SF6 Gas Insulated

Pole Mounted Sectionalizer

SPGSS SERIES
15kV, 27kV, 38kV
400A, 630A
SF6 GI Sectionalizer for overhead line-----------------------------------------------------------------------------------------------------------------------------------

INTRODUCTION

The SF6 GI-Sectionalizer ( Gas Insulated Sectionalizer ) of SHINSUNG is designed to meet the demands of oilless,
maintenance free operation. The SF6 GI-Sectionalizer uses the SF6 gas as the insulating and arc quenching media,
and combined with unique puffing technics, it ensures the safe & long life load current switching.

The switch itself can be used also as a line load break switch and combined with control, it works as a Sectionalizer.

There are two options of mechanism. One is quick break, quick open spring toggled motor mechanism and the other is
spring stored energy mechanism. In case of spring toggled motor mechanism, the close, open time is within 0.6 sec.
So, if the reclosing interval of the backup protection device is more than 0.7 sec, this mechanism is recommended.

In case of spring stored energy mechanism(manual closing) with low energy tripping mechanism, the opening time after
current cessation is within 5 cycles.

CHARACTERISTICS
* SF6 gas insulation, SF6 gas interruption.
* Pure puffer technics, no leakage current path between open contacts.
* Short arcing time (0.5 cycles), heavy tulip contacts with Tungsten-cooper arc resistant contact material ensures
more than 5 times making current, more than 400 times load current switchings.
* At atmospheric gas pressure, it ensures the rated insulation, interruption ratings.
* Tig welded stainless steel tank case and double sealing technics with EPDM rubber ensures the sealed
for life characteristics.
* Three CT's and automatic CT shortening device
* Six voltage sensors can be integrated.
* In case of electrical closing options, the internal battery charging source can be supplied.

* SAFETY DEVICES
- High Gas Pressure bursting membrane 4 6 kg.f/cm².G (standard)
- Gas Pressure Meter (standard)
- Low Gas Pressure Target and Electrical, Mechanical Interlocking Device - optional
- Manual Locking Device (Electrical, Mechanical) - optional

* BUSHING CONNECTIONS
- NEMA type Flat Terminal with copper alloy (Pollution density 0.06 mg/cm²)

- Mold corn Lead Connection (Pollution density 0.35 mg/cm²)


- Anti-water Penetration Jelly filled Insulation Cable (separate) with Bird-guard Cap

SHINSUNG 1 ---------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
-----------------------------------------------------------------------------------------------------------------------------------SF6 GI Sectionalizer for overhead line

RATINGS & SPECIFICATIONS


TYPE SPGSS-15 SPGSS-26 SPGSS-36 REMARKS
RATINGS

Maximum System Voltage kV 15.5 27 38


Current A 400/ 630 400/ 630 400/ 630
Frequency Hz 50/60 50/60 50/60

Fault Make Capacity (rms) kA 20 12.5 12.5

Fault Make Capacity (peak) kA 50 31.5 31.5

Number of Making's times 5 5 5


BREAKING CAPACITY

Mainly Active Load Current (0.7PF). A 400/ 630 400/ 630 400/ 630
Loop Current A 400/ 630 400/ 630 400/ 630
Number of Switching's times 400 400 400
Cable Charging Current A 20 25 20
Transformer Magnetizing Current A 14/ 22 14/ 22 14/ 22
Overload current A 900 900 900
BASIC INSULATION LEVEL (1.2x50 )
Phase to Earth kV 110 150 170
Across Interrupter kV 125 165 195
On Loss of SF6 Gas kV 110 150 170
POWER FREQUENCY INSULATION LEVEL (1 min)
Phase to Earth kV 60 70 70
Across Interrupter kV 60 77 80
ENVIRONMENTAL
Ambient Temperature -25 +70 -25 +70 -25 +70
Humidity % 0 100 0 100 0 100
Altitude (max.) m 1000 1000 1000

OPERATING PERFORMANCE
Close/Open DC Voltage Vdc 24 24 24
<0.7 <0.7 <0.7 Spring toggle
manual manual manual mechanism
Close/Open Time sec closing closing closing
<5 cycle <5 cycle <5 cycle Spring stored
open open open mechanism
Mechanical operations times 10,000 10,000 10,000

Nominal Gas Pressure kg.f/cm².G 1.0 1.0 1.0

Bursting Pressure kg.f/cm².G 4 6 4 6 4 6

Low Pressure kg.f/cm².G <0.1 <0.1 <0.1

Applied Standard; IEC 60694(1996), IEC 60265-1(1998), ANSI/IEEE C 37.60, 37.61, 37.63, 37.90
* NOTE 1. The contacts of all the ratings are the same. 2. The contacts distance & structure of 27, 38 kV are the same.

