Вы находитесь на странице: 1из 6

References

Cao, Z., Lee, D. H., & Meng, Q. (2008). Deployment strategies of double-rail-mounted
gantry crane systems for loading outbound containers in container
terminals. International Journal of Production Economics, 115(1), 221-228.

Carlo, H. J., Vis, I. F., & Roodbergen, K. J. (2014a). Storage yard operations in
container terminals: Literature overview, trends, and research
directions. European journal of operational research, 235(2), 412-430.

Carlo, H. J., Vis, I. F., & Roodbergen, K. J. (2014b). Transport operations in container
terminals: Literature overview, trends, research directions and classification
scheme. European journal of operational research, 236(1), 1-13.

Chao, S.-L. And Lin, Y.-J. (2011), Evaluating advanced quay cranes in container
terminals, Transportation Research Part E: Logistics and Transportation Re-
view, 47(4), 432-445

Chen, L., Bostel, N., Dejax, P., Cai, J., & Xi, L. (2007). A tabu search algorithm for the
integrated scheduling problem of container handling systems in a maritime
terminal. European Journal of Operational Research, 181(1), 40-58.

Chen, L., Lange in, A., & Lu, Z. (2013). Integrated scheduling of crane handling and
truck transportation in a maritime container terminal. European Journal of
Operational Research, 225(1), 142-152

Choi, S. H. and Ha, T. Y. (2005), A study on high-efficiency yard handling system for
next generation port, Ocean Policy Research, 20(2), 81-126.

Dulebenets, M. A., Moses, R., Ozguven, E. E., & Vanli, A. (2017). Minimizing carbon
dioxide emissions due to container handling at marine container terminals via
hybrid evolutionary algorithms. IEEE Access, 5, 8131-8147.
Geerlings, H. and van Duin, R. (2011), A new method for assessing CO emissions from
container terminals: a promising approach applied in Rotterdam, Journal of
Cleaner Production, 19(6/7), 657-666.

Gerrits, B., Mes, M., & Schuur, P. (2018, December). A simulation model for the
planning and control of agvs at automated container terminal Winter
Simulation Conference (WSC) (pp. 2941-2952). IEEE.

He, J., Chang, D., Mi, W., & Yan, W. (2010). A hybrid parallel genetic algorithm for
yard crane scheduling. Transportation Research Part E: Logistics and
Transportation Review, 46(1), 136-155.

He, J., Huang, Y., Yan, W., & Wang, S. (2015). Integrated internal truck, yard crane
and quay crane scheduling in a container terminal considering energy
consumption. Expert Systems with applications, 42(5), 2464-2487

Horisson, H., Pennetti, C. A., Andrews, D. J., Hendrickson, D. C., Polmateer, T. L., &
Lambert, J. H. (2019, April). Systems Modeling and Optimization of
Container Ship Berthing with Various Enterprise Risks. In 2019 IEEE
International Systems Conference (SysCon) (pp. 1-8). IEEE.

Hu, H., Chen, X., Wang, T., & Zhang, Y. (2019). A three-stage decomposition method
for the joint vehicle dispatching and storage allocation problem in automated
container terminals. Computers & Industrial Engineering, 129, 90-101.

Javanshir, H., & SEYED, A. G. S. (2010). Yard crane scheduling in port container
terminals using genetic algorithm.

Jung, S. H., & Kim, K. H. (2006). Load scheduling for multiple quay cranes in port
container terminals. Journal of Intelligent manufacturing, 17(4), 479-492.
K., Leong, T. Y., Li, C. L., Ng, J. W. C., and Simchi-Levi, D. (2001), Analysis of a
new vehicle scheduling and location problem, Naval Research Logistics,
48(5), 363-385

Klerides, E., & Hadjiconstantinou, E. (2011). Modelling and solution approaches to the
multiload AGV dispatching problem in container terminals. Maritime
Economics & Logistics, 13(4), 371-386.

Kozan, E. (2000). Optimising container transfers at multimodal


terminals. Mathematical and Computer Modelling, 31(10-12), 235-243

Lau, H. Y., & Zhao, Y. (2008). Integrated scheduling of handling equipment at


automated container terminals. International journal of production
economics, 112(2), 665-682.

Lee, Y. and Chao, S.-L. (2009), A neighborhood search heuristic for pre-marshalling
export containers, Eu- ropean Journal of Operational Research, 196(2), 468-
475

Li, W., Goh, M., Wu, Y., Petering, M. E. H., de Souza, R., and Wu, Y. C. (2012), A
continuous time model for multiple yard crane scheduling with last minute job
arrivals, International Journal of Production Economics, 136(2), 332-343

Li, W., Wu, Y., & Goh, M. (2015). A continuous-time model for multiple yard crane
scheduling with last-minute job arrivals. In Planning and Scheduling for
Maritime Container Yards (pp. 53-83). Springer, Cham.

