Академический Документы
Профессиональный Документы
Культура Документы
This information has been prepared for use by a limited number of parties and does Michael Morris
not necessarily purport to provide an accurate summary of the Property or any of the michaelm@bcarc.com
documents related thereto, nor does it purport to be all-inclusive or to contain all of 512.481.0092
the information which prospective investors may need or desire. All projections have
been developed and are based upon assumptions relating to the general economy,
competition, and other factors beyond the control of Manager, and therefore are
subject to variation. No representation is made by Manager as to the accuracy or
completeness of the information contained herein, and nothing contained herein is,
or shall be relied on as, a promise or representation as to the future performance of
the Partnership. Manager and their constituent partners, officers, agents, attorneys
and employees disclaim any and all liability for representations and warranties,
expressed and implied, contained in, or for omissions from, this information or any
other written or oral communication transmitted or made available to the recipient.
This information does not constitute a representation that there has not been a change
in the business or affairs of the Partnership or Manager since the date of preparation
of this information. Analysis and verification of the information contained herein is
solely the responsibility of the prospective investor.
900 Old Koenig Total /Unit /NRSF 900 Old Koenig Total /Unit /NRSF
Land $ 9,988,000 $ 44,000 $ 112 Land $ 12,276,000.00 $ 44,000.00 $ 137.47
Construction $ 31,436,927 $ 138,489 $ 196 Construction $ 38,373,458.95 $ 137,539.28 $ 194.46
A&E $ 1,524,896 $ 6,718 $ 9 A&E $ 1,771,961.96 $ 6,351.12 $ 8.98
Financing & Legal $ 1,081,317 $ 4,764 $ 7 Financing & Legal $ 1,313,592.27 $ 4,708.22 $ 6.66
Operating Deficit $ 1,879,008 $ 8,278 $ 12 Operating Deficit $ 2,401,079.96 $ 8,606.02 $ 12.17
Etc. $ 4,140,191 $ 18,239 $ 26 Etc. $ 4,712,255.23 $ 16,889.80 $ 23.88
Total Project Cost $ 50,050,338.96 $ 220,486.07 $ 311.76 Total Project Cost $ 60,848,348.37 $ 218,094.44 $ 308.36
Cash Flow Year 1 Year 2 Year 3 Cash Flow Year 1 Year 2 Year 3
Base Rent PSF $ 2.32 $ 2.36 $ 2.42 Gross Rent PSF $ 2.31 $ 2.35 $ 2.41
Gross Potential Rent $ 4,466,581.92 $ 4,545,142.49 $ 4,662,081.60 Gross Potential Rent $ 5,463,167.64 $ 5,559,259.11 $ 5,725,773.97
Vacancy/Other Loss $ (123,994.92) $ (128,708.55) $ (69,027.81) Vacancy/Other Loss $ (183,790.06) $ (189,555.55) $ (196,231.86)
Effective Gross Income $ 4,342,587.00 $ 4,416,433.94 $ 4,545,259.68 Effective Gross Income $ 5,279,377.58 $ 5,369,703.57 $ 5,529,542.11
Operating Expenses $ (1,145,486.60) ($1,157,983) $ (1,217,377.38) Operating Expenses $ (1,263,229.68) ($1,273,180) $ (1,342,983.02)
Net Operating Income $ 3,197,100.40 $3,258,451 $ 3,327,882.30 Net Operating Income $ 4,016,147.90 $4,096,524 $ 4,186,559.09
Return On Cost 6.39% 6.51% 6.65% Return On Cost 6.60% 6.73% 6.88%
Exit/Hold Period 3 Years 4 Years 5 Years Exit/Hold Period 3 Years 4 Years 5 Years
Exit Cap 5.25% 5.25% 5.25% Exit Cap 5.25% 5.25% 5.25%
Net Sale Proceeds $ 63,492,308.77 $ 66,150,414.69 $ 68,895,502.74 Net Sale Proceeds $ 79,631,827.33 $ 83,013,738.20 $ 86,571,802.01
Loan Payoff $ (32,632,690.20) $ (32,693,721.08) $ (32,721,171.96) Loan Payoff $ (39,697,943.37) $ (39,773,080.34) $ (39,808,660.97)
Fees $ (63,207.92) $ (132,136.71) $ (202,399.88) Fees $ (68,588.54) $ (152,403.95) $ (237,851.48)
Net Profit $ 30,796,410.65 $ 33,324,556.90 $ 35,971,930.89 Net Profit $ 39,865,295.42 $ 43,088,253.90 $ 46,525,289.56
Gross Margin 21.17% 24.34% 27.35% Gross Margin 23.59% 26.70% 29.71%
Return Metrics 3 Years 4 Years 5 Years Return Metrics 3 Years 4 Years 5 Years
IRR 21.25% 17.82% 15.74% IRR 23.89% 19.69% 17.21%
Equity Multiple 1.76X 1.90X 2.05X Equity Multiple 1.87X 2.02X 2.18X
SETBACKS
FRONT YARD 5 FT
STREET SIDE YARD 5 FT
INTERIOR SIDE YARD N/A
REAR YARD N/A
D
COMPATIBILITY RESTRICTIONS NIG
BLV
LN
AR
0’ - 25’ (FROM TRIGGERING PROPERTY) NO CONSTRUCTION
AM
NL
25’ - 50’ 30’ HEIGHT (2 STROIES)
NOTE: Adjacent church considered as triggering property. Bercy Chen Studio has
engaged church & city with positive support for waiver considering hardship due to
heritage tree. Board of Adjustments approval is pending.
CONCEPTUAL PLAN
• RETAIL SPACE AT STREET LEVEL ALONG LAMAR, 5 LEVELS OF MULTI-FAMILY
• URBAN INFILL ON TRANSIT CORRIDOR
• ACTIVE LIFESTYLE AND URBAN LIVING
• PRESERVE EXISTING HERITAGE TREE
• GARAGE PARKING
VD
R BL
categorized as a low-rise (less than 85 feet in International Building Code jurisdictions), wood-
MA
framed construction results in significant cost savings compared with high-rise buildings.
