(IS : 1892 ‐ 1997)
CLIENT
Executive Engineer, State Road Project Division, Vadodara
LOCATION
Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63
NAME OF WORK
Design Consultancy Services for Engineering, Procurement and Construction
(EPC) Contract for the work of ʺConstruction / Upgradation of Dhoridungri ‐
Garasiyawada (Km 0+000 to 12+338 ) section of VR / MDR & Construction /
Rehabilitation Lunawada ‐ Garasiyawada ( Km 0+006 to 13+937 ) section of SH‐63 ʺ
GEO TEST HOUSE
( A Division of Geo Designs & Research Pvt Ltd.)
JOB NO.1455/181006 1 of 53
BRIEF DETAIL OF PROJECT SITE
ClIENT : Executive Engineer, State Road Project Division, Vadodara
EPC CONTRACTOR : Shiwalay Infra Projects Pvt Ltd
CONSULTANT : ‐‐
NAME OF WORK : Design Consultancy Services for Engineering, Procurement and Construction (EPC)
Contract for the work of ʺConstruction / Upgradation of Dhoridungri ‐ Garasiyawada
(Km 0+000 to 12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada ‐
Garasiyawada ( Km 0+006 to 13+937 ) section of SH‐63 ʺ
REF.No. : ‐‐
BOREHOLE ID : A‐1, P‐1 to P‐10, A‐2
WATER TABLE : Encountered
BOREHOLE DIA : 150mm
BENTONITE : Not Applicable
TYPE OF BORING : Calyx Rotary Drilling Machine
Not
TYPE OF CASING :
Applicabl
NO. OF BORE
: Twelve
HOLE DIA OF CASING : Not Applicable
FIELD WORK TYPE OF CASING : 0
: 26/09/2019
STARTING DATE
FIELD WORK DIA OF CASING : 0
: 09/01/2020
COMP. DATE
JOB NO.1455/181006 2 of 53
1.0 INTRODUCTION
Sub surface investigation and laboratory tests for Design Consultancy Services for Engineering,
Procurement and Construction (EPC) Contract for the work of ʺConstruction / Upgradation of
Dhoridungri ‐ Garasiyawada (Km 0+000 to 12+338 ) section of VR / MDR & Construction /
Rehabilitation Lunawada ‐ Garasiyawada ( Km 0+006 to 13+937 ) section of SH‐63 ʺ was reffered
us by Shiwalay Infra Projects Pvt Ltd .
The objective of the exploration work was to determine the probable sub surface conditions such
as stratification, denseness or hardness of the strata, position of ground water table etc. and
to evaluate probable range of safe bearing capacity
Twelve borehole executed up to the depth of max. of 25.5 mtr below Existing Ground in
order to know the sub surface stratification, conducting necessary field tests and to collect
disturb and undisturbed soil samples for laboratory testing.
Testing soil / rock samples in the laboratory to determine its physical and engineering
properties of the soil / rock samples, and
Analyzing all field and laboratory data to evaluate safe bearing capacity of the soil for given
foundation sizes and necessary recommendations for foundation design and construction.
The site is located at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63
The actual field investigation work was started on 26/09/2019 and Completed on Dated
09/01/2020.
1.1 SUMMARY OF BOREHOLES :
Field work of executed boreoles is summarised as follows,
Depth of
Sr. Borehole Field work Field work Water table (below
Location investigation in
no. ID started on completed on EGL) in mtr
mtr
1 A‐1 05/01/2020 09/01/2020 14.0 mtr 19.5 mtr
JOB NO.1455/181006 4 of 53
2.0 SUB SURFACE EXPLORATION
2.1 DRILLING:
Twelve borehole of 150mm diameter are drilled upto max. of 25.5 mtr .The work was in general
accordance with IS: 1892 – 1997.
2.1.1 DISTURBED SAMPLES:
Disturbed representative samples were collected, logged, labelled and placed in polythene bags.
2.1.2 UNDISTURBED SAMPLES:
Undisturbed soil samples are collected in 80/100 mm diameter thin walled sampler (Shelby tube) from the
borehole. The sampler used for the sampling had smooth surface and appropriate area ratio and cutting
edge angle thereby minimizing disturbance of soil during sampling. Samples are logged and labelled
properly and transfer to the laboratory for further testing.
2.1.3 WATER TABLE:
Water table was encountered during the sub soil exploration work carried out in the month of Nov‐2019
Water level fluctuations due to seasonal variations, amount of rainfall, runoff and other factors were not
evident at the time of filed work. Trapped or ʺPerchedʺ water could occur within low permeable strata.
