Summary
2 Excavation $ 92,745.83
7 Carpentry $ 1,180,407.98
8 Joinery $ 69,977.36
9 Roofing $ 75,128.76
10 Plumbing $ 68,532.22
12 Tiling $ 76,472.54
13 Painting $ 95,027.98
14 Glazing $ 545,938.52
15 Siteworks $ 14,031.19
Subtotal $ 3,606,188.21
Preliminaries and General (4.5%) $ 162,278.47
Subtotal $ 3,768,466.68
Profit (10%) $ 376,846.67
Subtotal $ 4,145,313.35
WHT 7.5% $ 310,898.50
SUMMARY Page 1
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
Preambles
m3 : Cubic Metres
m2 : Square Metres
m : Linear Metres
mm : Millimetres
no : Number
kg : Kilogram
MPa : Megapascal
18 1 NOTE
Allow for sheds, messrooms and
attendance , and offices for the site
and administration staff, provide
furniture, temporary power and water
connections as required
19
Allow for sanitary conveniences and
1 NOTE
keeping of the conveniences in clean
and orderly condition
20 1 NOTE
Allow for care and security of works
21 1 NOTE
Allow for management, supervision
and administration of the works by the
contractor
23 1 NOTE
Allow for plants and tools required for
the excution of works
25
Allow provision for scaffolding, for
1 NOTE
exterior and interior works and for lifts
shaft
27 1 NOTE
Allow for protection of the works from
any wheather or any other cause
General
Method of measurement
2. EXCAVATION Page 7
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
Foundation Excavation
14
Excavate 700x300 strip footing, 0- 1 m3
600mm deep commencing from
ground level
2. EXCAVATION Page 8
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
Filling
2. EXCAVATION Page 9
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
2. EXCAVATION Page 10
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
1 $ 25.00
1.1 $ 27.50
2.2 $ 55.00
2.2 $ 55.00
2.2 $ 55.00
2.2 $ 55.00
2.2 $ 55.00
2. EXCAVATION Page 11
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
1 $ 8.00
2. EXCAVATION Page 12
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
Equipment Others
Excavator $1350/hr Overhead P&G Sub-Total
Sub-Total hrs rate Sub-Total 0% 0.00%
2. EXCAVATION Page 13
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
Equipment Others
Excavator $1350/hr Overhead P&G Sub-Total
Sub-Total hrs rate Sub-Total 0% 0.00%
$ 25.00 $ - 0 $ -
2. EXCAVATION Page 14
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
Equipment Others
Excavator $1350/hr Overhead P&G Sub-Total
Sub-Total hrs rate Sub-Total 0% 0.00%
$ 27.50 0.00 $ - $ - $ - $ -
Plate Compactor
$ 500.00
$ 8.00 0.17 $ 85.00 $ 14.45 $ - $ - $ -
Plate Compactor
$ 500.00
$ 25.00 0.17 $ 85.00 $ 14.45 $ - $ - $ -
$ 1.25 $ -
2. EXCAVATION Page 15
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
2. EXCAVATION Page 16
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
2. EXCAVATION Page 17
BILL OF QUANTITIES FOR MJLA'S BUILDING FOR PSO AND DPP OFFICE AT LATA, TEMOTU PROVINCE
(Ministry OF Justice and Legal Affairs)
92,745.83
2. EXCAVATION Page 18
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
General
Method of measurement
3. CONCRETE Page 19
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
SUBSTRUCTURE
3. CONCRETE Page 20
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
SUPERSTRUCTURE
3. CONCRETE Page 21
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
FORMWORK
3. CONCRETE Page 22
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
3. CONCRETE Page 23
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
STAIRS
52 Sides of stair footing, 0-300 high 13.00 m $ 81.00 1.62
3. CONCRETE Page 24
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material LABPOUR