N LA
The 40% parking reduction is applied to adjust the total parking requirement (complying with City
of Austin Transportation Criteria Manual 9.6.0). The multi-family building incorporates courtyards OLD
KOE
to bring light and air into interior spaces and ground floor storefront space along Lamar to activate N IG L
N
the urban fabric of the site.
DEVELOPMENT STATISTICS
DIAGRAM LEGEND
STAIR
TRASH
TRASH
PICKUP
ENTRY DRIVE / FIRE LANE
RETAIL
STAIR
MAIN SPACE
LOBBY
DOWN
ENTRY DRIVE / FIRE LANE
STAIR
STAIR
TRASH
STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO
1 BEDROOM
STORAGE
GUEST LIGHT
1 BEDROOM 1 BEDROOM 1 BEDROOM SUITE WELL 3 BEDROOM 2 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM
STAIR
2 BEDROOM
STAIR
STORAGE
1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM 1 BEDROOM
STAIR
VD
R BL
The compatibility waiver allows for a single large courtyard in-lieu of the two courtyard in the other
MA
scheme. This has the added benefits of a more efficient floor plan and 55 additional units. Bercy
N LA
Chen Studio has engaged an attorney to assist with this waiver. Should this pass, the Property could
be entitled for a total of 277 units.
OLD
KOE
N IG L
N
DEVELOPMENT STATISTICS
DIAGRAM LEGEND
STAIR
TRASH
TRASH
PICKUP
ENTRY DRIVE / FIRE LANE
MAIN
LOBBY
RETAIL
STAIR
SPACE
DOWN
ENTRY DRIVE / FIRE LANE
STAIR
LOBBY
STAIR
STAIR
TRASH
STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO
STOR.
1 BEDROOM
LIGHT
1 BEDROOM
WELL
3 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM
2 BEDROOM
STAIR
2 BEDROOM
STAIR
1 BEDROOM
AMENITY / POOL 1 BEDROOM 1 BEDROOM
DECK BELOW
2 BEDROOM
1 BEDROOM
1 BEDROOM 1 BEDROOM
2 BEDROOM
1 BEDROOM
1 BEDROOM 1 BEDROOM
STAIR
7 ORACLE
I-35
8 ORACLE (NEW CAMPUS)
TX-1 17
9 FREESCALE
15
10 16
10 VMWARE
PROJECT SITE
ACC 290 11 DELL
HIGHLAND
12 IBM
130
TRIANGLE 13 FACEBOOK
i
8m
14 INDEED
6mi
MUELLER
i
P.U.D.
4m
71 2 15 RACKSPACE
i
2m
UT AUSTIN
TX CAPITAL 9 16 SILICON HILLS
CBD 22
13 17 SAMSUNG
4 14 26
24 25
18 DATA FOUNDRY
23 28
27 21
3 19 XBIOTECH
8
290 20 CYRUSONE
21 UBER AUSTIN
22 FAVOR
71
TX-1 20
19 23 USHIP INC.
18
Austin-Bergstrom 24 CONDÉ NAST
International
183 Airport 25 C3 PRESENTS
26 HANDSOME
I-35
27 LIVESTRONG FOUNDATION
28 FLOSPORTS
DRIVE TIMES FROM PROJECT SITE
29 TACC
HIGHWAY 183 I-35 TX-1 CBD THE DOMAIN
30 AMAZON
31 FC STADIUM
A MUELLER
lot size: 711 acres
REEK
CRESTVIEW STATION 1 B THE GROVE (underconstruction)
AL C
SHO mixed-use: 75 acres. 1,550 residentional units
AIR
TEXAS DEPARTMENT OF PUBLIC SAFETY CAMPUS
PO
D
lot size: 44 acres
RT
B
W E TEXAS SCHOOL FOR THE BLIND
LVD
KO lot size: 45 acres
EN
TX-1 IG
LN F THE TRIANGLE
lot size: 6.05 acres
PROJECT SITE
EK
FOOD/DRINK/AMENITIES
HIGHLAND STATION 2
RE
YC
•Thunderbird Coffee •Monkey Nest Coffee •Little Woodrow’s
DR
•Brentwood Socialhouse •Central Market •HEB •Target •Dia’s Market
MUSTANG BARTON PARK •Han Yang Market •Stiles Switch BBQ •P Terry’s •Pinthouse Pizza
BRENTWOOD STATION 2 D •Hoppdoddy Burger Bar •Fonda San Miguel •DK Sushi •Dart Bowl Bowling
BURNET RD
0.5 m
i 290
D
BLV
EK
•Galaxy Highland Theater (1.6 mi away) •Barley Swine (1.4 mi away)
RE
RC
3
AR
5301 LAMAR & N LOOP
LLE
AM
WA
45
TH
NL
51
ST ST
ST
i
1.5 m
AL
AD
GU
METRORAPID - 801
A
•UT Intramural Field (1.3 mi away) •McCallum Arts Center (0.2 mi away)
METRORAIL - RED LINE
5 HYDE PARK STATION
2501 W. CREA
2 The Copeland
Braker Ln Development
Terrain Capital 2019 Oct-19 328 747 $2.37 $1,769 244,889 4.20% $72,250,000 $220,274 $295
Total / Average 341 765 $2.41 $1,848 4.20% $76,125,000 $223,452 $292
2 mi
900 Old Koenig / 5916 N Lamar Bercy Chen + Partner 285 750 $2.50 $1,875 213,750
W
AN
DE
RSO
NL
N. 183
TX-1
D.
CLASS A MULTI-FAMILY SUPPLY PIPELINE - NORTH CENTRAL AUSTIN SUBMARKET
BLV
as of Q4 2019
AR
AM
1 mi
NL
Property Address Developer Units Acres Units / Acre Delivery Status
7
1 1
.