2.1.3 METHOD OF SAMPLING:
Sampler is coupled together with a sampler head to form a sampling assembly. The sampler head provide
a non‐flexible connection between the sampling tube and the drill rods. Vent holes are provided in the
sampler head to allow escape of water from the top of sampler tube during penetration. The sampling
tubes are made free from dust and rust. Coating of oil is applied on both sides to obtain the undisturbed
samples in best possible manner.
The sampler is then lowered inside the bore hole on a string of rods and driven to a pre‐determined level.
On completion of driving the sampler is first rotated within the borehole to shear the soil sample at
bottom and then pulled out. Upon removal of the sampling tubes, the length of sample in the tube is
recorded. The disturbed material in the upper end of the tube, if any, is completely removed before
sealing.
The soil at the lower end of the tube is trimmed to a distance of about 10 to 20 mm. After cleaning and
inserting an impervious disc at each end, both ends are sealed. The empty space in the sampler, if any, is
filled with the moist soil, and the ends covered with tight wrapper. The identification mark is then made
on each sample.
JOB NO.1455/181006 5 of 53
2.2 STANDARD PENETRATION TEST:
The standard penetration tests are conducted in each bore as per IS: 2131: 1981 . The split spoon sampler
resting on the bottom of bore hole is allowed to sink under its own weight, then the split spoon sampler
is seated 15 cm with the blows of hammer falling through 750mm. The driving assembly consists of a
driving head and a 63.5 kg weight.
It is ensured that the energy of the falling weight is not reduced by friction between the drive weight and
the guides or between ropes. The rods to which the sampler is attached for driving are straight, tightly
coupled and straight in alignment. Thereafter the split spoon sampler is further driven by 30cm. The
number of blows required to drive each 15cm penetration is recorded. The first 15cm of drive considered
as seating drive. The total blows required for the second and third 15cm penetration is termed as
a penetration resistance ‐ N value. The N‐ values for each bore hole are given in borelogs
3.0 LABORATORY TEST
A. Laboratory Test for Soil
1. Natural Moisture Content Test (IS: 2720, 1992 Part 2)
2. Grain Size Analysis (IS: 2720, 1992 Part 4)
3. Atterberg’s Limits Test (IS: 2720, Part 5 1992)
4. Specific Gravity Test (IS: 2720, Part 3 1992)
5. Free Swell Value Test (IS: 2720, Part 40 1977)
6. Swell Pressure Test (IS: 2720, Part 41, 1977)
7. Triaxial Shear Test (UU) (IS: 2720 Part 11, 1992)
8. Unconfined Compressive Strength of Soil (IS: 2720 Part 10, 1991)
9. Direct Shear Test (IS: 2720, Part 13, 1992)
10. One Dimensional Consolidation Test (IS: 2720 Part 15, 1992)
11. Density & Moisture Content (I S 13030‐1991)
12. Specific Gravity (I S 1122‐1974)
13. Unconfined Compressive Strength of Rock (I S 9143‐1979)
JOB NO.1455/181006 6 of 53
4.a SAFE BEARING CAPACITY FOR OPEN FOUNDATION (FOR LOCATION P‐1)
Looking to the proposed type of project, site conditions and sub soil stratification, RCC Open
Foundation is recommended along with safe bearing capacity and safe bearing pressure at
different depths. Intensity of bearable load determined as soil bearing capacity (SBC) and soil
bearing pressure (SBP) on soil.
SBC BASED ON SHEAR :‐ The ultimate net bearing capacity is evaluated after taking into consideration
of shape factor and depth factor of the foundation in accordance with I.S. 6403-1981. The net bearing
capacity worked out using the following equation.
Following parameters are adopted out of executed bore hole considering worst soil parameter for
the evaluation of bearing capacity for shallow foundation.
Design parameters
Cohesion (kg/cm2) 0
Angle of Internal Friction (Degree) 33
Dry Density ( in gm/cc) 1.8
Specific Gravity 2.69
Factor of Safety 5.0
Void ratio, e (Computed) 0.537
General Shear Failure
Type of Shear Failure Considered
as void ratio is >0.55 and <0.75
JOB NO.1455/181006 7 of 53
Thus,General Shear Failure was considered for safe bearing capacity computation. The net safe bearing capacity for
various sizes of individual footings having vertical static load intensity is evaluated as in TABLE‐ 1 , SAFE
BEARING CAPACITY AND SAFE BEARING PRESSURE .