3. The bushing creepage distances are as follows(15 kV- 550 mm, 27 kV- 740 mm, 38 kV- 960 mm)

4. The continuous current ratings of inside the tank case are the same 630 A ratings.

ISO9001---------------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 2
SF6 GI Sectionalizer for overhead line--------------------------------------------------------------------------------------------------------------------------

OVERVIEW-SF6 GI SECTIONALIZER
The SF6 GI Sectionalizer consists of bushings, SUS304L tank case, operator independent mechanism, main driving
shaft and insulating arms, Puffer interrupting part, CT's, voltage sensors and bursting membrane, low pressure locking
device, mechanism box with motor, auxiliary contacts, sealing connector with automatic CT shorting device, etc.

BUSHINGS
* The bushings is made of high quality porcelain, is horizontally mounted to the SUS case.
The SUS case is bulged to shape the sealing groove and it also strengthen the case itself.
* The sealing is done with specially designed EPDM gasket to seal the gas and to prevent water penetration.
* The inside of the bushing halls is treated with semi conductive painting to short the gap between the cooper stud
and bushing wall inside. So it ensures good RIV characteristics and also good partial discharge control.
* The stud and bushing is o-ring gas sealed and at terminal side it is water sealed.

TANK CASE
* The tank case is made of low carbon stainless steel to prevent the corrosion because of welding.
It is designed for maximum strength and minimum welding line.
* The bushing reception halls, shaft reception halls are press bulged, and the case itself has just one welding line.
* The rear and front side plate is also press bulged to reinforce and to form the welding line.
* At the maximum bursting pressure of 6 kg.f/cm².G, the operation is not affected and at 10 kg.f/cm².G
the tank case is not destroyed.

MECHANISM - spring toggle mechanism with motor


* The very simple, reliable mechanism makes it possible to install the mechanism inside the SF6 tank case
for actual maintenance free operation.
* The simple toggled action spring mechanism just start it's close or open operation at the final operating handle
movement -dead point-, so it ensures operator independent quick close, quick open operation.
* When the operating handle reaches at the dead point, the mechanism are free run to get the enough kinetic
energy and finally starts to rotate the main driving shaft.
* The manual operating force is about 17 18 kg.m, The motor is coupled with manual operating handle through
one way rotated bearings, so during manual operation, the motor part is actually disconnected.
* The electrical operating time is below <0.7 sec and with fully charged battery of 7 Ah 24 Vdc, the close and open
operation can be done more than 500 times.

MECHANISM - spring stored energy mechanism with low energy tripper


* Manually close, electrically open
* Charge the tripping energy before closing
* Electrical close (optional)
* The electrical operating time is below <5 cycles

,INTERRUPTING PARTS
* The SF6 GI LBS uses the puffing technics and the arcing time is just half cycles. Because of extremely short arc times,
the arc by products are negligible, even after duty tests.
* The compressed gas concentrate the arc though the nozzle and exhaust it through the hall of fixed contact
to condense, cool the arc plasma.
* There is no plastic insulating material between open contacts, so there is no problems because of deterioration
by arc or leakage current.
* The 9 pieces, large tulip contacts with tungsten-cooper tips have good short circuit carrying capacity,
good making current capacity.
* The interrupting, insulation performances are guaranteed at atmospheric pressure.
SHINSUNG 3 --------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
-------------------------------------------------------------------------------------------------------------------------------SF6 GI Sectionalizer for overhead line