Lim, A., Rodrigues, B., & Xu, Z. (2007). A m-parallel crane scheduling problem with a
non-crossing constraint. Naval Research Logistics (NRL), 54(2), 115-127.
Ling, M. K., & Di, S. (2010). A scheduling method for cranes in a container yard with
inter-crane interference. In Electronic engineering and computing
technology (pp. 715-725). Springer, Dordrecht.

Liu, C.-I., Jula, H., and Ioannou, P. A. (2002), Design, simulation, and evaluation of
automated container terminals, IEEE Transactions on Intelligent Trans-
portation Systems, 3(1), 12-26

Meersmans, P. J., & Wagelmans, A. P. (2001). Effective algorithms for integrated


scheduling of handling equipment at automated container terminals.

Ng, W. C. (2005). Crane scheduling in container yards with inter-crane


interference. European Journal of operational research, 164(1), 64-78.

Ng, W. C., & Mak, K. L. (2005a). An effective heuristic for scheduling a yard crane to
handle jobs with different ready times. Engineering optimization, 37(8), 867-
877.

Ng, W. C., & Mak, K. L. (2005b). Yard crane scheduling in port container
terminals. Applied mathematical modelling, 29(3), 263-276.

Ng, W. C., Mak, K. L., and Zhang, Y. X. (2007), Scheduling trucks in container
terminals using a genetic algorithm, Engineering Optimization, 39(1), 33-47

Nossack, J., Briskorn, D., & Pesch, E. (2018). Container dispatching and conflict-free
yard crane routing in an automated container terminal. Transportation
Science, 52(5), 1059-1076.

Panchapakesan, A., Abielmona, R., & Petriu, E. (2019, July). Optimizing Maritime
Vessel Service Time with Adaptive Quay Crane Deployment Through Level 4
Hard-Soft Information Fusion. In 2019 22th International Conference on
Information Fusion (FUSION) (pp. 1-8). IEEE.
Sha, M., Zhang, T., Lan, Y., Zhou, X., Qin, T., Yu, D., & Chen, K. (2017). Scheduling
optimization of yard cranes with minimal energy consumption at container
terminals. Computers & Industrial Engineering, 113, 704-713.

Shouwen, J., Di, L., Zhengrong, C., & Dong, G. (2020). Integrated scheduling in
automated container terminals considering AGV conflict-free
routing. Transportation Letters, 1-13.e

Sriphrabu, P., Sethanan, K., & Theerakulpisut, S. (2014). A Genetic Algorithm for
Minimizing Relocations at Container Yard in Container Terminal. In
Advanced Materials Research (Vol. 931, pp. 1683-1688)

Stahlbock, R., & Voß, S. (2008). Operations research at container terminals: a literature
update. OR spectrum, 30(1), 1-52

Steenken, D., Voß, S., & Stahlbock, R. (2004). Container terminal operation and
operations research-a classification and literature review. OR spectrum, 26(1),
3-49

Vidovic, M., & Kim, K. H. (2006). Estimating the cycle time of three-stage material
handling systems. Annals of operations research, 144(1), 181-200.

Vis, I. F., & De Koster, R. (2003). Transshipment of containers at a container terminal:


An overview. European journal of operational research, 147(1), 1-16

Wu, Y., Luo, J., Zhang, D., & Dong, M. (2013). An integrated programming model for
storage management and vehicle scheduling at container terminals. Research
in Transportation Economics, 42(1), 13-27.

Yan, W., Huang, Y., Chang, D., & He, J. (2011). An investigation into knowledge-
based yard crane scheduling for container terminals. Advanced Engineering
Informatics, 25(3), 462-471.
Yan, R., Wang, S., & Du, Y. (2020). Development of a two-stage ship fuel
consumption prediction and reduction model for a dry bulk
ship. Transportation Research Part E: Logistics and Transportation
Review, 138, 101930.

Zeng, Q., & Yang, Z. (2009). Integrating simulation and optimization to schedule
loading operations in container terminals. Computers & Operations
Research, 36(6), 1935-1944

Zhang, C., Chen, W., Shi, L., and Zheng, L. (2010), A note on deriving decision rules
to locate export containers in container yards, European Journal of Operational
Research, 205(2), 483-485

Вам также может понравиться