TABLE‐ 1 , SAFE BEARING CAPACITY AND SAFE BEARING PRESSURE
Foundation Details
Safe Bearing Permissible Settlement Recommended Safe
RL Capacity of 50mm for Isolated Bearing Capacity in
Type Depth (Mtr.) Size in (Mtr.) (SBC) in t/m2 Footing(SBP) in t/m2 t/m2
Note :
2) Angle of internal friction Phi value is taken from fig.1 of IS:6403, considering SPT "N" value of 60 . In case of Highly
Weathered Rock SPT value of 60 is assumed (Ref: IS:2911 part 1, sec 2,2010, note of Cl.B-8) as the Rock is
weathered/fragmented, it is considered as a granular mass to design the foundation on the basis of conventional soil
mechanics (Ref. IS:12070).However for calculation of Safe bearing capacity Phi Value is restricted to 33 degree.
3)In any case, Open foundation shall be minimum embeded 1.5m in rocky strata for rock having UCS less 12.5Mpa but
greater than 2.5Mpa or where it is not possible to take core to get the UCS but extrapolated SPT N value is more than
100 but less than 500 as per clause no705.2.2 of IRC-78-2014.
JOB NO.1455/181006 8 of 53
4.b SAFE BEARING CAPACITY FOR OPEN FOUNDATION
(FOR LOCATIONS EXCEPT P‐1)
Looking to the proposed type of project, site conditions and sub soil stratification, RCC Open Foundation
is recommended along with safe bearing capacity at different depths. Intensity of bearable load
determined as soil bearing capacity (SBC) on rock.
Hence we are recommending a RCC Open Foundation rested on rocky strata as it is encountered at
shallow depth, and safe bearing capacity is considered from unconfined compressive strength of rock
Samples considering empirical coefficient of 0.1 including factor of safety equals to 3.
Qa = Ks *Qu
Where Qu= unconfined compressive strength of rock
Ks= Empirical coefficient (for FOS of 3) = 0.1
Wʹ=Water Table Correction Factor = 0.5
Settlement is negligible as rocky strata encountered.
TABLE: 2 SAFE BEARING CAPACITY & SAFE BEARING PRESSURE
Recommended Safe
Type of Size in Depth in Safe Bearing Capacity
Location RL Bearing Capacity
Foundation m m in t/m2
t/m2
70.720 10.5 72.3 50
A‐1 B>=1 69.220 12.0 157.1 55
67.720 13.5 393.2 60
65.286 3.0 101.5 50
P‐2 B>=1 63.786 4.5 182.6 55
62.286 6.0 206.5 60
65.579 3.0 92.1 45
P‐3 B>=1 64.079 4.5 159.3 50
62.579 6.0 313.9 55
RCC Raft
65.014 3.5 49.1 45
Foundation
P‐4 B>=1 64.014 4.5 107.8 50
62.514 6.0 54.4 50
60.465 7.5 108.4 50
P‐5 B>=1 58.965 9.0 138.7 55
57.465 10.5 336.2 60
57.366 9.5 100.1 50
P‐6 B>=1
55.866 11.0 224.3 55
58.504 4.5 87.2 45
P‐7 B>=1
57.004 6.0 181.4 50
JOB NO.1455/181006 9 of 53
TABLE: 2 SAFE BEARING CAPACITY & SAFE BEARING PRESSURE
Recommended Safe
Type of Size in Depth in Safe Bearing Capacity
Location RL Bearing Capacity
Foundation m m in t/m2
t/m2
59.704 3.0 45.2 45
P‐8 B>=1 58.204 4.5 50.1 50
56.704 6.0 102.2 55
59.704 4.5 81.2 45
P‐9 B>=1
58.204 6.0 94.4 50
RCC Raft
59.204 3.5 56.1 45
Foundation
P‐10 B>=1 58.204 4.5 84.3 50
56.704 6.0 97.2 55
64.590 18.0 46.6 45
A‐2 B>=1 63.090 19.5 62.4 50
61.590 21.0 76.3 55
Note:
In any case, Open foundation shall be minimum embeded 1.5m in rocky strata for rock having UCS less
12.5Mpa but greater than 2.5Mpa or where it is not possible to take core to get the UCS but extrapolated
SPT N value is more than 100 but less than 500 as per clause no705.2.2 of IRC‐78‐2014.
JOB NO.1455/181006 10 of 53
5. (a) SAFE CAPACITY (for Open Foundation)
5. SAFE CAPACITY FOR PILE FOUNDATION ( FOR LOCATION A1 to P‐5)
Looking to the proposed type of project, site conditions R.C.C Pile Foundation is recommended in addition to RCC Open
Foundation along with safe capacity in Compression and Tension.