CT's, VOLTAGE SENSORS & INTERNAL BATTERY CHARGING SOURCE


* Because of the dead tank case design, the BCT and screened capacitive voltage sensors can be easily, safely
integrated inside the SF6 tank case
* Spring toggle mechanism with motor can be supplied with battery charging source (Optional)
* 3 CT's of 1000 : 1 ratio installed inside the SF6 tank case
* Automatic CT's shortening device prevent the CT's when the cable is disconnected
* The CT's and voltage sensors connected to the sealing and automatic CT shortening PCB in the mechanism box

BURSTING MEMBRANE
* The bursting membrane burst at the pressure of 4 6 kg.f/cm².G and release the excessive gas to the outside
before the case or bushings destroyed, because of internal fault.
It is located at the opposite side of operating handle and exhaust the gas through safe path.
* The specially chosen and designed Al plate is precisely machined and the thin point is perfectly water sealed
to prevent the corrosion.
* If the bursting membrane operates, actually the gas is fully exhausted and the low gas pressure locking devices
interlocks the electrical/manual operations.

LOW PRESSURE LOCKING DEVICE (OPTIONAL)


* The snap acted SUS diaphragm pressure sensor, sense the low gas and activate the low pressure locking device,
then low pressure target is operated and electrical/mechanical operation is interlocked.
* If this device is operated, the switch maintain it's close/open position, even it endures all the electrical ratings.
* If the SF6 gas is not fully exhausted -in case the air is not still mixed with SF6 gas-, it is possible to just refill
the SF6 gas and reset the low gas locking device to extend the service life, but eventually it should be maintained.

GAS PRESSURE METER & PRESSURE SWITCH (OPTIONAL)


* Through the gas pressure meter at the bottom side, can monitor the gas pressure.
* The pressure switch gives the dry contacts signal to the control, so electrical operation is prohibited during low gas
pressure condition.

MECHANISM BOX
* The stainless steel mechanism box is thoroughly welded to the tank case and the bottom side is rubber gasket sealed
to protect the water, moisture penetration.
* The motor, auxiliary contacts, low gas locking device, sealing and automatic CT shorting PCB is located inside
the mechanism box and it connected to the control cubicle through the control cable and connector.

MANUAL LOCKING DEVICE (OPTIONAL)


* This device is located at manual operating handle side.
* When it is pulled down, then it is toggle acted, maintain the position, interlock mechanically the close/open operation,
and gives the dry contact to the control.
* When it is pushed up, it maintain the position, reset the interlock and gives the dry contact to the control.

ISO9001------------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 4
SF6 GI Sectionalizer for overhead line -------------------------------------------------------------------------------------------------------------------------------

OVERVIEW - CONTROL CUBICLE


The control cubicle is designed for good thermal CONTROL CUBICLE
insulation, well ventilation and to prevent water
penetration. The control cubicle consists of
connectors for control cable & auxiliary power supply,
surge protection and impedance matching circuit,
battery charger, battery, RTU or RTU space,
modem or modem space, thermostatically
controlled heater, etc.

BATTERY & BATTERY CHARGER


* BATTERY Dry lead acid battery
7, 12 or 16 Ah 24 Vdc

* BATTERY CHARGER
Input 220 or 120 Vac
Output max. 1 A Rapid Charging
15 mA Trickle Charging

* POWER SUPPLY
Input 220 or 120 Vac (upon request)
24 Vdc 2 A
Parallel connected with battery

SURGE PROTECTION & IMPEDANCE MATCHING CIRCUIT


* 3 CT's 1000 : 1 (other value available)
* 6 VOLTAGE SENSORS 4 Vac (other value available) RTU
* BATTERY TESTING
check the battery voltage &
charger on load condition.
* Prevention deep battery discharge
* Local/Remote Selection
* Local Close/Open

RTU
The RTU is developed to communicate
with C.C, to measure the electrical quantity,
and to get the fault information.
It's use the DSP for calculation and
-processor for other tasks.
It's can measure the V, I, kW, kVAR,
Power Factor, Harmonics and can detect
the fault current and memory the wave
form for further analyzation.

