Академический Документы
Профессиональный Документы
Культура Документы
DOCUMENTS
Document No : PSM-SP-01
1
CONTROL OF Rev. Date 01st Sept. 10
DOCUMENT
POONGSAN (M) SDN BHD Rev.No. 0
SYSTEM PROCEDURE
Page 2/7
1.0 PURPOSE
To control documents related to the company QMS in terms of approval prior to issue, updating,
changes, revision status, legible, identifiable, distribution and availability at point of use.
To control obsolete documents (properly disposed or identified) in order to prevent unintended use.
2.0 SCOPE
Applicable to all QMS related documentation including documents of external origin which are
necessary for the planning and operation of the QMS.
3.0 DEFINITIONS
Master Copy - Original document
Control Copy - Duplicated copy from original document which shall be updated when
changes / revision to the original occurs
Obsolete Document - Document which is deemed invalid and shall not be used for any
QEMS activities
Uncontrolled Document - Duplicated copy issued for reference purpose only and updating is not
required.
Originator - The first person who promote a proposed new document / procedure.
4.0 REFERENCES
ISO 9001:2008 Clause 4.2.3 (Control of Documents)
Quality Manual (PSM-QM) Section 4
Control Of Record (PSM-SP-02)
5.0 RECORDS
Document Distribution Master List (DDML)
List of External Documents
Document Change Request (DCR)
Doc. No. PSM-SP-01
2
CONTROL OF Rev. Date 01st Sept. 10
DOCUMENT
POONGSAN (M) SDN BHD Rev.No. 0
SYSTEM PROCEDURE
Page 3/7
6.0 PROCEDURE
6.1 DOCUMENT STRUCTURE AND NUMBERING
Note:
3
‘DD’: Departmental code (AD: Admin ; PD: Production ;MS: Marketing)
xx : Running serial number / short code
Rev.No. 0
POONGSAN (M) SDN BHD SYSTEM PROCEDURE
Page 4/7
2. The approver shall review and approve the document ensuring the changes are as per approved
DCR.
3. Upon approval, document shall be submitted to Document Controller for registration.
4
CONTROL OF Doc. No. PSM-SP-01
Rev.No. 0
POONGSAN (M) SDN BHD SYSTEM PROCEDURE
Page 5/7
5
CONTROL OF Doc. No. PSM-SP-01
Rev.No. 0
POONGSAN (M) SDN BHD SYSTEM PROCEDURE
Page 6/7
6
CONTROL OF Doc. No. PSM-SP-01
Rev.No. 0
POONGSAN (M) SDN BHD SYSTEM PROCEDURE
Page 7/7