Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment LOCATION:
Contractor :- -Passenger hoist lift

Sl Basic Job Potential Conseque Current control measure

Proba
Init Ad

Proba
bility

Resid
Risk rating Ri

risk
ual
bility
No. Steps Hazard nce ial diti s
Ris on k
k al ra
P E A R P E A R
con ti
n
Barricade the area by caution tape trol
Making of
Fall of g
1 passenger hoist Get Injury 1 0 0 0 2 2 me
excavated pit
foundation
Foundation will be made as per construction drawing & asu
certified by competent person from simplex site re

Use only Tested slings/Fixing devices


Shifting of Failure of
2 materials by slings/Fixing Get Injury Before lifting it should ensured that lifted load must be 1 0 0 0 2 2
Hydra devices equally balanced
Deployment only skill workmen
Use of proper ppe

Only authorised persons are allow for operating the


Tower crane
Only trained persons are allow for signaling & signal
man must be worned floroscent jacket
Fixing of parts Deployment only skill workmen
Unauthorised Fatality/Machin
3 with the help of
driving ery Damaged Use of proper ppe 2 0 0 1 2 4
Tower crane
To provide safemeans of access/Provided ladder in
side of passenger lift
Materials lifting should be done as per load chart
There should be good communication system between
Tower Crane operator & other workmen

Drilling on Not proper holes Man


Drilling done as per insutructed by Meka Ster
4 holes&fixing in preheater fatality/Machine
compony 1 0 0 1 2 2
anchor bolts building ry Damaged

Damage of Provided interlock system in passenger lift


In case of cutt off Stop the lift in
5 power supply
cable line or
case of motion 1 0 0 1 2 2
Electric motor Have mechanical arragement for go down when power
is cutt
Provide elctrical safety as per manual
Providing
Connection of Get There should not be any high voltage line present
6
Electric Supply to
Electric shock
Injury/Fatality within 5.2m.radius of the passenger hoist top 2 0 0 1 2 4
passenger Hoist Inbuilt safemeans of access must be required for
ascending and descending

Prepaired by: Approved by: Reviwed by:


Contractor Contractor
Date Date Date
Prepaired by Approved By Reviewed By