Вы находитесь на странице: 1из 233

`

Rig Pasargad-100 Inventory List

Introduction:
This File consists of 6 sheets as follow:
Ring Gasket: All Ring Gaskets Received onboard, Used or backloaded shall be inserted at this sheet.
XMT-WHD: Any Item related to XMT-WHD including Following items shall be inserted at this sheet.
Flange
T-Sub
Valve
Nut
Bolt
Plug
Pressure Gauge

In case there are missing item(s) category, Please use same format to add the item in the
sheet.
Completion: Any Item related to Completion shall be inserted to this sheet.
SWT: Contractor Items used by Surface Well Testing Service shall be inserted to this sheet.
Platform: Any Item which is received from Production Platform, shall be filled here.
Rental: Any Contractor Item shall be filled here.
Update Responsibility:
The file shall be updated by Drilling Engineer, Checked by Night Company man and Approved by Day Companyman.

Update and Checking Interval


File shall be Updated/Checked when
Receiving New Item
Backloading Item
Use of Item in the Well/Wellhead.
The Operation on Well is over and well is handed over to Production dept.
Update date:
August 5, 2019
Updated by:

M.Mousavi

d shall be inserted at this sheet.


ms shall be inserted at this sheet.

ame format to add the item in the

shall be inserted to this sheet.


hall be filled here.

Approved by Day Companyman.

anded over to Production dept.


Amir.h Moghadampour
Ali Bayat
ghadampour
Update Date: Monday, August 05, 2019

Rig Pasargad-100 Updated by: M.Mousavi

Onboard Manifest In Manifest Out Used


Item Description Material Serial No. Note
QTY QTY No. Date Recv'd Carrier Loading Port QTY No. Date Carrier Discharge Port QTY Well Comment
Ring Gasket RX-24
1 Ring gasket, RX-24 CS 0 CS N/A 10 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 5 2019001 April 3, 2019 Mataf Sky Kish 1 well#04 (21/16"G.V.)
2 Ring gasket,RX-24 SS316 0 SS316 N/A 12 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 3 2019001 April 3, 2019 Mataf Sky Kish 12 well 4, 9,6,2 (21/16"G.V.)
3 Ring gasket RX-24 (SS316) BP2876G37 0 SS316 N/A 10 F0-C1-015 February 27, 2019 March 12, 2019 Mataf sky Kish 6 Delivered to SPD5 5 9,12,12,2,2
Ring Gasket RX-35
1 Ring gasket RX-35 (SS316) BPH390G37 0 SS316 N/A 6 F0-C1-015 February 27, 2019 March 12, 2019 Mataf sky Kish 4-Jan REFRENCE:450/483 May 10, 2019 Fam Star SPD23 1
2 Ring gasket RX-35 0 Inc 825 N/A 1 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 1 483 August 4, 2019 Mataf Sky Kish
3 Ring gasket RX-35 (SS316) 0 SS316 N/A 6 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 6 484 August 5, 2019 Mataf Sky Kish
4 Ring gasket RX-35 (inc/COATED) 0 Inc 825 N/A 1 2019025 June 8, 2019 June 8, 2019 Mataf sky Kish 1 485 August 6, 2019 Mataf Sky Kish
Ring Gasket RX-46
1 Ring gasket,RX-46 SS316 0 SS316 N/A 6 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 6 2019001 April 3, 2019 Mataf Sky Kish
2 Ring gasket,RX-46 INC825 0 Inc 825 N/A 15 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 5 2019001 April 3, 2019 Mataf Sky Kish 15 3,2,6
3 Ring gasket RX-46 (SS316) BP2874G37 0 SS316 N/A 10 F0-C1-015 February 27, 2019 March 12, 2019 Mataf sky Kish 10 F0-C1-015 April 3, 2019 Mataf Sky Kish
Ring Gasket BX-152
1 Ring Gasket BX-152 SS316 0 SS316 N/A 6 2019012 April 27, 2019 April 27, 2019 Chopper kish 3 485 August 6, 2019 Mataf Sky Kish 1 4
Ring Gasket BX-155
1 Ring gasket BX-155 (3 USED+3 NEW) 0 SS316 N/A 6 2019032 July 2, 2019 July 3, 2019 Mataf sky Kish 3‫عدد به دکل بابت بدهی تحویل شد‬
2 Ring gasket BX-155 0 SS316 N/A 3 2019040/F0-C1-015 July 31, 2019 July 31, 2019 Mataf sky Kish 3 485 August 6, 2019 Mataf Sky Kish
Ring Gasket BX-156
1 Ring gasket BX-156 (SS316) BPH392H37 0 SS316 N/A 20 F0-C1-015 February 27, 2019 March 12, 2019 Mataf sky Kish 4 F0-C1-015 April 3, 2019 Mataf Sky Kish 9 1,7,2,(6 No. delivered to SL Sup.)
2 Ring gasket BX-156 0 SS316 N/A 5 ‫قرضی اسلیک الین‬ ### 485 August 6, 2019 Mataf Sky Kish 4 WELL#2 #9
3 Ring gasket BX-156 0 Inc 825 N/A 4 2019040/F0-C1-015 July 31, 2019 July 31, 2019 Mataf sky Kish 4 485 August 6, 2019 Mataf Sky Kish
Ring Gasket BX-159
1 Ring gasket BX-159 0 SS316 N/A 4 2019032 July 2, 2019 July 3, 2019 Mataf sky Kish 2 485 August 6, 2019 Mataf Sky Kish 2 2 ‫دو عدد به دکل بابت بدهی تحویل شد‬
Ring Gasket BX-160
1 Ring gasket BX-160 0 SS316 N/A 5 2019001 February 11, 2019 February 14, 2019 C-Traveller Kish 4 485 August 6, 2019 Mataf Sky Kish 1 2 ‫یک عدد به دکل بابت بدهی تحویل شد‬
2 Ring gasket BX-160 0 Inc 825 N/A 1 2019025 June 8, 2019 June 8, 2019 Mataf sky Kish 1 485 August 6, 2019 Mataf Sky Kish
VG SEAL
1 VG seal modified 137 0 Inc 825 N/A 2 2019025 June 8, 2019 June 8, 2019 Mataf sky Kish 2 WELL#02 (13 5/8" RISER & X-Mass) 2 (used)
3 VG seal modified 137 0 Inc 825 N/A 3 Hand carry June 5, 2019 June 5, 2019 Mataf sky Kish used 3(used)+1 (well)
2 VG seal modified 63 0 Inc 825 N/A 3 Hand carry June 5, 2019 June 5, 2019 Mataf sky Kish 1 485 August 6, 2019 Mataf Sky Kish 1 WELL#02 1 (NEW)+(1 used)+1 (well)
Onboard
Item Description Type
QTY
T-SUB
1 T-sub 7 1/16" x 7 1/16" x 2" Union 1502 0 T-Sub
2 T-sub 7 1/16" x 7 1/16" 5k x 2" Union 1502 /3 1/8" side flange 0 T-Sub
3 T-sub 7 1/16" x 7 1/16" x 3" Union 1502 (5k)/3 1/8" side flange 0 T-Sub