For Bored Cast in-situ Pile
LOAD CARRYING CAPACITY‐STATIC FORMULA, Qu = Re +Raf = Ksp qc df Ab + As Cus
Qallow = Re/3 + Raf/6 (Ref.IRC:78‐2014 Page No. 79, Method‐1)
Where,
Ksp ‐ imperical co‐efficient (0.3 to 1.2)
qc ‐ average UCS of rock in kg/cm2
df ‐ depth factor = 1.0 + 0.4 (ls/Ds)
Ab ‐ cross sectional area of base of pile in cm2
As ‐ surface area of socket in cm2
Cus ‐ ultimate shear along the socket length = 0.225 (qc)0.5
Table‐1 of Safe Load in Compression of Bored Cast in‐situ Pile
Length of
Length of Pile embedded in SAFE LOAD IN SAFE LOAD IN
Pile Below Pile Dia
TYPE OF PILE Location Rocky strata COMPRESSION UPLIFT
EGL
cm cm cm MT MT
Note:
1) Total safe capacity of the pile calculated above is as per IRC‐78‐2014. It may be used as guideline for initial pile design.However the
working load on the pile should not exceed its structural capacity.
2) The safe load of pile shown in above table are subjected to initial pile load test as per IS Codal provision.
JOB NO.1455/181006 11 of 53
Table‐2 Safe Lateral Capacity of Bored Cast in‐situ Pile
Free Head Fixed Head
Pile Dia
TYPE OF PILE Location Depth of Fixity Lateral Capacity Depth of Fixity Lateral Capacity
cm Mtr MT Mtr MT
Bored Cast in‐
P‐6 120 7.02 33.5 7.95 92.4
situ Pile
Note:
1) The safe load of pile shown in above table are subjected to initial pile load test as per I.S.Codal Provision.
2) Allowable displacement of pile at head is considered as 12mm.
3) Above capacity is based on M40 grade of concrete.
4) As per IS 14593,When the pile is fully embedded in rock, the lateral capacity it can resist is determined by the capacity of its section to
resist shear forces. Wherever rocky strata is encountered from the top or at shallow depth ,fixity of pile can be considered from top of rock.
JOB NO.1455/181006 12 of 53
6. CONCLUSION & RECOMMENDATION
1. The present report covers the Geotechnical investigation carried out of Twelve borehole
location at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63
2. Based on the proposed type of project, bore log data, Laboratory test results safe bearing
capacity of open foundation & Safe capacity of Pile foundation is suggested as shown in table‐
1&2.
3. Effect of Water table was considered in the analysis of SBC.
4. Suitability of Soil for back filling: Excavated rocky material is suitable for backfilling and
the same shall be compacted at 95% of MDD.
5. If at the time of excavation, major solution cavities have been found which have rendered
the ground surface uneven, the depth of foundation should be taken to a level such that 80
percent rock area is available. It must be ensured that the raft does not over hang at any
corner.
6. If after excavation, loose pockets of talus deposit are found out at a few places, the same
should be cleaned and backfilled with lean concrete of M15 Grade.
8. If required, provide proper anchor & anchor ring with base rock below the foundation for
counter the uplift pressure. In soft rock and hard rock anchoring shall be done up to depth of
1.5mtr and 0.6mtr respectively. It is advisable to do so for very poor to medium quality rock.
9. Where Foundation is laid over rock it should be checked for structural stability also.
10. Care to be taken that “Gentle Slope” should be maintained for the deposited excavated
material which should be far away from excavated Foundation trench/pit and necessary
shoring arrangement may be done if required.
JOB NO.1455/181006 13 of 53
11. The above report is based on the soil strata encountered at site upto depth of Investigation
i.e max. of 25.5 mtr.
12. The above recommendations are based on the collected field data, laboratory tests results
conducted on soil samples recovered from the test locations. However if the actual subsoil
condition during execution vary from what has been represented in this report, the
client/agency may be referred to us for suggestions.
For GEO TEST HOUSE, Vadodara.
