32 Nos @ 4.0 Kg/Sqm 128 Kg
Lower cable anchor girder ISMC x x
2x 1 x x 5 Rm @ 22.10 Kg/Sqm 110.5 Kg
Nuts for 100mm dia anchor rod 8x 3 x x 24 Nos @ 13.25 Kg/Sqm 318 Kg
Pin 100 mm dia 500 mm long for x x
pulley (bolts and Nuts) 8x 1 x x 8 Nos @ 30.83Kg/Sqm 246.64 Kg
8x 2 x x 16 Nos @ 13.25Kg/Sqm 212 Kg
Foundation bolts 40mm dia and x x
450mm long 6x 4 x x 24 Nos @ 4.44 Kg/Sqm 106.56 Kg
Foundation bolts 40mm dia and x x
900mm long 6x 2 x x 12 Nos @ 8.87 Kg/Sqm 106.44 Kg
Nuts for above 36 x 2 x x 72 Nos @ 7.0 Kg/Sqm 504 Kg
Total 3501.74 Kg
Say 3.50 MT
G-Total 66.97 MT
Say 67.00 MT
15 Supply and fabrication of structural steel confirming
to IS 226 and fabrication of steel suspension bridge
as per detail drawing and MoRTH specification No
1904 i/c one coat of anticorosive red oxide paint
confirming to IS 102 i/c all T&P nuts, bolts, washers
etc. ilc supply
and fixing of shop rivets cutting and threading etc.
reffered as per drawing i/c supply of all material,
labour and T&P etc. required for proper completion
of the work.
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
Some cells or styles in this workbook contain formatting that is not supported 15
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003