SHINSUNG 5 -----------------------------------------------------------------------------------------------------------------ISO9001
------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line
HARDWARE

- DSP : TMS 320 - DIGITAL INPUT Max. 32 Point expandable


. Switch Status Close/Open 2
- -PROCESSOR : MC 68302 Lock/Unlock 2
Gas low 1
- MEMORY : EP ROM 128 kB Local/Remote 2
S RAM. 512 kB Handle lock 1
DP RAM 4 kB Door open 1
Battery low 1
- A/D CONVERTER : ADS 7804 12 bit Ext. power 1

- ANALOGUE INPUT : 16 Channel - DIGITAL OUTPUT SBO Control


. 4 Dual Range current inputs . Duration Programmable in 5 milli second
(total 8 channel) increments
Low range measures normal current . Contact Form 1 Form A
High range measures fault current . Contact Rating 30 Vdc @ 2 A
A,B,C,N 0 1 A (RMS) 120 Vac @ 0.8 A
. 6 Voltage Inputs 0 4 V (RMS) . Control Points Remote Close/Open
. 2 Reserved . Lock/Unlock
Gas pressure . Battery Test
Battery etc. . Reserved

* MEASUREMENT

- Instantaneous Metering
. Currents Ia,b,c,n Input currents

. Voltages Va,b,c Wye-connected voltage inputs


. Power MWa,b,c Single-and phase megawatts (wye-connected voltage inputs only)

MVARa,b,c Single-and phase megavars (wye-connected voltage inputs only)

. Power Factor PFa,b,c Single-and phase power factor; leading or lagging

- Demand Metering
. Currents Ia,b,c,n Input currents

. Power MWa,b,c Single-and phase megawatts (wye-connected voltage inputs only)

MVARa,b,c Single-and phase megavars (wye-connected voltage inputs only)

- Max./Min. Metering
. Currents Ia,b,c,n Input currents

. Power MW3p Three-phase megawatts

MVAR3p Three-phase megavars

ISO9001---------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 6
SF6 GI Sectionalizer LBS for overhead line --------------------------------------------------------------------------------------------------------------------

EVENTS
Many kinds of EVENTS with time tags are useful for analysis of the switch, RTU, Communication and Power LIne.

. Power - ON/OFF . Low Gas


. Ext. Power - ON/OFF . Low Battery
. Self Testing Result . Line Voltage - ON/OFF, Source side/Load side
. Change the Settings . Fault - PICK UP/DROP OUT
. Switch - CLOSE/OPEN . Phase Discord
(Remote/Local Communication Port) . One or two Loss of Line Voltage
. LOCK/UNLOCK

* FAULT INDICATOR
The fault information is used for identifying the faulted section and faulted phase. It has the special logics to
distinguish the temporary fault and permanent fault.

- INRUSH RESTRAINT FEATURE


If the current changes from normal current to 0 current, then it blocks the pick-up within preprogrammed time.

- PREDETECTING TIME - software programmable


If the over current condition lasts more than this time, it is validated as the start of a potential fault

- IN PROGRESS
It memory the current, voltage, wave form until the over current condition finish, and it takes the maximum RMS
fault current.

- FINAL
If the over current condition is finished and the current goes to 0 (Back up protection device clears the fault.) or
goes to normal current (forward protection device clears the fault.), it wait the maximum reclosing interval of
back up device, and when the programmed time elapsed it finally decide whether the over current was
temporary or permanent fault.
The every effective over current condition is recorded as the events and the final temporary or permanent fault
Information is recorded as fault indicator information.
It consists of start time, fault current level, end time, number of over load conditions and temporary or
permanent fault information.
The fault indicator can check the forward fault or reverse fault to give the correct fault information.

* COMMUNICATION PORTS
- PORTS 1 Modem DNP 3.0 Level 2
Communication rate 9600 BPS (Programmable)
Interface RS-232C

- PORTS 2 Note Book


Communication rate 57600 BPS
Interface RS-232C

- PORTS 3 LCD
Communication rate 19200 BPS
Interface RS-232C

SHINSUNG 7-----------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
-------------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line

OPERATIONS OF SECTIONALIZER

MINIMUM PICK UP
Phase current : 40 A ~ 450 A
Ground current : 10 A ~ 300 A
If the line current exceeds the minimum pick-up current level and it lasts more than one cycle, the control be armed and
if the current is decreased below one Amps, It finish the count.
This feature prevent the sectionalizer from mis-counting because of the operation of lightning arrestor and the following
power
frequency current. The current restraint feature also prevent the sectionalizer from mis-counting because of downstream
protection devices clear the fault.

