SUMMARY OF BILLS
AKAKI WWTP
Amount
BILL NO. DESCRIPTION ETB
BILL NO.C01 Preliminaries and General
BILL NO.C02A Inlet Sewer, Bypass & Connection Sewer
BILL NO.C02B Valve Chambers
BILL NO.C03 Inlet Chamber, Screen & Grit Channel & FDT01
BILL NO.C04 Lifting Station I & Flow Distribution Chamber FDT02
BILL NO.C05 Flow Distribution Tank (FDT 03)
BILL NO.C06 BILL No. C06 - Anaerobic Ponds
BILL NO.C07 BILL No. C07 - Facultative Ponds
BILL NO.C08 BILL No. C08 - Maturation Ponds
BILL NO.C09 Drying Beds
BILL NO.C10 Sanitary Land Fill
BILL NO.C11 Mechanical Works
BILL NO.C12 Electrical Works
BILL NO.C13 Compound and Ancillary Works
BILL NO.C14 Flood Protection (Embankment)
BILL NO.C15 Out fall Structures
1 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
L.S.
Specified Requirements
A911 Sign Boards
Provide and erect sign boards at the site indicated by the Engineer
and in accordance with the Conditions of Contract and as shown on
the drawings
nr 2
A211.1 Offices
Allow for provision of temporary offices at Akaki Sewage Treatment
Works for the use of the Engineer's Staff, floor area 50 as per details
in the Specifications. Include for maintenance, water supply,
sewerage, drainage, electrical supply, telephone and other facilities.
This offices will be used by the Engineer's staff until the
administration buildings included in the Contract are completed.
L.S.
A211.2 Allow for moving of equipment and furniture from the temporary to the
permanent offices L.S.
A211.3 Maintenance and attendance of the offices for the Engineer's staff for
the duration of the contract. L.S.
A211.4 Maintenance and attendance of the offices for the Engineer's staff
after issue of the Substantial Completion Certificate wk 12
A219 Furniture and equipment for the Engineer's offices as specified. After
completion of the works all furniture and equipment will be renovated
as necessary and revert to the Employer
L.S.
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
2 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
L.S.
A420.5 Allow for the provision of a camera, films processing, printing and
taking photographs for record purposes as specified or as per
instructions from the Engineer's Representatives.
L.S.
Testing of works
A269.1 Water tightness test for inlet sewer L.S.
A269.2 Water tightness test for screen and grit chambers L.S.
A269.3 Water tightness test for flow distribution tanks L.S.
A269.4 Pressure tests for works pipelines L.S.
A900.2 Training of Staff
Allow for training of Employer's staff during the testing and
commissioning of the plant as specified.
L.S.
A900.3 Allow for provision and maintenance of survey equipment as
specified for the sole use of the Engineer's Representative.
Equipment to revert to the Contractor at the end of the works.
L.S.
A900.4 Other Works, Obligations
The Contractor shall describe in detail hereunder other works,
obligations and things which may be referred to in the Specifications
or which he may consider have been omitted from the Bills of
Quantities and for which he desires to enter a separate charge (the
charge to be carried direct to the amount column). If no separate
charge is made hereunder, the rates in the BOQ shall be held as
covering all expenses for such works, obligations and things.
L.S.
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BILL TOTAL CARRIED SUMMARY
3 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
CLASS E: EARTHWORKS
4 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
5 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
6 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
CLASS E: EARTHWORKS
Excavation for foundations
Commencing surface for excavation shall be the ground level after site
clearing and approximate shaping. It shall include for strutting,
shuttering, stabilizing excavated surfaces and keeping excavations free
of water by bailing out, pumping or other means.
Site Clearing and removal of top soil maximum depth not exceeding
E311 0.25 m m2 121.7
E323 Excavation in Ordinary Soil depth 0.25 - 1.0 m m3
91
E324 -Ditto but depth 1.0 - 2.0 m m3 202
E325 -Ditto but depth 2.0 - 5.0 m m 3
-
E334 Rock, max. depth 1 - 2 m (provisional sum) m3
E532
Disposal of excavated material, maximum hauling distance < 1.0 km
Approved material shall be retained for filling/backfilling, trimming.
Unsuitable and suitable surplus material shall be disposed on site in
separate stockpiles, as directed by the Engineer m3 354.4
E634 Back filling, general, selected excavated material other than topsoil or
rock, price Include for compaction as specified m3 73.0
E635 Filling General, imported selected material other than topsoil, price
Include for compaction as specified m3 36.5
E637 Supply and placing hard rock on top of selected material m2 75.2
Placing of Concrete
Item includes placing, vibrating and curing of the concrete as specified
Mass concrete Grade C15
F511 Blinding under base slab, thickness 75 mm m3 5.6
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 7 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 8 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
CLASS E: EARTHWORKS
Excavation for foundations
Commencing surface for excavation shall be the ground level after site
clearing and approximate shaping. It shall include for strutting,
shuttering, stabilizing excavated surfaces and keeping excavations free
of water by bailing out, pumping or other means.