Y PIECE
1 Y-Piece 7 1/16" x 4 1/16" (10k) 0 Y-Piece
2 Y-Piece 7 1/16" x 4 1/16" (10k) 0 Y-Piece

Flange
1 Crossover 2 1/16" Flange x 2" Union 1502 0 Crossover
2 Crossover 3 1/8" Flange x 2" Union 1502 0 Crossover

Double Stud Adeptor (DSA)


1 7 1/16"-5K (RX46)-7 1/16"-10K (BX-156) 0 Crossover
2 7 1/16"-5K (RX46)-7 1/16"-10K (BX-156) 0 Crossover
3 RX-46 x RX47 0 Crossover

Valve
1 2 1/16" 5k Gate Valve Manufacturer: WETCO SN=ASSY143004-15 0 Gate
2 2 1/16" 6.5k DD, Aker kvaeverner, SN: B09G48 0 Gate
3 3 1/8" 6.5 k HH, Aker kvaeverner, SN:G09A128 w/ 8 nut&bolt 0 Gate
4 2 1/16" 5 k DD, Aker kvaeverner, SN: B09J54 0 Gate
5 2 1/16" 5 k DD, WETCO, SN: 0665-94 0 Gate
6 7 1/16'' 5 k Gate Valve Manufacturer: WETCO w/handwheel 0 Gate
7 2 1/16" 5k DD, Aker Solution, SN: B10J06 0 Gate
8 2 1/16" 5k DD, Aker Solution, SN: B09J44 0 Gate
9 2 1/16" G.V 5 k psi, M/C: DD, T/C: P-U, PSL2 0 Gate
10 2 1/16" G.V 5 k psi, M/C: EE, T/C: P-U, PSL2 0 Gate