Authorized Signatory
Jignesh Trivedi
Technical Maneger
JOB NO.1455/181006 14 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : A-1
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 19.5 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 05/01/2020 N 2560869.086 Dia of Borehole : 150mm
10
2
3
1/3 DS/UDS 3.0 3.45 -- -- --
4
8.0 Silty Clay of Low Plasticity
4.5 4.95 17 -- --
17
5 1/4 SPT
6
1/5 DS/UDS 6.0 6.45 -- -- -- UDS Slip
21
8 1/6 SPT 7.5 7.95 21 -- --
10
1/8 Core 9.0 10.5 -- 31.33 11.33
11
13
1/10 Core 12.0 13.5 -- 25.33 8.66
14
JOB NO.1455/181006 15 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : A-1
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 19.5 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 05/01/2020 N 2560869.086 Dia of Borehole : 150mm
16
18
20
21
22
23
24
25
26
27
28
29
30
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By TEST HOUSE
B-10,
DP BC Krishna
2014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 16 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-1
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 15.1 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 26/09/2019 N 2560871.061 Dia of Borehole : 150mm
1
2.0 Boulders with Pebbles & Gravels
2/2 SPT 1.5 -- 3cm/50 bolws Nil Nil
4
2/4 Core/SPT 4.5 6.00 2cm/50 bolws 9 Nil
7
2/6 Core 7.5 9.0 -- 40 26
10
2/8 Core 10.5 12.0 --- 76.66 51
11
13
2/10 Core 13.1 14.1 --- 95 83
14
JOB NO.1455/181006 17 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-2
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 15.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 22/11/2019 N 2560877.518 Dia of Borehole : 150mm
4
3/4 Core 3.0 4.50 --- 34.66 Nil
7
3/6 Core 6.0 7.5 --- 15.33 Nil
8
13.5 Brownish Moderately Weathered Rock
10
3/8 Core 9.0 10.5 --- 68.66 22.66
11
13
3/10 Core 12.0 13.5 --- 24.66 Nil
14
JOB NO.1455/181006 18 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-3
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 24.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 13/11/2019 N 2560884.375 Dia of Borehole : 150mm
4
4/4 Core 3.0 4.5 --- 28 Nil
7
4/6 Core 6.0 7.5 --- 81.33 Nil
8
13.5 Moderately Weathered Rock
10
4/8 Core 9.0 10.5 --- 88 45.33
11
13
4/10 Core 12.0 13.5 --- 40 10.66
14
JOB NO.1455/181006 19 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-3
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 24.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Depth of Casing : #REF!
Garasiyawada section of SH-63
Date of Starting : 13/11/2019 Dia of Borehole : 150mm
16
4/12 Core 15.0 16.5 -- 8 Nil
17
19
Moderately to Slightly Weathered 4/14 Core 18.0 19.5 --- 49.33 Nil
9.0
Rock
20
22
4/16 Core 21.0 22.5 --- 96.66 83.66
23
25
26
27
28
29
30
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
DP BC
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 20 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-4
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 16.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 28/11/2019 N 2560893.043 Dia of Borehole : 150mm
4
5/4 Core 3.0 4.50 --- 60.00 13.33
7
5/6 Core 6.0 7.5 --- 75.33 24.0
9 Grayish Moderately to Slightly 5/7 Core 7.5 9.0 --- 73.33 26.66
12.0
Weathered Rock
10
5/8 Core 9.0 10.5 --- 70.66 27.33
11
13
5/10 Core 12.0 13.5 --- 94.00 46.00
14
JOB NO.1455/181006 21 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-4
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 16.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Depth of Casing : #REF!
Garasiyawada section of SH-63
Date of Starting : 28/11/2019 Dia of Borehole : 150mm
17
18
19
20
21
22
23
24
25
26
27
28
29
15
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
DP BC
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 22 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-5
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 20.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 07/12/2019 N 2560899.774 Dia of Borehole : 150mm
Sand with Pebbles & Gravels 6/2 SPT/DS 1.5 -- 3cm/50 bolws -- --
3.0
( Newly filled material)
2
4
2.0 Silty Sand of Non Plasticity
6/4 SPT/DS 4.5 -- 4cm/50 bolws -- --
5
6/5 SPT/DS 5.0 -- 3cm/50 bolws -- --
7
6/7 Core 6.0 7.5 --- 82.00 15.33
10
10.0 Highly Weathered to Fresh Rock
6/9 Core 9.0 10.5 --- 54.66 Nil
11
13
6/11 Core 12.0 13.5 --- 79.33 50.66
14
JOB NO.1455/181006 23 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-5
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 20.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Depth of Casing : #REF!