Fixing Transport Sub-Total Standard Hours
0% 20% Hours/m³ Labor Tradesman
$ 8.00 $ 15.00
Average Rate 18.00
3. CONCRETE Page 25
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material LABPOUR
Fixing Transport Sub-Total Standard Hours
0% 20% Hours/m³ Labor Tradesman
$ 8.00 $ 15.00
3. CONCRETE Page 26
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material LABPOUR
Fixing Transport Sub-Total Standard Hours
0% 20% Hours/m³ Labor Tradesman
$ 8.00 $ 15.00
$ - $ 290.00 $ 1,769.00 1.30 $ 19.30
$ -
$ - $ 290.00 $ 1,769.00 1.75 $ 31.50
$ -
$ - $ 290.00 $ 1,769.00 1.3 $ 23.40
3. CONCRETE Page 27
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material LABPOUR
Fixing Transport Sub-Total Standard Hours
0% 20% Hours/m³ Labor Tradesman
$ 8.00 $ 15.00
3. CONCRETE Page 28
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material LABPOUR
Fixing Transport Sub-Total Standard Hours
0% 20% Hours/m³ Labor Tradesman
$ 8.00 $ 15.00
2% 20%
3. CONCRETE Page 29
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material LABPOUR
Fixing Transport Sub-Total Standard Hours
0% 20% Hours/m³ Labor Tradesman
$ 8.00 $ 15.00
3. CONCRETE Page 30
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
ABPOUR Equipment
ours Vibrating machine: $500/30m³/Day
Foreman SUB-TOTAL Hrs/m³ Hourly Rate Sub-Total
$ 30.00 $ 500.00
3. CONCRETE Page 31
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
ABPOUR Equipment
ours Vibrating machine: $500/30m³/Day
Foreman SUB-TOTAL Hrs/m³ Hourly Rate Sub-Total
$ 30.00 $ 500.00
3. CONCRETE Page 32
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
ABPOUR Equipment
ours Vibrating machine: $500/30m³/Day
Foreman SUB-TOTAL Hrs/m³ Hourly Rate Sub-Total
$ 30.00 $ 500.00
$ 19.30 0.2 $ 100.00 $ 100.00
3. CONCRETE Page 33
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
ABPOUR Equipment
ours Vibrating machine: $500/30m³/Day
Foreman SUB-TOTAL Hrs/m³ Hourly Rate Sub-Total
$ 30.00 $ 500.00
$ 72.00 $ -
$ -
44.1 0.2 $ 100.00 $ 100.00
3. CONCRETE Page 34
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
ABPOUR Equipment
ours Vibrating machine: $500/30m³/Day
Foreman SUB-TOTAL Hrs/m³ Hourly Rate Sub-Total
$ 30.00 $ 500.00
No machine needed for this work
$ 21.60 $ - $ - $ -
$ 52.20 $ - $ - $ -
$ 52.20 $ - $ - $ -
$ 52.20 $ - $ - $ -
$ 44.10 $ -
$ -
$ 21.60
$ 5.94 $ -
$ -
$ -
$ 52.20 $ -
$ 52.20 $ -
$ 52.20 $ -
$ -
2.7
$ 72.00
$ 44.10
3. CONCRETE Page 35
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
ABPOUR Equipment
ours Vibrating machine: $500/30m³/Day
Foreman SUB-TOTAL Hrs/m³ Hourly Rate Sub-Total
$ 30.00 $ 500.00
$ 52.20 $ -
$ 52.20 $ -
$ 52.20 $ -
$ 4.50 $ -
$ 5.94 $ -
$ 31.50 $ -
$ 4.50 $ -
$ 8.10 $ -
3. CONCRETE Page 36
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
3. CONCRETE Page 37
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
3. CONCRETE Page 38
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ - $ - $ - $ 1,888.30 $ 1,888.30
$ - $ - $ - $ 1,896.00 $ 1,896.00
$ - $ - $ - $ 1,896.00 $ 1,896.00
$ - $ - $ - $ 1,896.00 $ 1,896.00
$ - $ - $ - $ 1,909.50 $ 1,909.50
$ - $ - $ - $ 1,900.50 $ 1,900.50
$ - $ - $ - $ 1,900.50 $ 1,900.50
$ - $ - $ 1,900.50 $ 1,900.50
$ - $ - $ - $ 1,925.70 $ 1,925.70
$ - $ - $ - $ 1,900.50 $ 1,900.50
$ - $ - $ - $ 1,900.50 $ 1,900.50
$ - $ - $ - $ 1,892.40 $ 1,892.40
3. CONCRETE Page 39
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ - $ - $ - $ 1,921.20 $ 1,921.20
$ - $ - $ - $ 1,921.20 $ 1,921.20
$ - $ - $ - $ 1,921.20 $ 1,921.20
$ - $ - $ - $ 1,841.00 $ 1,841.00
$ - $ - $ - $ 1,913.10 $ 1,913.10