* COUNT
1, 2, 3 can be selected
The sectionalizer opens when the counts reaches to the preset number of counts.

* RESET TIME
15 ~ 120 sec
The counts are reset when the line current below the minimum pick-up current during reset time.

* IN-RUSH CURRENT RESTRAINT


Phase multiply : 1×, 2×, 4×, 6×, 8×, 10×, Test
Phase restraint time : 5, 10, 15, 20, cycles
Ground multiply : Block
Ground restraint time : 0.3 ~5 sec
The in-rush restraint feature is set when the control experiences the no current (zero current) without experiencing
the valid fault current. The in-rush restraint feature is reset after preset time when current flows.

* ONE COUNT TO OPEN


If this function is enabled, the counts is modified as one count even it is set to 2 or 3 counts.
This function is automatically rest after 10 seconds from close.

* MANUAL, ELECTRICAL OPERATIONS

[ Manual operation ]
If the right side of operating handle is pulled down, at the final stroke, the switch CLOSE quickly
If the left side of handle is pulled down, at the final stroke, the switch OPEN quickly

[ Electrical operation ]
Push the CLOSE/OPEN button, then the close or open relay is self held and the switch close or open within 0.7sec, If
the switch fails close or open within 2 seconds, the motor automatically stops to prevent battery or motor from damage

ISO9001---------------------------------------------------------------------------------------------------------------------------------------------------SHINSUNG 8
Instantaneous Metering (Current, Voltage, Demand, Phase Angle)

(1) Instantaneous Current and Voltage Metering


When power is on, the following LCD screen appears.

This screen shows Instantaneous metering of line current and line to ground voltage.
Dimension of current is [A], voltage is [kV].
IA, IB, IC is current of A phase, B phase, C phase.
IN is current of neutral line(unbalance current).
Each voltages correspond to A, B, C, R, S, T phase.

(2) Instantaneous Demand and Current, Voltage Phase Angle Metering


You can access the demand and phase angle(current, voltage) screen via the SELECT pushbutton.

* Setting

You can access the main menu screen via the MENU pushbutton.
Then you can access any submenus via INCREASE, DECREASE, and SELECT pushbutton.

SHINSUNG 9---------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
------------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line

(1) Phase Minimum Pickup Current Setting


IP : 40 - 560 [A] ( 1 [A] STEP )

Minimum pickup current setting of phase.

(2) Phase Inrush Current Restraint Multiple Setting

INRPM : 1, 2, 4, 6, 8, 10, BLOCK

During inrush current restraint function is activated, phase minimum pickup current of sectionalizer is applied this
multiple.

Note) During inrush current restraint function is activated, ground minimum pickup current of sectionalizer is blocked.

(3) Phase Inrush Current Restraint Reset Time Setting

INRPT : 5 - 9999, TEST ( [cycle] )

This time decides phase inrush current restraint time of sectionalizer.


During this time, phase inrush current restraint multiple is applied to phase minimum pickup current.

(4) Ground Minimum Pickup Current Setting

IG : 10 - 300 [A], BLOCK ( 1 [A] STEP )

Minimum pickup current setting of ground.

(5) Ground Inrush Current Restraint Reset Time Setting


INRGT : 1 - 9999 ( [cycle] )

This time decides ground inrush current restraint time of sectionalizer.


During this time, ground minimum pickup current is blocked.

(6) Count Setting


COUNT : 1 - 3

Sectionalizer is tripped when fault current count is equal to this count setting.

(7) Count Reset Time Setting


COUNT RESET : 15 - 9999 ( [cycle] )

If count setting is 3 count and fault current count of sectionalizer is 1 or 2, then fault current is disappears,
count goes to 0 after this count reset time.
This time must longer than total summation of the maximum reclosing intervals of backup circuit breakers or reclosers.

Note) One shot lockout function is auto setting. When the sectionalizer is closed, it operates in 1 count setting during
10 [s] automatically.

ISO9001-------------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 10
SF6 GI Sectionalizer for overhead line----------------------------------------------------------------------------------------------------------------------------------

* Event

You can access any submenus via INCREASE, DECREASE, and SELECT pushbutton.