Garasiyawada section of SH-63
Date of Starting : 07/12/2019 Dia of Borehole : 150mm
16
19
21
22
23
24
25
26
27
28
29
30
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
DP BC
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 24 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-6
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 17.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 07/12/2019 N 2560899.774 Dia of Borehole : 150mm
47+ 2 cm/
3 7/3 SPT/DS 3.5 -- -- --
50Blows
4
32+ 3 cm/
7/4 SPT/DS 5.0 -- 50Blows
-- --
5
6.0 Silty Sand with Pebbles & Gravels
10cm/ 50
6 7/5 SPT/DS 6.5 -- -- --
bolws
11
Highly Weathered to Moderately 7/8 Core 11.0 12.5 --- 32.66 25.33
7.0
Weathered Rock
12
14
JOB NO.1455/181006 25 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-6
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 17.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Depth of Casing : #REF!
Garasiyawada section of SH-63
Date of Starting : 07/12/2019 Dia of Borehole : 150mm
16
2.0 ModeratelyWeathered Rock 7/11 Core 15.5 17.0 --- 44.00 38.66
17
18
19
20
21
22
23
24
25
26
27
28
29
30
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
AP MP
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 26 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract for
the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to 12+338 )
Project : Borehole : P-7
section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada ( Km 0+006 to
13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 9.3 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 07/01/2020 N 2560899.774 Dia of Borehole : 150mm
1
38+3cm/ 50
8/2 SPT/DS 1.8 -- -- --
2.8 Silty Sand with Pebbles & Gravels bolws
4
8/4 Core 3.3 4.8 -- 36.00 22.00
7
8/7 Core 6.3 7.8 --- 92.66 83.33
10
11
12
13
14
15
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
AP MP
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 27 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-8
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 20.0 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 03/01/2020 N 2560899.774 Dia of Borehole : 150mm
5
2 cm/ 50
9/5 SPT/DS 6.0 7.5 bolws
14.66 Nil
3 cm/ 50
7 9/9 Core 7.5 9.0 bolws
16.66 Nil
8
Highly Weathered to Moderately 2 cm/ 50
14.0 9/8 Core 9.0 10.5 19.33 Nil
Weathered Rock bolws
4 cm/ 50
10 9/9 Core 10.5 12.0 20.00 6.60
bolws
11
2 cm/ 50
9/10 Core 12.0 13.5 bolws
25.33 21.33
12
13
2 cm/ 50
9/11 Core 13.5 15.5 bolws
23.00 21.00
14
15
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
AP MP
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 28 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-9
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 7.5 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 26/12/2019 N 2560899.774 Dia of Borehole : 150mm
1
10/2 SPT/DS 1.5 -- 2cm/50 bolws -- --
3.0 Silty Sand with Pebbles & Gravels
2
4
10/4 Core 3.0 4.5 -- 96.33 54.66
5
4.5 Fresh Rock
7
10/7 Core 6.0 7.5 --- 92.66 89.33
10
11
12
13
14
15
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
AP MP
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 29 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract
for the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to
Project : Borehole : P-10
12+338 ) section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada (
Km 0+006 to 13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 15.5 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 30/12/2019 N 2560899.774 Dia of Borehole : 150mm
1
2.0 Silty Sand with Pebbles & Gravels
11/2 SPT/DS 1.5 -- 3cm/50 bolws -- --
7
11/7 Core 6.0 7.5 -- 40.66 22
11
13
11/9 Core 12.0 13.5 --- 20.00 Nil
14
JOB NO.1455/181006 30 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract for
the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to 12+338 )
Project : Borehole : A-2
section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada ( Km 0+006 to
13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 25.5 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 13/12/2019 N 2560869.086 Dia of Borehole : 150mm
21
2
3
12/4 UDS 3.0 3.45 -- -- --
4.5 4.95 13 -- --
13
5 12/5 SPT
6
6.0 6.45 18 -- -- UDS Slip
18
12/6 UDS/SPT
13.0 Silty Clay of Low Plasticity
7
19
8 12/7 SPT 7.5 7.95 19 -- --
9
19
10
23
12
24
13
14
2.0 Highly Weathered Rock 39 + 2cm /
12/11 SPT 13.5 13.95 -- -- Refusal
50 Blows
15
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
AP MP
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 31 of 53
BORE LOG Job No 1455/181006
(As per IS : 1892-1979, 4453-1980 & 4464-1967)
Design Consultancy Services for Engineering, Procurement and Construction (EPC) Contract for
the work of "Construction / Upgradation of Dhoridungri - Garasiyawada (Km 0+000 to 12+338 )
Project : Borehole : A-2
section of VR / MDR & Construction / Rehabilitation Lunawada - Garasiyawada ( Km 0+006 to
13+937 ) section of SH-63 "
Client : Executive Engineer, State Road Project Division, Vadodara Depth of Borehole : 25.5 mtr
Design Ch.7+008 LHS, Lunawada to
Location : Coordinates Depth of Casing : Not Applicable
Garasiyawada section of SH-63
Date of Starting : 13/12/2019 N 2560869.086 Dia of Borehole : 150mm
3 cm / 50
17 12/13 SPT/Core 16.5 18.0 Blows
4.66 Nil Refusal
18
3 cm / 50
12/14 SPT/Core 18.0 19.5 Blows
9.33 Nil Refusal
19
22
24
26
27
28
29
30
UDS : Undisturbed Sample
DS : Disturbed sample CR : Core Recovery GWT : Ground Water Table
N : Penetration Resistance Value RQD : Rock Quality Designation SPT : Standard Penetration Test
N' :Corrected Penetration Resistance Value PR : Rate of Penetration in Rock WS :Wash Sample
Prepared By Checked / Approved By GEO TEST HOUSE
B-10, Krishna Industrial Estate, Opp. B.I.D.C. Gorwa Estate, Vadodara:-390016,Gujarat, INDIA.
