Вы находитесь на странице: 1из 1

CHAROTAR UNIVERSITY OF SCIENCE AND TECHNOLOGY

CHANDUBHAI S PATEL INSTITUTE OF TECHNOLOGY


U & P U PATEL DEPARTMENT OF COMPUTER ENGINEERING
ACADEMIC YEAR: 2015-2016
Subject Name: Software Engineering Semester : 4th Semester
Subject Code: CE 220.01 Academic years: Dec-May 2016

Practical List

Sr.
Aim Hrs.
No
1. Study and compare different software process models. Based on this study complete the
2
given excel sheet.
2. Design questionnaires and other Techniques to elicit the Requirements for a given Project.
2
(Visual Paradigm)
3. Determine and analyze the functional non- functional Requirements for a given Project
2
(Virtual Lab)
4. Design System Requirement Specification (SRS) document for a given project.
2
(IEEE Standard)
5. Develop a Software Project Management Plan using Microsoft Project 2003/2007.
(Primavera, Turbo project, Risky project, Gantt Project) And also Prepare Software Project 4
Management Plan (SPMP document)
6. To study the estimation techniques using LOC, Function Point and COCOMO. After manual
calculation use COSTAR/SYSTEM STAR Tool to calculate and explore other parameters 2
for estimation of Cost of your Project.
7. Build design documentation for given project in Microsoft Visio 2007 using:
1. Procedure oriented methodology (DFD up to level 2, Structure chart)
6
2. Object oriented methodology (all UML diagrams)
3. GUI Design (Pencil Tool)
8. Design Coding Standards and Guidelines for a given project.(C,C++,Java, HTML etc.) 4
9. Design the following for given project (Black Box Testing)
1. Test case
2. Test Suite 4
3. Testing Strategy
Also Design Test Cases using White Box Testing)
10. Study different CASE tools and Testing tools (win runner, load runner, Selenium) and
2
prepare a summary report.

Вам также может понравиться