(1) Switching event

Switching(open/close) event of sectionalizer.


Date and time tags are displayed together.
Control is expressed control signal source(AUTO/ LOCAL/ REMOTE/ HANDLE/ NOTEBOOK).

(2) Fault current

Date and time tags are displayed together.


Currents of each phase of the fault detected instance are shown.
The Values of current corresponding each count of sectionalizer is displayed sequentially.

SHINSUNG 11--------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
----------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line

(3) Peak load current

Sectionalizer provides peak demand current metering.


It has 15 minute means demand current in memory. And peak demand of a day is saved also.

(4) Diagnostic

This event is about self test of sectionalizer control circuit and power on, etc.

ISO9001--------------------------------------------------------------------------------------------------------------------------------------------- SHINSUNG 12
SF6 GI Sectionalizer for overhead line------------------------------------------------------------------------------------------------------------------------------

* Status

This item displays numerous status of sectionalizer.

Sub-items of this menu is in the following table.

SHINSUNG 13-----------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
--------------------------------------------------------------------------------------------------------------------------------- SF6 GI Sectionalizer for overhead line

INSTALLATION
During moving or installation the switch, the lifting hole should be used and otherwise the bushing can be destroyed.
* Install the mounting bracket first, lift the switch using the lifting hole and tighten the clamp using the hanger bolts
and nuts.
* The operating handle side should be faced with the pole, if otherwise the lineman can be injured during the operation
of bursting membrane.
* Connect the earth wire firmly to the earth terminal
The grounding line of arrester, earth wire of switch and control cubicle should be T connected to the earthing wire.
* Connect the control cable and the external power cable.
When the cable is not used, not connected, the protection cap should be covered the receptacle.

CONNECTION THE BUSHING TERMINAL

MOLD CORN TYPE


The connection point should be prevented from water penetration and the rubber side should be gripped together
to prevent the mold corn lead from cutting by the vibration or electrolytic corrosion.
The special connector (Cat. No. ST400, ST630, TT400, TT630) is heavily recommended.
After connecting, the connecting point should be wrapped around with self bonded insulating tape.

* NEMA TYPE FLAT TERMINAL


Tin plated copper alloy or aluminium alloy terminal can be supplied.
If use the insulated cable, insert the bird-guard cap first and after connecting the cable, taping the cable entrance
with self bonded insulating tape.

ISO9001------------------------------------------------------------------------------------------------------------------------------------------------ SHINSUNG 14
SF6 GI Sectionalizer for overhead line----------------------------------------------------------------------------------------------------------------------------------

DIMENSIONS - spring toggle mechanism with motor, NEMA Type

SHINSUNG 15-----------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
----------------------------------------------------------------------------------------------------------------------------------SF6 GI Sectionalizer for overhead line

DIMENSIONS - spring toggle mechanism with motor, MOLD CORN Type

ISO9001----------------------------------------------------------------------------------------------------------------------------------------------------SHINSUNG 16
SF6 GI Sectionalizer for overhead line ---------------------------------------------------------------------------------------------------------------------------------

TYPICAL MOUNTING ARRANGEMENT

SHINSUNG 17 ------------------------------------------------------------------------------------------------------------------------------------------------ISO9001
Business Network

„ Headquarters in Korea
Shinsung Industrial Electic Co., Ltd
190-4 Soohyang-ri, Sunghwan-eup, Cheonan-si, Chungcheongnam-do, Republic of Korea
Tel : +82- 41- 582 -5029 Fax: +82-41- 582 - 8752 Email: intlbiz@ssiec.co.kr
Website: www.ssiec.co.kr

„ China Sales Office


Shinsung Industrial Electric Beijing Branch
2# 3F Beijing International Friendship Garden, A2 Zoujianzhuang Road, Beisanhuan, Beijing, China
Phone: +86 10 6464 9482 , Fax: +86 10 6463 7756, Email: sbejing@ssiec.co.kr

„ Sales Representative in United Kingdom


Lucy Switchgear
Walton Well Road Oxford, OX2 6EE, United Kingdom
Phone: +44 1865 311 411, Fax: +44 1865 3105
Email: sales@wlucy.co.uk
Website: www.lucyswitchgear.com

Information and specifications in this document are subject to change without prior notice.