N. Lamar @ N. Loop 5210 N. Lamar Grey Forest Development 228 1.87 121.9 Mar-22 Under Construction
BURNET RD
2 Aura on Lamar 5629 N. Lamar Trinsic Development 279 3.34 83.6 Oct-21 Under Construction
3 The Pearl 1303 Koenig Lane Ledcor Development 383 4.95 77.3 Sep-20 Under Construction
6
4 Crestview Highline 6324 N. Lamar Urban Genesis 102 1.20 85.2 Dec-21 Approved
AIR
PO
5 North at Crestview Station 6705, 6701, 6613, 6611 N. Lamar & 6700 Shirley Alliance Residential 298 2.71 110.0 Sep-21 Submitted
RT
5
BLV
W
KO 6 St. John's West 601 St. John's Ave Journeyman Construction 297 2.13 139.7 Apr-20 Under Construction
D.
ENIG
LN 4
. 7 Crestview Commons Phase IV 7400 N. Lamar High Street Residential 226 2.89 78.2 Jul-21 Under Construction
3 8 8 Airport Center 212 W. Highland Mall Blvd Slate Real Estate Partners 319 7.68 41.6 Jul-22 Submitted
10
9 FiveTwo at Highland 6140 Highland Campus Dr Greystar 390 3.75 104.0 Mar-20 Under Construction
9 10 Highland Highline 418 E. Highland Mall Blvd. Urban Genesis 120 1.01 118.8 TBD Submitted
900 Old Koenig / 5916 N Lamar Bercy Chen + Partner 285 2.05 138.8 Jan-23
1 290
E. 4
5TH Project site
ST.
I-35 Class A Multi-family Supply Pipeline
Multi-family Asset
RECENT MULTI-FAMILY / MIXED-USE LAND SALES COMPS - NORTH CENTRAL AUSTIN SUBMARKET
as of Q4 2019
Units /
Property Address Developer Date Acres $ Price $ / SF $ / Unit Units* Acre
2 mi
1 6901 N. Lamar Condos 6901 & 6917 N. Lamar IntraCorp UC 2.23 $10,000,000 $102.81 $30,120 200 148.7
W 6705, 6701, 6613, 6611
AN
DE
RSO
2 North at Crestview Station
N. Lamar & 6700 Shirley
Alliance Residential UC 2.71 $12,149,929 $103.00 $40,772 298 110.0
NL
N. 183
TX-1 3 6725 Shirley 6725 & 6719 Shirley Pielet Brothers Construction Mar-20 0.46 $1,342,519 $67.00 n/a n/a
4 UG Highland 418 E Highland Mall Blvd Urban Genesis Oct-19 1.01 $2,243,776 $51.00 $18,698 120 118.8
5 Aura on Lamar 5629 N. Lamar Trinsic Property Group Nov-18 3.39 $8,126,000 $55.01 $29,125 279 82.3
6 Crestview Highline 6324 N. Lamar Urban Genesis Nov-18 1.20 $2,293,835 $44.00 $22,489 102 85.2
7 The Pearl 1301 Koenig Lane Ledcor Development Jul-17 5.35 $15,750,000 $67.62 $41,123 383 71.6
D.
BLV
8 Flora Apartments 5406 Middle Fiskville JCI Residential Mar-17 1.33 $2,045,000 $35.36 $10,541 194 146.1
AR
AM
1 mi 9 8518 Burnet Rd 8518 Burnet Rd Sackman Development Jun-15 2.79 $8,500,000 $69.94 $37,778 225 80.6
NL
10 Airport Center 212 W. Highland Mall Blvd Slate Real Estate Partners May-14 7.68 $16,720,724 $50.00 $52,416 319 41.6
.
BURNET RD
11 Camden Lamar Heights 5300 N. Lamar Camden Residential Jun-13 4.83 $8,700,000 $41.35 $30,000 290 60.0
12 West Koenig Flats 111 E. Koenig Lane Stillwater Residential Mar-13 2.39 $3,610,000 $34.69 $17,190 210 87.9
1 13 Burnet Flats 5453 Burnet Rd Ardent Residential Dec-12 2.31 $3,200,000 $31.76 $17,877 179 77.4
AIR
2
RT
3
BLV
W * where applicable
KO 900 Old Koenig / 5916 N Lamar Bercy Chen + Partner 2.05 $8,946,353 $100.00 $31,391 285 138.8
D.
ENIG
LN 6
.
13
7 10
4
11
12
290
E. 4
5TH 8 Project site
ST.
I-35 Multi-family / Mixed-use Property
D.
7 Infinity at the Triangle II 115 971 $1,961 $2.02 97%
BLV
AR
8 ECHO 274 879 $1,742 $1.98 95%
AM
1 mi
NL
4 9 Elan Parkside 309 816 $1,613 $1.98 89%
.
6
BURNET RD
W
KO
D.
12
10
9
1
2
290
E. 4
5TH
3 Project site
ST.
