0 оценок0% нашли этот документ полезным (0 голосов)
36 просмотров1 страница
This document is a running bill for construction work. It lists the name of the work, contractor, sanctioning authority, acceptance authority, estimate amount, start date, measurements, items, rates, and amounts. Signatures are included from the executive construction/sub-engineer and regional engineer to approve the bill.
This document is a running bill for construction work. It lists the name of the work, contractor, sanctioning authority, acceptance authority, estimate amount, start date, measurements, items, rates, and amounts. Signatures are included from the executive construction/sub-engineer and regional engineer to approve the bill.
This document is a running bill for construction work. It lists the name of the work, contractor, sanctioning authority, acceptance authority, estimate amount, start date, measurements, items, rates, and amounts. Signatures are included from the executive construction/sub-engineer and regional engineer to approve the bill.
Name of Work : ____________________________________________________
Name of Contractor: ____________________________________________________ Authority of Sanction Authority of Acceptance Amount of Estimate Date on which work commenced Measurement vide page MB NO : Estimated Executed Quantity Quantity ITEMS Rate Per Amount