Bolt & STUD


1 Stud 1 1/2" x 13 1/2" long 0 STUD
2 Stud 1 3/8" x 12.25" long 0 STUD
3 Stud for 2 1/16" 5k - Size 7/8" x 7" 0 STUD
4 Stud for 2 1/16" 5k - Size 7/8" 0 STUD
5 Stud for 71/16" G.V.5k - Size 1 3/8" (Short) 0 STUD
6 Stud & nut 1 3/8'' - 30cm long 0 STUD & NUT
7 Stud & nut 1 1/2'' - 33cm long 0 STUD & NUT
8 Stud & nut 1 7/8'' - 45cm long for 11" 5k 0
9 Stud & nut 1 3/4'' - 43cm long for 11" 10k 0

Nut
1 Nuts for Stud 1 1/2" x 13 1/2" long 0 Nut
2 Nuts for Stud 1 3/8" x 12.25" long 0 Nut
3 Nut for Stud for 2 1/16" 5k - Size 7/8" x 7" 0 Nut
4 Nut for Stud for 2 1/16" 5k - Size 7/8" 0 Nut
5 Nut for Stud for 71/16" G.V.5k - Size 1 3/8" (Short) 0 Nut
6 Nut for 1 7/8" Stud 0
7 Nut for 1 3/4" Stud 0
Rig Pasarga
Manifest In
Owner
QTY No. Date Recv'd

POGC 1 2019001 February 11, 2019 February 14, 2019


POGC 1 2019004 March 5, 2019 March 6, 2019
POGC 1 200161150 March 11, 2019 March 12, 2019

POGC 1 200161150 March 11, 2019 March 12, 2019


POGC 1 2019006 March 13, 2019 March 13, 2019

POGC 3 2019001 February 11, 2019 February 14, 2019


POGC 2 2019001 February 11, 2019 February 14, 2019

POGC 1 200161150 March 11, 2019 March 12, 2019


POGC 1 2019006 March 13, 2019 March 13, 2019
POGC 1

IOEC 1 CCR-619-97 February 23, 2019 February 23, 2019


POGC 1 2019003 February 24, 2019 February 24, 2019
POGC 1 2019003 February 24, 2019 February 24, 2019
POGC 1 2019003 February 24, 2019 February 24, 2019
POGC 1 2019003 February 24, 2019 February 24, 2019
POGC 2 2019004 March 5, 2019 March 6, 2019
POGC 1 2019016 May 8, 2019 May 8, 2019
POGC 1 2019016 May 8, 2019 May 8, 2019
POGC 3 N/A July 3, 2019 July 3, 2019
POGC 3 N/A July 3, 2019 July 3, 2019

POGC 27
POGC 24
POGC 100 2019006 March 13, 2019 March 13, 2019
POGC 124
POGC 24
POGC 50 DOS-POGC-AE-02 March 13, 2019 March 23, 2019
POGC 30 DOS-POGC-AE-02 March 13, 2019 March 23, 2019
N/A N/A
N/A N/A

POGC 54
POGC 48
POGC 300 2019006 March 13, 2019 March 13, 2019
POGC 108
POGC 24
N/A
N/A
Rig Pasargad-100
Manifest Out
Carrier Loading Port QTY No. Date Carrier

C-Traveller Kish 1
C-Traveller Kish 1 473 7/12/2019 Pishgaman
Mataf sky Kish 1

Mataf sky Kish 1 484 8/10/2019 Anna


Anna Kish 1 484 8/10/2019 Anna

C-Traveller Kish 3 484 8/10/2019 Anna


C-Traveller Kish 1 473 7/12/2019 Pishgaman

Mataf sky Kish 1 484 8/10/2019 Anna


Anna Kish 1 484 8/10/2019 Anna
1 473 7/12/2019 Pishgaman

Anna CCR 1 440 4/6/2019 Matafsky


Charlie-2 Kish 1 453 5/16/2019 Anna
Charlie-2 Kish 1 473 7/12/2019 Pishgaman
Charlie-2 Kish 1 4456 5/4/2019 Matafsky
Charlie-2 Kish 1 434 March 9, 2019 Anna
C-Traveller Kish 2 484 8/10/2019 Anna
Mataf sky Kish 1 484 8/10/2019 Anna
Mataf sky Kish 1 484 8/10/2019 Anna
Mataf sky Kish Delivered to SPD5
Mataf sky Kish Delivered to SPD5