$ - $ - $ - $ 1,913.10 $ 1,913.10
$ - $ - $ 1,869.00 $ 1,869.00
$ - $ - $ - $ 1,925.25 $ 1,925.25
$ - $ - $ - $ 1,925.25 $ 1,925.25
3. CONCRETE Page 40
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ - $ - $ - $ 346.98 $ 346.98
$ - $ - $ - $ 377.58 $ 377.58
$ - $ - $ - $ 377.58 $ 377.58
$ - $ - $ - $ 377.58 $ 377.58
$ - $ - $ - $ 532.50 $ 532.50
$ - $ -
$ 395.53 $ 395.53
$ - $ - $ 234.98 $ 234.98
$ -
$ - $ - $ - $ 377.58 $ 377.58
$ - $ - $ - $ 377.58 $ 377.58
$ - $ - $ - $ 377.58 $ 377.58
$ - $ - $ 161.89 $ 161.89
$ - $ - $ 803.13 $ 803.13
$ - $ - $ 577.61 $ 577.61
3. CONCRETE Page 41
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ - $ - $ - $ 357.86 $ 357.86
$ - $ - $ - $ 357.86 $ 357.86
$ - $ - $ - $ 357.86 $ 357.86
$ - $ - $ - $ 104.94 $ 104.94
$ - $ - $ - $ 112.86 $ 112.86
$ - $ - $ - $ 361.50 $ 361.50
$ - $ - $ 99.54 $ 99.54
$ - $ - $ - $ 115.02 $ 115.02
3. CONCRETE Page 42
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Cost
3. CONCRETE Page 43
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Cost
3. CONCRETE Page 44
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Cost
$ 18,883.00
$ 5,688.00
$ 1,896.00
$ 9,480.00
$ 1,909.50
$ 25,276.65
$ 2,223.59
$ 11,403.00
$ 34,662.60
$ 1,900.50
$ 1,900.50
$ 1,892.40
3. CONCRETE Page 45
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Cost
$ 17,675.04
$ 19,212.00
$ 13,448.40
$ 49,707.00
$ 49,740.60
$ 1,913.10
$ 1,869.00
$ 53,907.00
$ 10,858.41
3. CONCRETE Page 46
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Cost
$ 18,389.94
$ 3,398.22
$ 11,327.40
$ 7,551.60
$ 27,157.50
$ 8,701.65
$ 18,328.47
$ 6,796.44
$ 22,654.80
$ 13,592.88
$ 11,818.06
$ 146,169.44
$ 152,489.04
3. CONCRETE Page 47
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Cost
$ 4,294.32
$ 12,167.24
$ 7,157.20
$ 104.94
$ 112.86
$ 361.50
$ 99.54
$ 115.02
$ 808,234.35
3. CONCRETE Page 48
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
4 REINFORCING STEEL
General
Method of measurement
4. REINFORCEMENT Page 49
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
4 REINFORCING STEEL
SUBSTRUCTURE
Column Pads
Nib Columns
Tie Wire
Strip Footing
4. REINFORCEMENT Page 50
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
4 REINFORCING STEEL
18 D16 horrizontal bars 1072.00 KG $ 17.37 $ 18,621.71
Floor Slab
SUPERSTRUCTURE
Suspended Beam
4. REINFORCEMENT Page 51
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
4 REINFORCING STEEL
Roof Beams
STAIRS
Footing
4. REINFORCEMENT Page 52
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
4 REINFORCING STEEL
50 D12 bars 144.00 KG $ 17.31 $ 2,492.64
4. REINFORCEMENT Page 53
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
General
1
Refer to the drawings and Specification for
full details and descriptions of materials and
workmanship
Refer to the General and Special Conditions
2 of the contract and tender and to the
Preliminary and General section of the
Specification
Method of measurement
4
Refer to the General rules of the NZS 4202:
1995 Standard Method of Measurement of
Building Works
SUBSTRUCTURE
5. BLOCKWORK Page 54
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
CONCRETE FILLING
Fill all cells of 200mm thick blockwork to 57 m2 116.45 1.16 5.8225
underside of GF slab with 17.5 Mpa
Strength concrete
5. BLOCKWORK Page 55
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
terial Labor
Transport Sub-Total Standard hours
20% Labor Tradesman Foreman
$ 8.00 $ 15.00 30
0.43 0.22
0.5 0.25
0.56 0.28
0.35
0.45
0.55
Standard Hours LH
5. BLOCKWORK Page 56
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