13 I-35 Multi-family Property
8
11
7
N B
Research Center MASTERSON 1431
Burnet
ell B
CROSSROADS 1 35
Lamar
Thursday & Friday only d
Sam d
s Blv
lvd
len Blv Bas
Oh RUNDBERG 324, 325
tone
s Rd ettler
Old S
183
hites
N M
OHLEN FAIRFIELD 12:30 AM – 2:30 AM 20 MIN E W
Par
175
ays
BRUSHY
me
Anderson NORTH LAMAR
r Ln
NORTHCROSS
Blvd CREEK
St
TRANSIT CENTER 79
Northcross one
itest
Shopping Center
JUSTIN
1, 323, 383
CRESTVIEW
801 SAT URDAYS 1431 W Wh
CEDAR ck
Ave
734
Ro
Justin
1, 7, 300, 350 PARK
und
S B
6 AM – 8 PM 15 MIN
Bu
PROJECT SITE
rne
Ro
e
B
ll
290 183
Koenig BRENTWOOD
t
8 PM – 2:30 AM 20 MIN
lvd
DOWNTOWN CORRIDOR ALLANDALE 1, 337 620
49th St 45
NORTH LOOP EAST
MLK
18th
MLK
NORTH LOOP Lakeline 45
TRIANGLE 1
801 SUNDAYS
Lamar
SUNSHINE
17th
MUSEUM 45
MUSEUM (Northbound)
Central
(Southbound) ROSEDALE 6 AM – 7 PM 15 MIN
Par
Market
1, 3, 18, 19, 15th 1, 3, 18, 19, HYDE PARK 1
38th 1
me
20, 803
20, 803
th Seton Hospital
38
rL
TOLL
7 PM – 11:30 PM 20 MIN
Rese
WEST
n
31ST STREET r
13th
CAPITOL 38TH A nderson Mill eil D WELLS
arch
1, 3, 19, 803
CAPITOL 12th
(Northbound)
UT/DEAN KEETON 620 McN BRANCH
l vd
Mo
MetroRapid is a frequency-based Rd
B
(Southbound) 1, 3, 19, 20, 1, 3, 19, 20, 803 University ngs
Pa
LAVACA
Spi
AUSTIN HISTORY
AUSTIN
Guadalupe/Lavaca
D Capital
Kramer
CENTER 8th
(Southbound)
HISTORY 35 weather-related conditions. MetroRail Station
O
CENTER 12th
Capitol Ho
CAPITOL wa
183
RI V E R
1, 2, 3, 4, 6, 7, 10, (Northbound)
19, 20, 30, 803 6th 11th Complex r
1, 2, 3, 4, 6, 7,
Ln
d
5th 10, 19, 20, 30, Downtown
Congress
Rd
Blvd
Barton
20, 30, 803 Hw
as
Burnet
Lamar
Cesar Chavez
1st St
ar
35
of
S 1st
Lam
al
pit 1
Palmer Run
Stops for connecting routes may require walking Riverside 0 1 2 3 Miles 2222 35
ron
Events Center dbe
Ca
1-2 blocks from MetroRapid Stations. Plan your LAMAR SQUARE SOCO 1 rg
xpwy
Ca m e
trip ahead: capmetro.org/planner. Monroe Ln
0 2 4 6 Kms
SoCo District
ac E
OLTORF WEST OLTORF 1, 300
ar
Oltorf
Lam
S. Congress
LEGEND
Mop
1st
St Edward’s
BLUEBONNET
uth
University 360
So
Rd
MetroRapid 803 TRANSIT CENTER
Dr
290 stla
WESTGATE ke s
Burnet/South Lamar ST. ELMO Highland
n
Dr 183
ero
e
TRANSIT CENTER
con
Westgate Stassney
Cam
Bal
Shopping Little Texas
Rd
MetroRapid Stops
Center LITTLE TEXAS 51s 290
1 Bee Cave 45t
t S
t
s R 35
e
1 Connecting Route h St
dal
William Cannon PLEASANT HILL d th
St
ing
S.
St
t in
Blvd
Park & Ride 51s
Gua Blvd
1, 333, 201
Spr
t S
Co
upe
Aus
A
pac Expw
t
ng
MetroRail Station
ion
ar
dal
e
res
irpo
Lak
Lam
3, 10, 201
osit
s
rt Blvd
SOUTHPARK Lake
Exp
(Coming soon)
SLAUGHTER
University Jr Blvd
Au
King
Mo
Map not to scale Slaughter MEADOWS B of Texas Luther
Col o ra
sti
Southpark Meadows 1 15th S Martin
nB
ee
Shopping Center av t
lvd
do
C
es MLK, Jr
Ri
r
ve
360 Rd 183
Downtown
Cesa
Destinations | Effective August 18, 2019 – January 4, 2020 | capmetro.org | GO Line 512-474-1200 1 AUSTIN r
Chav
ez St Plaza Saltillo
Lad
y
Bird
Blvd L ake
e
ss Av
ar
St
am 35
Riv
71 L Olto
gre
1st
rf 183
er s
St ide
290
Con
Dr
S
Sla
S
Ln
u ghter Ln
die
Bro
900 OLD KOENIG / 5916 N LAMAR | REVISED 2020.06.17 18
To Georgetown
45
TOLL
To Hutto
LAKELINE
Howard Ln Stoney
325
HOWARD Walnut Creek LEGEND TECH
METROBUS Creek
A CC
To Georgetown SOUTHEND METRORAPID
Proposed Park & Ride
Author: Rebecca Flores, Daranesha Herron (KVUE)
The project will also include new MetroExpress routes, seven new MetroRapid
subway system in Downtown Austin
Enhanced MetroRapid Route WILDHORSE
Circulator
Published: 8:17 AM CST March 6, 2020
HIG
Potential Future Extension
Metric Bl
RUTLAND Tunnel
Updated: 5:24 PM CDT March 9, 2020
HLA
SCHEMATIC MAP
Gold Line
routes, the Gold Line Bus Rapid Transit route and 14 'Park and Rides.'
NOT TO SCALE
LEANDER
02 / 04 Light rail and bus rapid transit
ND
45
Rundberg Ln
TOLL
325
TO T
CROSSROADS RUNDBERG
AUSTIN, Texas —will
The project Austin drivers
also deal with
include new traffic on a daily basis,routes,
MetroExpress but a newseven
Capital new
Metro MetroRapid
plan is aimed to
EC
To Hutto
LAKELINE
help mend some of those issues, and we now have a look at what the future CapMetro could look like.
HR
routes, the Gold Line Bus Rapid Transit route and 14 'Park and Rides.'