5 484 8/10/2019 Anna

Anna Kish 96 Delivered to SPD-5


123 484 8/10/2019 Anna
24 484 8/10/2019 Anna
Vigor/AMPI Asaluye 30 484 8/10/2019 Anna
Vigor/AMPI Asaluye 30 484 8/10/2019 Anna
30 484 8/10/2019 Anna
12 484 8/10/2019 Anna

70
60
Anna Kish 192 Delivered to SPD-5
197
24
60
24
Update Date:

Updated by:

Used
Discharge Port QTY Well Comment

SPD 16

Kish
Kish

Kish
SPD 16

Kish
Kish
SPD 16

Kish
Kish
SPD 16
Kish
COSL Craft
Kish
Kish
Kish

Kish

SPD-5
Kish
Kish
Kish
Kish
Kish
Kish

SPD-5
Monday, August 05, 2019

M.Mousavi

Note

Back Load to Kish W/Anna


Sent to SPD16
Back Load to Kish W/Anna

Back Load to Kish W/Anna


Back Load to Kish W/Anna

Back Load to Kish W/Anna


Back Load to Kish W/Anna

Back Load to Kish W/Anna


Back Load to Kish W/Anna
Sent to SPD16

Sent to SPD16

Back Load to Kish W/Anna


Back Load to Kish W/Anna
Back Load to Kish W/Anna

Back Load to Kish W/Anna


Back Load to Kish W/Anna
Back Load to Kish W/Anna
Back Load to Kish W/Anna
Back Load to Kish W/Anna
Back Load to Kish W/Anna
Back Load to Kish W/Anna

Back Load to Kish W/Anna


Back Load to Kish W/Anna
Back Load to Kish W/Anna
Back Load to Kish W/Anna
Back Load to Kish W/Anna
pg plg flg

2K Bull Crossover
5K VR Blind
10K NPT Companion

0
Onboard
Item Description
QTY

1 CHOKE MANIFOLD 4 1/16" 1


2 GAS MANIFOLD 6" 1

3 BURNER BOOM 90 FT 2

4 WORK SHOP 1
5 COFLEXIP BASKET 1
6 COFLEXIP HOSE 4" 1
7 ESD 1
8 PSV 2
9 CROSSOVER TEE 6" 1
10 CROSSOVER 7 1/16" X 4 1/16" 1
11 PIPE BASKET INCL. 6" PIPE, ELBOW 1
12 PIPE BASKET INCL. 6" PIPE, ELBOW, 4 1/16" SPOOL 1
13 SSV 4 1/16" 1
14 PROPANE RACK INCL. 8 BTLS 1
15 PROPANE RACK INCL. 8 BTLS 1
16 TDA CABINE
17 METAL BOX INCL. HAND TOOLS, CHAIN BLOCK,SHACKLE,CLAMPS
18 METAL BOX INCL. HAND TOOLS, HAND PUMP, FITTING, LINER
19 TOOL BASKET INCL. FISH PLATE, SNATCH PULLY, R/UP AND SIDE SLING
Rig Pasargad-1
Manifest In
S/N Owner
QTY No. Date Recv'd Carrier
Surface Well Testing Equipment
IO116352-1 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
5282-N155 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
3HBB-8
3HBB-1 PDK 2 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER

SWT-003 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
COF-002 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
TR039684CLM801 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
CPP-ESD-1014 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
N/A PDK 2 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
N/A PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
N/A PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
PB-008 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
PB-006 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
IO116472-1 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
PR-007 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
PR-004 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
RP1411C123 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
BOX-002 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
BOX-001 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
TB-003 PDK 1 2019001 February 11, 2019 February 14, 2019 C-TRAVELLER
Update Date:

Pasargad-100 Updated by:

Manifest Out Used


Loading Port QTY No. Date Carrier Discharge Port QTY Well Comment
ng Equipment
KISH
KISH

KISH

KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
KISH
Monday, August 05, 2019

M.Mousavi

Note
com pg plg flg

TRSSSV 2K Bull Crossover


Insert Valve 5K VR Blind
PS 10K NPT Companion
RT
PT
SISOSR
Onboard Well
Item Description Type
QTY No.
Pressure Gauge
1 5k 1/2" NPT - ss316 0

Niddle Valve
XMT Cap
Block & Bleed
Receive Handover to Platform
QTY Date Reciever Comment QTY Date Handed to