terial Labor
Transport Sub-Total Standard hours
20% Labor Tradesman Foreman
TRADESMAN LABOR TRADESMAN LABOR
5. BLOCKWORK Page 57
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
RAKING Equipment
Hourly rate hrs rate
Sub-Total TradesmaLabour Foreman Sub-total
$ 25.00 $ 8.00
25
5. BLOCKWORK Page 58
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
RAKING Equipment
Hourly rate hrs rate
Sub-Total TradesmaLabour Foreman Sub-total
$ 28.30 0.20 $ - $ - $ - $ -
$ 28.30 0.00 $ - $ - $ - $ -
$ 4.60
$ 8.25 $ - $ - $ - $ - $ - $ - $ -
$ 8.25 $ - $ - $ - $ - $ - $ - $ -
$ 8.25 $ - $ - $ - $ - $ - $ - $ -
5. BLOCKWORK Page 59
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
5. BLOCKWORK Page 60
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
$ - 0 0 0 $ 224.63 $ 224.63
$ - $ - $ - $ - $ 215.39 $ 215.39
$ - $ - $ - $ - $ 188.74 $ 188.74
$ - $ - $ - $ - $ 41.47 $ 41.47
$ -
$ - $ - $ - $ - $ 41.71 $ 41.71
$ -
$ 37.27 $ 37.27
$ -
$ - $ - $ - $ 154.98
$ 154.98
$ - $ - $ - $ - $ 154.98
$ 154.98
$ - $ - $ - $ - $ 153.72
$ 153.72
5. BLOCKWORK Page 61
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
Cost
5. BLOCKWORK Page 62
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
Cost
$ 12,803.91
$ 18,308.15
$ 9,437.00
$ 6,302.98
$ 3,586.75
$ 559.05
$ 8,833.69
$ 13,173.05
$ 7,685.85
$ 67,886.52
5. BLOCKWORK Page 63
BOQ FOR PROPOSED OFFICE FOR PSO AND DPP OFFICE AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
Preambles
General
Method of measurement
EXTERIOR
INTERIOR
Material Labor
Fixing Transport Sub-Total Standard Hours
5% 20% Hour Tradesman Labor
$ 15.00 $ 8.00
Material Labor
Fixing Transport Sub-Total Standard Hours
5% 20% Hour Tradesman Labor
Material Labor
Fixing Transport Sub-Total Standard Hours
5% 20% Hour Tradesman Labor
LABOR
$ 0.88 $ 4.63 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 2.00 $ 10.25 $ - $ - $ - $ - $ -
$ 1.44 $ 5.19 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 2.00 $ 10.25 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 1.44 $ 7.74 $ - $ - $ - $ - $ -
$ 2.40 $ 10.65 $ - $ - $ - $ - $ -
$ 2.40 $ 10.65 $ - $ - $ - $ - $ -
$ 53,029.37
Method of measurement
7. CARPENTRY Page 76
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Structural Steel
Structural steel is included in this
section :-
12 Weights are calculated from
standard average weights given in
the Manufactures tables and no
allowance has been made for rolling
margin
7. CARPENTRY Page 77
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
7. CARPENTRY Page 78
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
CEILING FRAMING
EXTERIOR FINISHES
7. CARPENTRY Page 79
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
35 1 item $ 21,837.80
7. CARPENTRY Page 80
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
39 m² $ 4.30
10mm Gyprock to interior ceiling linin 324 $ 43.00
HARDWARE
AMOUNT OF CARPENTRY
CARRIED TO SUMMARY
7. CARPENTRY Page 81
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material Labor
Fixing Transport Sub-Total Standard hours
5% 20% Hours Labour Tradsman
5% 20% 8 $ 25.00
7. CARPENTRY Page 82
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material Labor
Fixing Transport Sub-Total Standard hours
5% 20% Hours Labour Tradsman
7. CARPENTRY Page 83
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material Labor
Fixing Transport Sub-Total Standard hours
5% 20% Hours Labour Tradsman
7. CARPENTRY Page 84
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material Labor
Fixing Transport Sub-Total Standard hours
5% 20% Hours Labour Tradsman