GREEN LINE
Bur
Howard Ln Stoney
FOUR
325 POINTS OHLEN 325
IDG
TECH Creek LBJ
NORTH LAMAR
net
HOWARD Walnut Creek RIDGE Park RE 10 High School
E
Metro Park PARMER
D TRANSIT CENTER ELGIN CapMetro on Friday unveiled its plan for a new transit system that includes a light rail and an underground
Rd
PARMER
LI
N Lamar Bl
ACC
Northridge
BROADMOOR/DOMAIN
BRAKER LN BRAKER
NORTHCROSS NE
MANOR
DELCO CENTER AUSTIN,
transit TexasThis
tunnel. — Austin
comesdrivers deal
after the with traffic
public on a dailyprovider
transportation basis, but a new Capital
announced Metrothe
in January plan is aimed to
Project
KRAMER
130
TOLL help mend some of those
Connect transit system. issues, and we now have a look at what the future CapMetro could look like.
BUR CHACA LL
AND
300 St Johns Ave
M E NO A K H I
MCKALLA
A CC
d
or R
SOUTHEND
CapMetro on Friday unveiled its plan for a new transit system that includes a light rail and an underground
NET
CRESTVIEW WILDHORSE
H IG
LOOP 360
Metric Bl
RUTLAND
Man
HLA
transit PARK This comes after the public transportation provider announced in January the Project
tunnel.
TO
Emma
COLONY
ND
Rundberg Ln
Long 325
TO T
CROSSROADS RUNDBERG
Metro SPRINGDALE Connect transit system.
COLONY
PARK TOWN
EC
KOENIG CENTER
ALLANDALE CENTER
GREEN LINE
Bur
LBJ
NORTH LAMAR
CapMetro shared the planEXPO with the Austin City Council on Monday.
GE
net
RE 10 High School
D TRANSIT CENTER
HIGHLAND WHELESS CENTER
Rd
LI LOYOLA/
51st St CapMetro announces new transportation plan, including potential underground transit system
N Lamar Bl
d
TEXAS HEALTH CLARKSON
Mass
Street;transit: How Austin
under Fourth Streetcompares
to to other
Trinity Street; cities
and underwith lightStreet
Trinity rail systems
from Fourth Street to Lady Bird Lake.
or R
7 BERKMAN/ DECKER
NET
Man
TO
/
Emma
COLONY PARK
Long
Bl
Metro PROJECT SITE HYDE COLONY
LK
SPRINGDALE
SHOPPING EXPO PARK
PARK TOWN
"It also helps facilitate the service, make it go smoother, make it more reliable and allows us to carry more
M
Park CENTER
1 mins walk to Koenig Station
ALLANDALE KOENIG CENTER
38½ St AIRPORT
HIGHLAND
51st St Seton
WHELESS
LOYOLA/
HEMPHILL
HANCOCKCENTER
EXPO BLVD people that way," said Jackie Nirenberg, CapMetro community engagement manager. "What we're finding
NORTH 300 WESTMINSTER JOHNNY
LOOP Hospital PARK
MORRIS ST. DAVID’S
from a lot of the other agencies around the country is that they wish they had constructed a tunnel when
Ex
Lamar Bl
TRIANGLE PHILOMENA
MLK
20
po
Dr
TEXAS HEALTH 7 CLARKSON BERKMAN/ UT DECKER 2 130 because it does facilitate quicker movement and the capacity to
they started constructing their system /
sit
San Jacinto Bl
COMMISSION
gs
MUELLER
EAST 300 TOLL
rin
ion
335 University
Bl
HYDE LAFAYETTE
Sp
carry more people so we feel we need to do that from the beginning."
LK
Bl
PARK of Texas
M
k
AIRPORT
UT/WEST MALL EAST US 183
Oa
38½ St
HANCOCK BLVD
Seton LOOP HEMPHILL MLK
Hospital
360 PARK 20ST. DAVID’S
Ex
Lamar Bl
MEDICAL
The project will also include new and expanded MetroExpress routes, seven new MetroRapid routes, the
po
Dr
UT 2 130 ACC
LK
SCHOOL
sit
San Jacinto Bl
gs
EAST 300
M
EASTVIEW
TOLL
rin
ion
GOLD LINE
335 University LAFAYETTE
Sp
Gold Line Bus Rapid Transit route and 14 'Park and Rides.' Nirenberg with CapMetro said they need to act
Bl
of Texas
Dell Seton
k
SCHOOL
M
EASTVIEW
CAPITOL WEST
GOLD LINE
Bird
Lake
These are renderings of the proposed project.
Zilker Long AUDITORIUM
Center SHORES Roy G. Guerrero Lady
Park Bird
7 WATERFRONT ZilkerCO River Park Long AUDITORIUM LTo
akBastrop
e
Center SHORES Roy G. Guerrero
LAMAR Rive ParkLAKESHORE 17
SQUARE TRAVIS
HEIGHTS
rsid
e Dr ACC 311
7 WATERFRONT CO River Park PHOTOS: CapMetro's To Bastrop
Project
According to the transportation Connect
provider,plan
here's a detailed look at what the plan includes:
S Congress Ave
7 BLUE LINE
Burton Dr
AUS
HEIGHTS
e Dr Light Rail Transit (LRT)
Hwy – These are high-capacity transit vehicles accommodating up to four times more
PHOTOS:per trip. CapMetro's Project Connect plan
S Congress Ave
B
the proposed Orange and Blue Lines:
Parker Ln
Montopolis Dr
Gr art
S 1st St
7
PLEASANT VALLEY
ee on AUS
Bl
nb Cr
ar
el ee 7
La
t k OLTORF WEST
S
BRODIE OAKS
ST EDWARD’S
St Edward’s OLTORF Orange Line: Austin-
University Bergstrom
Ben MANCHACA 300 Light Rail from
InternationalLamar Transit Center (US Highway 183 and North Lamar Boulevard) along
North
Pa
311
th
ORANGE LINE
White Bl
Ba
er
Parker Ln
Montopolis Dr
Ln
G rSOUTH
r t CONGRESS the North Lamar/Guadalupe corridor, University of Texas campus, downtown to Lady Bird Lake
PLEASANT VALLEY
WESTGATE o Airport
eTRANSIT
e n n CCENTER
ST. ELMO
Bl
TRANSIT
WESTGATE CENTER
and along South Congress to Stassney Lane.
ar
be re
/
m
BRODIE
ek
l t 10 McKinney 7
La
West Gate
HILL
801 MetroRapid bus service will continue from North Lamar Transit Center to Tech Ridge and
Blvd
South Austin
STASSNEY
State ST EDWARD’S
TO BURNET
MENCHACA
Stassney Ln
311 BRODIE OAKS Park
DOVE SPRINGS St Edward’s
University Stassney to Slaughter lanes. These routes would be converted to LRT as resources become
Pa
311
th
White Bl
er
Ln
Southpark
Meadows
GOODNIGHT South Austin333 State
STASSNEY
TO BURNET
MENCHACA
Stassney Ln
To San Marcos Park
3/4/2020 311 DOVE SPRINGS
Bus Rapid Transit (BRT) – These are high-capacity transit vehicles also operating in transit-only lanes that
operate free from street traffic – moving more people and out of car traffic.