AP MP
Tel :-0265-2290222, Fax :- 0265-2282014 Email :- soilgdr@geogroup.in, lab@geogroup.in
JOB NO.1455/181006 32 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 A‐1
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 1/1 CL 0.0 30.2 18.9 11.3 0 30 70 _ _ 45 _ _ _ _ 2.59 _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 33 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐1
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 2/1 Pebbles & Gravels 0.0 _ _ _ 64 31 5 _ _ Nil _ _ _ _ 2.67 _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 34 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐2
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 3/1 Pebbles & Gravels 0.0 _ _ _ 55 38 7 _ _ Nil _ _ _ _ 2.68 _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 35 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐3
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 4/1 Pebbles & Gravels 0.0 _ _ _ 51 45 4 _ _ Nil _ _ _ _ 2.70 _ _
Abbrivation : ** UCS of Rock From Point Load
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 5/1 Pebbles & Gravels 0.0 _ _ _ 60 28 12 _ _ Nil _ _ _ _ 2.62 _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 37 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐5
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 6/1 Pebbles & Gravels 0.0 _ _ _ 59 39 2 _ _ Nil _ _ _ _ _ _ _
4 6/4 SM 4.5 _ NP NP 0 78 22 _ _ _ _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 38 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐6
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 7/1 Pebbles & Gravels 0.0 _ _ _ 58 36 6 _ _ Nil _ _ _ _ _ _ _
4 7/4 SM 5.0 _ NP NP 0 77 23 _ _ _ _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 39 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐7
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
%
e
2
2
1 8/1 Pebbles & Gravels 0.0 _ _ _ 49 41 10 _ _ Nil _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 40 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐8
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 9/1 Pebbles & Gravels 0.0 _ _ _ 55 41 4 _ _ Nil _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 41 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐9
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
%
e
2
2
1 10/1 Pebbles & Gravels 0.0 _ _ _ 54 43 3 _ _ _ _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 42 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 P‐10
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 11/1 Pebbles & Gravels 0.0 _ _ _ 66 30 4 _ _ _ _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Tested By : BC Checked By :‐ JT
JOB NO.1455/181006 43 of 53
GENERAL SUMMARY OF GEO‐TECHNICAL INVESTIGATION at Design Ch.7+008 LHS, Lunawada to Garasiyawada section of SH‐63 A‐2
Shear Swelling
Settlement
parameter
Absorption
Atterbergʹs Limit Grain Size Analysis
Water
Parameter Parameter F.D.D./R.D/
(mv)
Sp. Gravity
UCS F.M.C.
Sr. Sample Depth B.D
I.S Classification L.L. P.L. P.I. G S M & C C φ F.S. S.P.