$ - $ - $ 20,382.36 0 $ - $ -
7. CARPENTRY Page 85
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material Labor
Fixing Transport Sub-Total Standard hours
5% 20% Hours Labour Tradsman
$ 20,640.94 $ 20,640.94
$ 21,837.80
$ 0.21
$ 0.84 $ 5.64 0.12 $ 4.18
7. CARPENTRY Page 86
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
Material Labor
Fixing Transport Sub-Total Standard hours
5% 20% Hours Labour Tradsman
$ 2.95 $ 11.80 $ 79.65 0.60 $ 15.00
$ 2.15
8.6 58.05 0.6 $ 15.00
$ - $ - $ - 0 $ -
$ 5.56 $ 36.11
$ 14.00 $ 91.00
$ 52.00 $ 338.00
$ 28.20 $ 183.30
$ 62.00 $ 387.50
$ 53.40 $ 347.10
7. CARPENTRY Page 87
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
7. CARPENTRY Page 88
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
7. CARPENTRY Page 89
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ 3.00 $ - $ - $ - $ - $ -
$ 3.00 $ - $ - $ - $ - $ -
$ 5.00 $ - $ - $ - $ - $ -
$ 12.50 0 $ -
$ 12.50 $ - $ - $ - $ - $ -
$ - $ 4.00 $ - $ - $ - $ - $ -
$ - $ 12.50 $ - $ - $ - $ - $ - $ -
$ - $ 7.50 $ - $ -
$ - $ 7.50 $ - $ -
$ - $ 12.50 $ - $ -
7. CARPENTRY Page 90
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ 5.50
$ 0.50
$ -
$ -
$ 2.50
$ 5.00 $ - $ - $ -
$ 5.00 $ - $ - $ -
$ 3.00 $ - $ - $ -
$ 5.00 $ - $ - $ - $ - $ - $ -
$ 5.00
$ 5.00
$ 5.00
$ 6.50 $ - $ - $ -
$ 7.00 $ - $ - $ -
7. CARPENTRY Page 91
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ 5.75
$ 5.75
$ -
$ 12.50
$ -
$ -
$ 12.50
$ 5.75
$ 5.75
$ -
$ 12.50
$ -
$ -
$ 12.50
$ 4.18 $ - $ - $ - $ - $ -
$ 6.50 $ - $ - $ - $ - $ -
7. CARPENTRY Page 92
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ - $ - $ - $ - $ -
$ 15.00 $ -
$ 15.00 $ - $ - $ - $ - $ - $ -
$ - 0 $ - $ - $ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ 15.00 0 $ - $ - $ - $ - $ -
$ 30.00
$ 25.00
7. CARPENTRY Page 93
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
7. CARPENTRY Page 94
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
7. CARPENTRY Page 95
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
7. CARPENTRY Page 96
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ 123.10 $ 14,895.10
$ 12.38 $ 2,995.96
$ 4.80 $ 1,161.60
$ 7.20 $ 871.20
$ 458.50 $ 458.50
$ 20,382.36
7. CARPENTRY Page 97
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ 85.44 $ 13,157.38
$ 66.55 $ 1,064.80
$ 475.00 $ 475.00
$ 27.75 $ 3,108.00
$ 4.00 $ 448.00
$ 6.00 $ 672.00
$ 47.66 $ 1,715.76
$ 20,640.94
$ 88.63 $ 13,648.25
$ 67.37 $ 2,182.79
$ 475.00 $ 475.00
$ 19.50 $ 2,808.00
$ 4.00 $ 576.00
$ 6.00 $ 432.00
$ 47.66 $ 1,715.76
$ 21,837.80
7. CARPENTRY Page 98
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry Of Justice and Legal Affairs)
$ 58.05
$ 58.05 $ 18,808.20
$ -
$ - $ 14,673.23 $ 14,673.23
$ 36.11 $ 9,924.13
$ 91.00 $ 364.00
$ 338.00 $ 2,366.00
$ 183.30 $ 549.90
$ 387.50 $ 775.00
$ 347.10 $ 694.20
$ - $ 14,673.23
$ 2,000.00 $ 2,000.00
$ 1,180,407.98
7. CARPENTRY Page 99
BOQ FOR PROPOSED OFFICE BUILDING FOR PSO AND DPP AT LATA-TEMOTU PROVINCE
(Ministry of Justice and Legal Affairs)
Materi
Items Description Quantity Unit
2
Refer to the General and Special
Conditions of contract and Tender and
to the Preliminary and General section
of the Specification
Method Of Measurement
3
This Bill of Quantities has been
prepared generally in accordance with
NZS 4202:1995 Standard Method of
measurement of Building Works, but no
deviation from same shall form the
basis of a claim
6
The rates for joinery items, except
where otherwise described, shall
include for supply and delivery to site,
hanging,fixing or placing in position
7