WILLIAM CANNON
S 1st St
William Cannon Dr
900 OLD KOENIG / 5916 N LAMAR | REVISED 2020.06.17
7 Gold Line: BRT will be from 130
Austin Community College’s Highland campus through downtown to the
19
333 TOLL
CHERRY CREEK WILLIAM CANNON
333
NOT FOR REPRINT
Although there has been a drop in widely–marketed multifamily listings for sales, deals are still
moving ahead o -market.
By Ross Todd | May 15, 2020
��cials at Austin, Texas-based multifamily acquisitions and analytics �rm ��erd say there appears to be a
robust market for o�-market deals for large rental properties developing in the wake of the coronavirus
pandemic. According to the U.S. Census Bureau, the percentage of Americans living in rental property was at
a 50-year high (https://censuscounts.org/whats-at-stake/will-you-count-renters-in-the-2020-census/) coming
into the �rst quarter of 2020 as stay-at-home orders began to take hold across the nation. According to data
from iPropertyManagement (https://ipropertymanagement.com/research/renters-vs-homeowners-statistics),
36.7% of Americans were renting as of February.
�en �o�, the founder of Multi-�ousing �quity Partners who is now the president, acquisitions and a partner
at ��erd, says that owners who had plans to sell which were often a year in the making are understandably
concerned that properties coming onto the market in the current economic might be perceived as
distressed.
“We saw this during the �reat �ecession,” �o� said. “The fact is, heading into this current situation,
transaction volume was high every month. The second and third quarters of this year were expected to see
incredible volume. Why? Because owners targeting their assets for exit now made those disposition
decisions a year ago, or more, long before shelter-in-place,” �o� said.
�o� added that the sure�re way to avoid the perception that the property you’re o�ering for sale is
distressed is to keep the listing o�-market.
Travis Farese, Founder and C�� of ��erd, said that despite a signi�cant drop in public listings, his company
is only seeing “a slight decrease in investor demand.” Although underwriters have made a downward
adjustment to near-term rental growth assumptions, Farese said “the fundamentals of the overall asset class
remain, our clients are moving forward with acquisition campaigns.”
Says Farese: ” While there’s a slowdown in immediate near-term transaction activity – as investors and sellers
work to come to agreement on ��nding the �oor’ in collections and ��� – this pause will only serve to create
pent-up demand.”
https://www.globest.com/2020/05/15/coronavirus-moving-more-multifamily-deals-off-market/?printer-friendly 1/1
As the initial impacts of coronavirus became clear, apartment renters reacted by throttling
back their searches for new places to live. The decline in search volume on CoStar apartment
listing platforms coincided with a downturn in rents, which had peaked nationally on March
11. That search volume
5/5/2020 CoStar Newsfell until
- Recent Apartmentlate March,
Searches when
Offer Early Hints it Demand
About Future started to turn the corner.
5/5/2020 CoStar News - Recent Apartment Searches Offer Early Hints About Future Demand
Examining
Examining changes
changes in user
in user searches by searches by some
market reveals market reveals
familiar some
patterns. Therefamiliar
are a patterns. There are a
handful of major
handful markets markets
of major where userswhere
living inusers
the market increased
living in thetheir searching
market in other
increased their searching in other
markets, while users in other markets decreased their searches for those stressed markets.
markets, while users in other markets decreased their searches for those stressed markets.
https://product.costar.com/home/news/shared/1708394502?utm_source=newsletter&utm_medium=email&utm_campaign=personalized&utm_content… 1/5 They include Houston (energy), Las Vegas and South Florida (tourism) and Cleveland and
They(manufacturing).
Detroit include Houston (energy), Las Vegas and South Florida (tourism) and Cleveland and
Detroit (manufacturing).
5/5/2020 CoStar News - Recent Apartment Searches Offer Early Hints About Future Demand
In many respects, recent search results reflect long-held expectations about how migration cycles tend to reset in downturns.
(Getty Images)
Today, apartment search activity has largely recovered. But that does not necessarily mean
Today, apartment search activity has largely recovered. But that does not necessarily mean
demand
By Andrew
demand and higher
rents willrents
Rybczynski
and higher will followsome
follow immediately; immediately; some
renters likely will skiprenters likely
a move this will skip a move this
season,
CoStar
season, rather
Advisory
rather than merely
Services
than merely delay delay
�nding a new �nding a new
place to live. place to
Furthermore, thelive. Furthermore,
employment the employment https://product.costar.com/home/news/shared/1708394502?utm_source=newsletter&utm_medium=email&utm_campaign=personalized&utm_content… 3/5
environment does not lend con�dence to strong, near-term demand, a sentiment re�ected in
environment
April 27, 2020 does
| 3:21not lend con�dence to strong, near-term demand, a sentiment re�ected in
P.M.