No. No. in mt
Kg/cm
Kg/cm
Kg/cm
Degre
gm/cc
cm2/kg
%
e
2
2
1 12/1 CL 0.0 26.1 18.5 7.6 4 29 67 _ _ 25 _ _ _ _ _ _ _
Abbrivation : ** UCS of Rock From Point Load
Calculation of SBC in Rock Sample Calculation
Qa = Ksp x Qu
i.e Qa = safe bearing capacity
Ksp = Empirical Coiefficient (for FOS of 3) = 0.1
Wʹ = Water Table Correction Factor = 0.5
s = Correction for fair orientation of slope = (average value) 0.75
Qu = Unconfined Compression Strength of Rock
Ksp = 0.1
Qu = 203.00 Kg/cm 2
Qa = 10.15 Kg/cm 2
Qa = 101.5 T/m 2
Note:Considering to importance of Project/Structure Conservative approach of analysis
JOB NO.1455/181006 45 of 53
SAFE BEARING CAPACITY OF ROCK as per IS: 12070, 1987
SBC ‐ sheet‐7
Location : P‐3
Calculation of SBC in Rock Sample Calculation
Qa = Ksp x Qu
i.e Qa = safe bearing capacity
Ksp = Empirical Coiefficient (for FOS of 3) = 0.1
Wʹ = Water Table Correction Factor = 0.5
s = Correction for fair orientation of slope = (average value) 0.75
Qu = Unconfined Compression Strength of Rock
Ksp = 0.1
Qu = 184.2 Kg/cm 2
Qa = 9.21 Kg/cm 2
Qa = 92.1 T/m 2
Note:Considering to importance of Project/Structure Conservative approach of analysis
JOB NO.1455/181006 46 of 53
SAFE BEARING CAPACITY OF ROCK as per IS: 12070, 1987
SBC ‐ sheet‐7
Location : P‐5
Calculation of SBC in Rock Sample Calculation
Qa = Ksp x Qu
i.e Qa = safe bearing capacity
Ksp = Empirical Coiefficient (for FOS of 3) = 0.1
Wʹ = Water Table Correction Factor = 0.5
s = Correction for fair orientation of slope = (average value) 0.75
Qu = Unconfined Compression Strength of Rock
Ksp = 0.1
Qu = 277.40 Kg/cm 2
Qa = 13.87 Kg/cm 2
Qa = 138.7 T/m 2
Note:Considering to importance of Project/Structure Conservative approach of analysis
JOB NO.1455/181006 47 of 53
CALCULATION OF PILE CAPACITY SOCKETED IN ROCK
Calculation of safe load capacity of pile due to socketing in rock, (Qs)safe
(IRC:78-2014-Method 1)
Location : A-1
Qu = Re + Raf
= Ksp qc df Ab + As Cus
Qallow = Re/3 + Raf/6
1) Total safe capacity of the pile calculated above is as per IRC-78-2014. It may be used as guideline
for initial pile design.However the working load on the pile should not exceed its structural capacity.
2) The safe load of pile shown in above table are subjected to initial pile load test as per IS Codal
provision.
JOB NO.1455/181006 48 of 53
CALCULATION OF PILE CAPACITY SOCKETED IN ROCK
Calculation of allowable capacity of pile due to socketing in rock, Q allow
(IRC:78-2014-Method 2)
Location : P-1/P-3/P-8/P-10/A-2
Note:
1) Total safe capacity of the pile calculated above is as per IRC-78-2014. It may be used as
guideline for initial pile design.However the working load on the pile should not exceed its
structural capacity.
2) The safe load of pile shown in above table are subjected to initial pile load test as per IS
Codal provision.
3) The extrapolated values of 'N' is limited to 100 in the above analysis.
JOB NO.1455/181006 49 of 53
CALCULATION OF PILE CAPACITY SOCKETED IN ROCK
Calculation of safe load capacity of pile due to socketing in rock, (Qs)safe
(IRC:78-2014-Method 1)
Location : P-2
Qu = Re + Raf
= Ksp qc df Ab + As Cus
Qallow = Re/3 + Raf/6
1) Total safe capacity of the pile calculated above is as per IRC-78-2014. It may be used as guideline
for initial pile design.However the working load on the pile should not exceed its structural capacity.
2) The safe load of pile shown in above table are subjected to initial pile load test as per IS Codal
provision.
JOB NO.1455/181006 50 of 53
Long pile - Preloaded clay - IS method
Location : A-1
DETRMINATION OF DEPTH OF FIXITY,LATERAL CAPACITY AND MAXIMUM MOMENT OF
LATERALLY LOADED PILES (IS 2911 - 2010)
JOB NO.1455/181006 51 of 53
Long pile - Sands and normally loaded clays - IS method
Location : P-6
DETRMINATION OF DEPTH OF FIXITY,LATERAL CAPACITY AND MAXIMUM MOMENT OF
LATERALLY LOADED PILES (IS 2911- 2010)
JOB NO.1455/181006 52 of 53
Long pile - Preloaded clay - IS method
Location : A-2
DETRMINATION OF DEPTH OF FIXITY,LATERAL CAPACITY AND MAXIMUM MOMENT OF
LATERALLY LOADED PILES (IS 2911 - 2010)
JOB NO.1455/181006 53 of 53