The rates shall include for all nails,
screws, plugs and other fixings, framing
to other timbers, and all machining,
arris-rounding, grooving, sinking,
rebating, throating etc., and assembly
joints where required
Materi
Items Description Quantity Unit
DOORS
11 Doors and frame sizes are given in note
order of Height x Width
12 note
Flush doors shall have 6mm thick
hardwood clashing strips to all edge
GROND FLOOR
Kitchen sink Bench
14 1 item $ 3,265.23
Construct 2 meter long x 0.42meter
wide x 0.9meter high kitchen sink
bench unit from 15mm plywood with
plywood doors with conceal hinges and
hardwares, and intermediate shelving
bottom support constructed from 100 x
44 DAR vasa, complete with formica
laminated at top, commencing from
both ends of single stainless sink to
each end of bench.
Materi
Items Description Quantity Unit
Reveption Counter
Materi
Items Description Quantity Unit
TOP FLOOR
Library Bookshelf
16 1 item $ 16,891.79
Construct book shelf unit of overal
length of aprox. 6.9m long by 0.3m
wide by 2m high along wall in library as
shown in the drawing from with 18mm
plywood with self-tapping screw and
wood glue. With intermediate bottom
support constructed from 100x50 dar
vasa. Apply varnish to finishing and
make good. Refer to drawing for layout
plan
Materi
Items Description Quantity Unit
$ 3,265.23
$ 25,420.87
$ 16,891.79
$ 10,085.49
$ 3,265.23
$ 37.50
$ 30.00
$ 3.00
$ 2.50
$ 25.00
$ 30.00 0 0 0
$ 3.00 0 0 0
$ 3.00 0 0 0
$ 10.00 0 0 0
$ 3.25 0 0 0
$ 7.50 0 0 0
$ 7.50 0 0 0
$ 7.50 0 0 0
$ 25.00 0 0 0
$ 7.50 0 0 0
$ 25.00 0 0 0
$ 25.00 0 0 0
$ 30.00
$ 3.00
$ 30.00
$ 7.50
$ 7.50
$ 7.50
$ 5.00
$ 25.00
$ 30.00
$ 3.00
$ 10.00
$ 3.25
$ 5.00
$ 7.50
$ 7.50
$ 7.50
$ 5.00
$ 30.00 $ - $ - $ - $ - $ -
$ 3.00 $ - $ - $ - $ - $ -
$ 2.50 $ - $ - $ - $ - $ -
$ 25.00 $ - $ - $ - $ - $ -
$ 12.50 $ - $ - $ - $ - $ -
$ 25.00 $ - $ - $ - $ - $ -
$ 10.00 $ - $ - $ - $ - $ -
$ 1.25 $ - $ - $ - $ - $ -
$ 1.25 $ - $ - $ - $ - $ -
$ 3.00 $ - $ - $ - $ - $ -
$ - $ - $ - $ - $ - $ -
Sub-Total
Sub-Total
$ 530.50 $ 1,061.00
$ 21.82 $ 436.48
$ 38.90 $ 116.70
$ 493.00 $ 493.00
Sub-Total
$ 98.18 $ 392.72
$ 105.64 $ 422.56
$ 78.90 $ 78.90
$ 27.25 $ 27.25
$ 27.25 $ 27.25
$ 32.21 $ 209.37
$ 3,265.23
$ 530.50 $ 6,366.00
$ 21.82 $ 1,113.02
$ 32.21 $ 2,963.41
$ 45.28 $ 135.84
$ 135.85 $ 13,177.45
$ 32.70 $ 130.80
$ 32.70 $ 130.80
$ 32.70 $ 130.80
$ 81.70 $ 245.10
$ 64.20 $ 192.60
$ 153.52 $ 614.08
$ 55.24 $ 220.96
$ 25,420.87
Sub-Total
$ 573.75 $ 1,147.50
$ 38.58 $ 231.45
$ 330.00 $ 660.00
$ 31.50 $ 31.50
$ 31.50 $ 31.50
$ 65.00 $ 65.00
$ 41.30 $ 41.30
$ 73.00 $ 73.00
$ 2,281.25
$ 595.50 $ 8,337.00
$ 31.14 $ 622.87
$ 41.48 $ 248.88
$ 131.01 $ 1,048.04
$ 70.00 $ 6,300.00
$ 37.50 $ 75.00
$ 32.50 $ 130.00
$ 32.50 $ 130.00
$ 16,891.79
$ 10,085.49 $ 10,085.49
$ 570.50 $ 4,564.00
Sub-Total
$ 54.21 $ 542.11
$ 60.28 $ 301.40
$ 157.60 $ 630.40
$ 85.00 $ 3,655.00
$ 42.74 $ 85.48
$ 37.70 $ 113.10
$ 40.20 $ 120.60
$ 73.40 $ 73.40
$ 10,085.49
$ - $ 530.50 $ 1,061.00
$ - $ 21.82 $ 436.48
$ - $ 38.90 $ 116.70
$ - $ 493.00 $ 493.00
$ - $ 98.18 $ 392.72
$ - $ 105.64 $ 422.56
$ - $ 78.90 $ 78.90
$ - $ 27.25 $ 27.25
$ - $ 27.25 $ 27.25
$ - $ 32.21 $ 209.37
$ - $ - $ 3,265.23
$ 69,977.36
General
2
Refer to the General and Special Conditions of
the contract and tender and to the Preliminary
and General section of the Specification
Method of measurement
METAL ROOFING
9 Color Bond Roofing Iron sheets fixed to timber 220 m² 139.84 1.40
purlins with 75mm galv. Roofing screws
FLASHING
11 22 m $ 49.30 $ 0.49
300x380 Galvanized flashing to roof front.