CoStar’s current apartment forecasts. This nuance is evident in the way search behavior has
CoStar’s
As the
changed current
initial
in recent apartment
impacts
weeks. forecasts.became
of coronavirus clear, is
This nuance evident inrenters
apartment the way searchby
reacted behavior has
throttling
changed
back theirinsearches
recent weeks.
for new places to live. The decline in search volume on CoStar apartment OnOn
the the ipthere
ip side, side,arethere are
markets markets
that are seeingthat are seeing
a positive a positive
shift in user perception.shift
Tech in user perception. Tech
One of those key changes is the increase in searches for new apartments outside people's
listing
current platforms
market coincided
of residence. The rise inwith a downturn
this metric in could
in early April rents, which
well re�ect had
users’peaked
nationally on March hubs suchsuch
hubs as Austin, Texas; Raleigh,
as Austin, Texas; North Carolina;North
Raleigh, Boston,Carolina;
the Bay AreaBoston,
and Seattle,
thetheBay Area and Seattle, the
https://product.costar.com/home/news/shared/1708394502?utm_source=newsletter&utm_medium=email&utm_campaign=personalized&utm_content… 3/5
One of
11. That those key changes
searchconditions.
volume As is
fell the
jobuntil increase
losseslate in
March, searches
when for new
it started apartments
many areto outside people's
turntothe corner.
shipping hub of Memphis, Tennessee, and big growth markets such as Atlanta and Phoenix all
changed employment mount around the country, forced shipping hub of Memphis, Tennessee, and big growth markets such as Atlanta and Phoenix all
meet that criteria. Searches for units in those areas from people who live elsewhere have
current
look market of residence.
for new employment. The rise
Tourism and energy in this metric
are particularly exposedin early
today. OurApril could well re�ect users’
colleagues
meet that
increased, whilecriteria.
users insideSearches
the marketfor units
are not in those
searching areas
in other from
markets people
as much. who
It would live elsewhere have
at STR report that 100% of markets are reporting hospitality RevPAR losses week over week
changed employment conditions. As job losses mount around the country, many are forced to seem that potential renters are favoring
now, and have for the past four weeks. Energy markets are in turmoil, as West Texas increased, while users insidethese
the markets
marketforare
the not
relative job security
searching inthey offer.markets
other as much. It would
look for new
Intermediate employment.
oil took Tourism
an unprecedented and energy
dive into negative pricing,are particularly
meaning exposed today. Our colleagues
storage operators seem that potential renters are favoring these markets for the relative job security they offer.
Some markets are not behaving as expected. Orlando, Florida, stands out as a market where
https://product.costar.com/home/news/shared/1708394502?utm_source=newsletter&utm_medium=email&utm_campaign=personalized&utm_content… 1/5
at actually
were STR report
paid to that 100% There
take delivery. of markets
are otherare reporting
employment riskshospitality RevPAR
as well, but many are losses week over week 5/5/2020 CoStar News - Recent Apartment Searches Offer Early Hints About Future Demand
jobs are drying up quickly, yet the area still sees demand. Search results may yet catch up to
more evenly spread between markets than energy and tourism.
now, and have for the past four weeks. Energy markets are in turmoil, as West Texas Andrew
what
Some Rybczynski
is expected.
marketsDisney’s is abehaving
managing
are decision
not to suspend consultant
aspay with CoStar
for 100,000Orlando,
expected. workers as its Advisory
amusement
Florida, Services
stands out as in Boston.where
a market This
Intermediate oil took an unprecedented dive into negative pricing, meaning storage operators parks are closed does not bode well for the market, nor does its declining hotel occupancies or
article
jobs areincludes contributions
drying up quickly, yet by
theJordan Silton,
area still seessenior director
demand. forresults
Search searchmay
engine
yet optimization
catch up to
https://product.costar.com/home/news/shared/1708394502?utm_source=newsletter&utm_medium=email&utm_campaign=personalized&utm_content… 2/5 drop in airline travel.
were actually paid to take delivery. There are other employment risks as well, but many are and
whatanalytics, andDisney’s
is expected. Yafet Tamene,
decisionmanager for data
to suspend pay science.
for 100,000 workers as its amusement
more evenly spread between markets than energy and tourism. In many respects, recent search results re ect long-held expectations about how migration
parks are closed does not bode well for the market, nor does its declining hotel occupancies or
cycles tend to reset in downturns. There is still a lot of research to be done on this particular
drop
900 OLD KOENIG / 5916 N LAMAR | REVISED in airline travel.
2020.06.17
economic slowdown, which came about in an unusual way.
21
NEWSWORTHY NORTH AUSTIN INVESTMENTS
10 MILES FROM PROJECT SITE
6 MILES FROM PROJECT SITE
Aug 19, 2019, 2:44pm CDT Updated: Aug 20, 2019, 12:05pm CDT Social media giant would be neighbors with HomeAway in Domain Northside
It is directly east of Domain 11, the 16-story building entirely leased by HomeAway Inc. that
HomeAway
SUBSCRIBERdid it. Indeed, too. Now Facebook is
CONTENT:
topped out in April and is nearing completion.
See Correction/Clarification at end of article choosing
Sep to split
6, 2018, 7:35am CDTin a major way its workforce between
downtown
If Facebookand what'sFB)
(Nasdaq: becoming known
is indeed as Austin's
the tenant, it would mark a major expansion for the
Austin FC has cleared another major hurdle on its road to playing in 2021.
second downtown.
HomeAway
California-based did it.company
Indeed, too. Now Facebook
in Austin. It employsisabout 700 people at the 300 West Sixth
A site plan for the Major League Soccer stadium in North Austin has been choosing
tower to split in aAustin
in downtown majorand
wayhas
its leased
workforce between
about 250,000 square feet in the Third + Shoal
approved by the city, Development Services Department spokeswoman The developer of North Austin's next tallest tower
downtown and
skyscraper what's
under becoming
construction byknown as Austin's
TIER REIT. In The Domain, Facebook already leases three
Sylvia Arzola said Aug. 19. announced this week that a Fortune 100 company has
second
floors ofdowntown.
the Domain 8 mid-rise, in the same building as Amazon.com Inc.
chosen to take all of the Domain 12 tower being built
Arzola said the flatwork site plan, which has to do with site preparation in is
The Domain Northside.
developer of NorthFacebook
Austin's next tallest
keeptower
GENSLER
GENSLER It not clear whether would its existing leases at Domain 8 and at the West
like grading and erosion control, was approved Aug. 12. That work can A rendering of the Domain 12, left, and Domain 11
announced
Sixth tower this
evenweek
afterthat
the a Fortune
new office100 company
towers Third +has
Shoaloffice
and Domain
looking 12 are
the complete.