10 Hand Carry 10 7-12-1397 ‫ملک محمدی‬


‫‪er to Platform‬‬
‫‪Note‬‬
‫‪Comment‬‬

‫اقالم فوق الذکر توسط واحد حفاری تهیه شد و تحویل پلتفورم گردید‬
pg plg flg wn

2K Bull Crossover 1
5K VR Blind 2
10K NPT Companion 3
4
5
6
7
Onboard
Item Description Type Manufacturer
QTY
Completion Equipment
1 7" liner 0
2 Shooting nipple 0
3 13 5/8" Riser10 k hub X 5 k flnge 0
4 Protection Sleeve 0 PS POGC
5 Collet for PS 0 PS POGC
6 Bottom Bit 4 1/8", 417 G (used)/ 1507407 0 POGC
Rig Pasargad-100
Manifest In Manife
QTY No. Date Recv'd Carrier Loading Port QTY

2 2019027 June 15, 2019 June 16, 2019 Mataf kish 2


3 2019027 June 16, 2019 June 16, 2019 Mataf kish 3
1 2019023 June 1, 2019 June 1, 2019 Mataf sky Kish 1
1 1
1 2019025 June 8, 2019 June 8, 2019 Mataf sky Kish 1
1 2019023 1-Jun-19 1-Jun-19 Mataf sky Kish 1
Update Date:

100 Updated by:

Manifest Out Used


No. Date Carrier Discharge Port QTY Well Comment

487 24-Jul-19 ANNA Kish


487 24-Jul-19 ANNA Kish
487 24-Jul-19 ANNA Kish
484 8/10/2019 Anna Kish
484 8/10/2019 Anna Kish
484 8/10/2019 Anna Kish
Monday, August 05, 2019

M.Mousavi

Note
com pg plg flg

TRSSSV 2K Bull Crossover


Insert Valve 5K VR Blind
PS 10K NPT Companion
RT
PT
SISOSR
Onboard
Item Description
QTY

1 3 1/8" Motor 0
2 4 3/4" JAR 0
3 4 3/4" FLOAT SUB 0
4 3 3/4" MILL, TOP Pin Connection API REG 2 3/8 0
5 4 1/8" MILL, TOP Pin Connection API REG 2 3/8 0
6 7" Bridge plug 0
7 7" wireline adaptor kit 0
8 7" M washover head retrieving head 0
9 7" BWR retrievable bridge plug 0
10 Adjustable sub tension manderiel 0
11 Hydraulic setting tools 0
Rig Pas
Manifest In
S/N Owner
QTY No. Date Recv'd
Rental Tools
805,004,805,005 DDDC 2 2019023 1-Jun-19 1-Jun-19
C1411053-15, C1411053-10 DDDC 2 2019023 1-Jun-19 1-Jun-19
LH163-287, LH163-268 DDDC 2 2019023 1-Jun-19 1-Jun-19
DCI 2 2019023 1-Jun-19 1-Jun-19
DCI 2 2019023 1-Jun-19 1-Jun-19
varavi 1 2019031 June 29, 2019 June 29, 2019
varavi 1 2019032 June 29, 2019 June 29, 2019
varavi 1 2019033 June 29, 2019 June 29, 2019
varavi 1 2019034 June 29, 2019 June 29, 2019
varavi 2 2019035 June 29, 2019 June 29, 2019
varavi 2 2019036 June 29, 2019 June 29, 2019
Rig Pasargad-100
Manifest Out
Carrier Loading Port QTY No. Date Carrier Discharge Port
Rental Tools
Mataf sky Kish 2 464 23/1/2019 Mataf sky Kish
Mataf sky Kish 2 464 23/1/2020 Mataf sky Kish
Mataf sky Kish 2 464 23/1/2021 Mataf sky Kish
Mataf sky Kish 2 487 24-Jul-19 ANNA Kish
Mataf sky Kish 2 487 24-Jul-19 ANNA Kish
Mataf sky Kish 1 2019031 29-Jun-19 Mataf sky kish
Mataf sky Kish 1 2019031 29-Jun-19 Mataf sky kish
Mataf sky Kish 1 2019031 29-Jun-19 Mataf sky kish
Mataf sky Kish 1 2019031 29-Jun-19 Mataf sky kish
Mataf sky Kish 2 2019031 29-Jun-19 Mataf sky kish
Mataf sky Kish 2 2019031 29-Jun-19 Mataf sky kish
Update Date: Monday, August 05, 2019

Updated by: M.Mousavi

Used
Note
QTY Well Comment
com pg plg flg

TRSSSV 2K Bull Crossover


Insert Valve 5K VR Blind
PS 10K NPT Companion
RT
PT
SISOSR

Вам также может понравиться