Refer to drawing section for fixing detail
INSULATION
12 Double sided sisilation 453 laid over bird wire 220 m2 $ 9.10 0.09
netting
$ -
$ 4.00 $ 16.00 $ 100.80 0.2 $ 5.00 $ 5.00
$ -
$ 3.70 $ 14.80 $ 93.24 0.2 $ 5.00 $ 5.00
$ -
$ 4.05 $ 16.20 $ 102.06 0.2 $ 5.00 $ 5.00
$ -
$ 5.10 $ 20.40 $ 128.52 0.2 $ 5.00 $ 5.00
$ -
$ 6.20 $ 24.80 $ 156.24 0.5 $ 12.50 $ 12.50
$ -
$ 25.00 $ 100.00 $ 630.00 8 $ 200.00 $ 200.00
$ - $ - $ - $ - $ 225.95 $ 49,708.65
$ - $ - $ - $ - $ - $ 102.12 $ 2,246.60
0 0 0 0 0 $ 18.97 $ 4,172.52
$ 28.63 $ 6,298.16
$ 126.90 $ 3,299.40
$ 193.70 $ 5,423.60
$ 105.80 $ 846.40
$ 98.24 $ 392.96
$ 107.06 $ 856.48
$ 133.52 $ 534.08
$ 168.74 $ 1,349.92
$ 830.00 $ 830.00
$ 75,128.76
General
1
Refer to the drawings and Specification
for full details and descriptions of
materials and workmanship
Method of measurement
Water Supply
21 Allow for 15mm dux pipe, with all 145 m $ 25.20 $ 1.26
required connections, brackets, and
fittings
23 Waste pipe
Sewer pipe
SANITARY FITTINGS
45 D12 steel rod bars in septic base and 123 kg 10.51 $ 0.11
cover slab and soakaway cover slab,
run both ways at 200 centers with
50mm concrete cover
Material Labor
Fixing Transport Sub-Total Standard Hours
1% 20% Hours/Unit Labour Tradesman Foreman
Average rat $ 25.00
Material Labor
Fixing Transport Sub-Total Standard Hours
1% 20% Hours/Unit Labour Tradesman Foreman
Material Labor
Fixing Transport Sub-Total Standard Hours
1% 20% Hours/Unit Labour Tradesman Foreman
Material Labor
Fixing Transport Sub-Total Standard Hours
1% 20% Hours/Unit Labour Tradesman Foreman
Material Labor
Fixing Transport Sub-Total Standard Hours
1% 20% Hours/Unit Labour Tradesman Foreman
fixing transport
1% 20%
0 0 $ - 2.20 $ 55.00
0 0 $ 8,015.64 $ - 0 0 0
Material Labor
Fixing Transport Sub-Total Standard Hours
1% 20% Hours/Unit Labour Tradesman Foreman
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
0 0 $ 8,015.64 $ 8,015.64
Sub-Total
General
Method of measurement
ELECTRICAL WORK
Mains Supply
13 Meter Box
Earthing MEN
14 Approved size Earthing cable, electrode and clip, 1 item 297.6 14.88
and allow for drillings of holes from main switch
board to sub-main board
GROUND FLOOR
Circuit Wiring
15 All approved cables from the switch board to 102 m 8.5 0.425
ceiling mounted lights
16 All approved cables from the switch board to the 1 item 858 42.9
general purpose outlets (GPO), and Socket
outlets.
20 Double gang power outlet with bracket and fitting 13 no 105 5.25
fix to wall
TOP FLOOR
21 Circuit Wiring
22 All approved cables from the switch board to 108 m 8.5 0.425
ceiling mounted lights
23 All approved cables from the switch board to 1 item 950 47.5
general purpose outlets (GPO) and Socket
outlets
29 Double gang power outlet with bracket and fitting 10 no 105 5.25
fix to wall
OTHERS
$ 50,356.01
General
Method of measurement
GROUND FLOOR
Floor Tiles
Vinyl Tiles
Wall Tiles
TOP FLOOR
Vinyl Tiles
Wall Tiles
$ 134.54 $ 134.54
$ 345.49 $ 345.49
$ 212.61 $ 212.61
$ 210.11 $ 210.11
0 0 0 $ 174.33 $ 174.33
$ 209.35 $ 209.35
$ 210.11 $ 210.11
$ 1,724.40 $ 1,200.00
Cost
Cost
$ 22,064.56
$ 2,763.95
$ 9,354.93
$ 315.17
$ 28,589.97
Cost
$ 2,763.95
$ 9,211.40
$ 208.61
$ 1,200.00
$ 76,472.54
General
2
Refer to the General and Special
Conditions of the contract and tender
and to the Preliminary and General
section of the Specification
Method of measurement
3
This Bill of Quantities has been
prepared generally in accordance with
NZS 4202: 1995 Standard Method of
measurement of Building Works
EXTERIOR
Anti-rust paint
16 Allow to apply antirust paint on 1 item
Fabricated steel lattice at fron of