Austin FC's stadium is expected to open in the
towers from east.
now begin, Arzola said. spring of 2021. Several sources told Austin Business Journal the
chosen to take all of the Domain 12 tower being built
tenant
In was to
addition Facebook
movement Inc.onThethesocial media
Domain giant TIER (NYSE:
12 front, TIER) said this week it would
Some regulatory hurdles remain. Arzola said vertical construction on the in Domain Northside. GENSLER
neither
start confirmed in
construction nor denied on
October its the
involvement: "We don’t have
300,000-square-foot anything
Domain
A rendering of 10, tonew
the Domain 12,to
the share
north
left, and of about
Domain 11
actual stadium cannot begin until a different phase of the site plan and building plans are also approved,
office towers looking from the east.
our facilities
Several
Domain sources
11 andin 12.
Austin at thisBusiness
told Austin time," Kyle Gerstenschlager,
Journal the a member of Facebook's
adding that timeline can vary on a case-by-case basis.
corporate
tenant wascommunications
Facebook Inc. The team,
socialwrote Wednesday
media giant in an email.
Still, the Aug. 12 approval is another major step for Austin FC to launch as Major League Soccer's 27th franchise Domain 12 and Domain
neither confirmed 10 are being
nor denied developed"We
its involvement: by TIER
don’tand
have Austin's
anything Endeavor
new toReal share Estate
about
in the spring of 2021. The team's stadium deal was allowed to proceed by Austin City Council a year ago last The Austin
Group. American-Statesman,
Go here for more on the quoting anonymous
expansive growth plans real
forestate sources,including
The Domain, also reports that
our facilities in Austin at this time," Kyle Gerstenschlager, a member of Facebook's more
August, its lease with the city executed last December and its request to rezone the stadium site approved this tenant
than is Facebook
600,000 squareInc.
feet ofteam,
offices on the site of a current surface parking lot.
corporate communications wrote Wednesday in an email.
June.
This
In comesto
addition asAmazon
Facebook eats
and up even more
HomeAway, spaceisdowntown
Facebook surrounded in a new towerofcalled
otherThird +
The Austin American-Statesman, quoting anonymous real estateby a bounty
sources, tech
also reports that
Austin FC officials have previously said they want to break ground on their $242 million soccer stadium Shoal.
companies
tenant at The Domain
is Facebook Inc. ranging from software maker Accruent LLC to prosthetics-limbs
development, located on 24 acres at McKalla Place near The Domain, this September.
manufacturer Ottobock to Indeed Inc. — the job-placement website that has leased all
TIER REIT Inc. is the co-developer of Domain 12 — one of a series of office high-rises it is
This comes
310,000 as Facebook
square eats upTower
feet of Domain even on
morethespace
southdowntown
side of thein a new tower called
development. Third
The area is +
More details on the stadium's development are expected later this week. Austin FC and its new parent building in North Austin. It has worked with The Domain's original developer, Endeavor Real
company, Two Oak Ventures, will hold an Aug. 21 State of the Stadium event for media and invited guests to Shoal.
quickly becoming Austin's second urban core, with lots of shops, restaurants and bars as
Estate Group, to flesh out a large portion of what's known as Domain Northside.
provide general project, design and construction timeline updates, including "milestone dates" for the project. well as multiple office tower and hundreds of apartments, plus a Major League Soccer
TIER REIT Inc. is the co-developer of Domain 12 — one of a series of office high-rises it is
stadium proposed just to the south.
Austin FC and Two Oak Ventures leadership will speak at the event, as well as development team members building in North Austin. It has worked with The Domain's original developer, Endeavor Real
from construction manager Austin Commercial, architect Gensler and project manager CAA ICON. Estate Group, to flesh out a large portion of what's known as Domain Northside.
Correction/Clarification
This story has been updated due to incomplete information first provided by the city of Austin about the different phases of site plan900
approval.
OLD KOENIG / 5916 N LAMAR | REVISED 2020.06.17 23
Land Value Appreciation of Transit Oriented Development
Estimate Summary
Although it is undetermined when the scope of subsequent phases may
of Costs
It is also noted that the estimated costs identified herein do not include the Total Estimated Costs $39,340,000
cost for design and construction of the central chiller plant, and its equipment. occur, project costs have been developed for the respective components
consistent with the same process described with Phase II estimates, and F. Convocation/Events Center
It has been assumed that ACC will incur the cost for the underground main
projected to 2017 dollars. Site Improvements 2,500,000
distribution line from the plant location to the existing facility.
Executive
Construction (75,100 GSF @ $305/SF) 22,905,000
Finally, it is recognized that the scope of work and associated soft costs Equipment & Furnishings 4,000,000
of Phase II has a budget limitation of $152,800,000. The scope of work Soft/Development Costs 3,600,000
Contingency 3,000,000
Total Estimated Costs $36,005,000
Note: Depending on actual construction costs of Phase II, and allocation of site allowance
budget, these projects may require additional funding to address site infrastructure costs. 55
900 OLD KOENIG / 5916 N LAMAR | REVISED 2020.06.17 26
THE GROVE DEVELOPMENT OVERVIEW
2.3 MILES FROM PROJECT SITE
140,000 SF Retail
180,939 SF Office
500+ Townhomes/Condos
Preservation of trees & open space Electric vehicle charging stations Water conserving landscape & fixtures
Bike connectivity & parking Passive solar shading design Sustainable sourced materials
WEBSITE: www.bcarc.com
INSTAGRAM: @bercy_chen_studio
BEHANCE: www.behance.net/bcstudio