building and 50x50 SHS stairs railing
and posts
INTERIOR
INTERIOR
Material
Wastage Fixing Transport Sub-Total Stan
5% 1% 20% Hours Labour
Average Rate
Material
Wastage Fixing Transport Sub-Total Stan
5% 1% 20% Hours Labour
$ 1.80 $ 0.36 $ 7.20 $ 45.36 0.42
Material
Wastage Fixing Transport Sub-Total Stan
5% 1% 20% Hours Labour
Labor Equipment
Standard Hours hrs rate Sub-Total
Tradesman Foreman Sub-Total Tools
$ 25.00
$ 8.25 $ 8.25
$ -
Labor Equipment
Standard Hours hrs rate Sub-Total
Tradesman Foreman Sub-Total Tools
$ 10.50 $ - $ 10.50 $ - $ - $ -
$ -
$ 10.50 $ - $ 10.50 $ - $ - $ -
$ -
$ 10.50 $ - $ 10.50 $ - $ - $ -
$ -
$ 13.75 $ - $ 13.75 $ - $ - $ -
$ -
$ 3.75 $ 3.75
$ 3.75 $ 3.75
$ 11.25 $ 11.25
$ 11.25 $ 11.25
$ - $ - $ - $ - $ - $ -
$ - $ - $ - $ - $ - $ -
$ - $ - $ - $ - $ - $ -
$ - $ - $ - $ - $ - $ -
Labor Equipment
Standard Hours hrs rate Sub-Total
Tradesman Foreman Sub-Total Tools
$ - $ - $ - $ - $ - $ -
$ - $ - $ - $ - $ - $ -
$ 5.75
$ 5.75
$ 0.23
$ 0.23
$ 5.75
$ -
$ 5.75
$ -
$ 5.75
$ - $ - $ - $ 32.58 $ 32.58
$ - $ - $ - $ 55.86 $ 55.86
$ - $ - $ - $ 47.34 $ 47.34
$ - $ - $ - $ 55.86 $ 55.86
$ - $ - $ - $ 59.11 $ 59.11
$ 9.04 $ 9.04
$ 9.42 $ 9.42
$ 55.35 $ 55.35
$ 55.35 $ 55.35
$ 5,210.00
$ - $ - $ - $ 53.17 $ 53.17
$ - $ - $ - $ 53.59 $ 53.59
$ - $ - $ - $ 53.59 $ 53.59
$ - $ - $ - $ 53.59 $ 53.59
$ - $ - $ - $ 7.21 $ 7.21
$ - $ - $ - $ 51.89 $ 51.89
$ 10.03 $ 10.03
$ -
$ 10.22 $ 10.22
$ 53.82 $ 53.82
$ 53.82 $ 53.82
$ 59.34 $ 59.34
$ 10.79 $ 10.79
$ 10.79 $ 10.79
Cost
$ 3,192.90
Cost
$ 2,457.84
$ 4,686.66
$ 782.04
$ 3,842.15
$ 542.52
$ 565.20
$ 1,328.40
$ 4,095.90
$ 5,210.00
$ 9,836.91
$ 3,108.09
$ 3,483.21
$ 11,467.79
Cost
$ 824.31
$ 6,641.48
$ 632.14
$ 797.39
$ 12,216.64
$ 16,575.88
$ 1,186.76
$ 992.68
$ 561.08
$ 95,027.98
General
Method of measurement
DOORS
Windows
Reception
Material Labor
Fixing Transport Sub-Total Standard Hours
5% 20% Hours Labour Tradesman Foreman
Average rate $ 25.00
Material Labor
Fixing Transport Sub-Total Standard Hours
5% 20% Hours Labour Tradesman Foreman
900 3600 24300.00 3 $ 75.00
Material Labor
Fixing Transport Sub-Total Standard Hours
5% 20% Hours Labour Tradesman Foreman
Equipment Others
hrs rate Sub-Total Overhead P&G
Sub-Total 0 0% 0.00%
$ 37.50 0 0 0 0
Equipment Others
hrs rate Sub-Total Overhead P&G
Sub-Total 0 0% 0.00%
$ 75.00 0 0 0 0 0
$ 37.50 0 0 0 0 0
$ 37.50 0 0 0 0 0
$ 37.50 0 0 0 0 0
$ 37.50 0 0 0 0 0
$ 37.50 0 0 0 0 0
$ 50.00 0 0 0 0 0
Equipment Others
hrs rate Sub-Total Overhead P&G
Sub-Total 0 0% 0.00%
$ 40.00 0 0 0 0 0
$ 545,938.52
1
Refer to the drawings and Specification
for full details and descriptions of
materials and workmanship
Method of measurement
3
This Bill of Quantities has been
prepared generally in accordance with
NZS 4202: 1995 Standard Method of
measurement of Building Works
FOOTH PATH
Formwork
Planter
Allow for construction of concrete 1 item 520 26.00
planters with 200mm block, concrete,
reinforcement etc..
Material Labor
Fixing Transport Sub-Total Standard Hours
2% 20% Hours Labour TradesmaForeman Sub-Total
1% Average Rat $ 25.00
Material Labor
Fixing Transport Sub-Total Standard Hours
2% 20% Hours Labour TradesmaForeman Sub-Total
$ 5,120.97
$ 1,524.00 $ 1,524.00
0 0 0 0 0 0 $ 33.38 $ 33.38
0 0 0 0 0 0 $ 5.70 $ 5.70
0 0 0 0 0 0 $ 48.16 $ 48.16
0 0 0 0 0 0 $ 19.07 $ 19.07
0 0 0 0 0 0 $ 19.07 $ 19.07
0 0 0 0 0 0 $ 49.10 $ 49.10
$ 5,120.97 $ 5,120.97
$ 545.24 $ 3,271.44
$ 23.97 $ 982.77
$ 37.98 $ 75.96
$ 32.90 $ 65.80
$ - $ -
$ 14.50 $ 725.00
$ 5,120.97
$ 860.40 $ 860.40
Cost
$ 60.00
$ 4,572.00
$ 667.64
$ 113.90
$ 963.20
Cost
$ 667.53
$ 858.25
$ 147.30
$ 5,120.97
$ 860.40
$ 14,031.19