E311 Site Clearing and removal of top soil maximum depth not exceeding
0.25 m m2 223.4
E323 Excavation in Ordinary Soil depth 0.25 - 1.0 m m3 164
E324 -Ditto but depth 1.0 - 2.0 m m3
269
E325 -Ditto but depth 2.0 - 5.0 m m3 109
E334 Rock, max. depth 1 - 2 m (provisional sum) m3
E532
Disposal of excavated material, maximum hauling distance < 1.0 km
Approved material shall be retained for filling/backfilling, trimming.
Unsuitable and suitable surplus material shall be disposed on site in
separate stockpiles, as directed by the Engineer m3 682.1
E634 Back filling, general, selected excavated material other than topsoil or
rock, price Include for compaction as specified m3 131.4
E635 Filling General, imported selected material other than topsoil, price
Include for compaction as specified m3 65.7
E637 Supply and placing hard rock on top of selected material m2 108.5
Placing of Concrete
Item includes placing, vibrating and curing of the concrete as specified
Mass concrete Grade C15
F511 Blinding under base slab, thickness 75 mm m3 7.8
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
9 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
10 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
CLASS E: EARTHWORKS
Excavation for foundations
Commencing surface for excavation shall be the ground level after site
clearing and approximate shaping. It shall include for strutting, shuttering,
stabilizing excavated surfaces and keeping excavations free of water by
bailing out, pumping or other means.
E311 Site Clearing and removal of top soil maximum depth not exceeding 0.25 m m2 286.8
E323 Excavation in Ordinary Soil depth 0.25 - 1.0 m m 3
106
E324 -Ditto but depth 1.0 - 2.0 m m 3
177
E325 -Ditto but depth 2.0 - 5.0 m m3 151
E334 Rock, max. depth 1 - 2 m (provisional sum) m3
E532
Disposal of excavated material, maximum hauling distance < 1.0 km
Approved material shall be retained for filling/backfilling, trimming.
Unsuitable and suitable surplus material shall be disposed on site in
separate stockpiles, as directed by the Engineer m3 582.7
E634 Back filling, general, selected excavated material other than topsoil or rock,
price Include for compaction as specified m3 148.7
E635 Filling General, imported selected material other than topsoil, price Include
for compaction as specified m3 49.6
E637 Supply and placing hard rock on top of selected material m 2
117.8
11 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
12 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Bonded cement and sand (1:4) screed bed in one coat, well bonded to
concrete base as described:-
G816.1 Walls m2 234.0
Inserts,
including provision and installation
G832 Inserts, step irons nr 3.0
13 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Roof Timbers, Double Pitch Roof Truss in Sawn Cypress Seasoned and
Pressure Impregnated with Wood Preservative and timber joints with bolted
and nailed connections to the Engineer's approval :-
Z114.1
Equal truss 6300 mm clear span and 1270mm high with 600mm eaves
projection, in 150 x 50mm rafters and 100 x 50mm struts and ties nr 9.0
Z114.2 150 x 50mm Intermediate rafters m 580.0
Z114.3 150 x 50mm Hip rafters m 38.0
Z114.4 150 x 50mm Valley rafters m 24.0
Z114.5 150 x 50mm Purlins m 200.0
Z114.6 180
100 xx 50mm
50mm Wall
Ridgeplate
board
tied to wall with 20 s.w.g. hoop iron at 900mm m 44.0
Z114.7 centers m 116.0
Z114.8 Scarfed joint to 150 x 50mm timber member Nr 136.0
Z114.9 225 x 40mm Fascia board m 44.0
Windows, Doors & Glazing
Supply and Fix the following Standard Section Horizontal Bar Type Steel
Casement Windows & Doors, complete with opening accessories including
bedding and pointing around frames in cement mortar:-
Z321.1
Window size 1797 x 1197mm high with 1 No. fixed and 2 No. side-hung
opening lights, and with 1 No. top-hung ventilator with permanent ventilator
hood over nr 6.0
Z321.2 Window size 1797 x 597mm high with 2 No. fixed lights, and with 1 No. top-
hung ventilator with permanent ventilator hood over nr 4.0
Z323 Door size 1200 x 2100 mm high in one panel nr 2.0
Z351 4mm Thick Clear Sheet Glass And Glazing to Steel Casements with putty
in panes:- m2 19.0
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BILL TOTAL CARRIED SUMMARY
14 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
CLASS E: EARTHWORKS
Excavation for foundations
Commencing surface for excavation shall be the ground level after site
clearing and approximate shaping. It shall include for strutting, shuttering,
stabilizing excavated surfaces and keeping excavations free of water by
bailing out, pumping or other means.
E311 Site Clearing and removal of top soil maximum depth not exceeding 0.25 m m2 143.8
E323 Excavation in Ordinary Soil depth 0.25 - 1.0 m m3
30
E324 -Ditto but depth 1.0 - 2.0 m m3
47
E325 -Ditto but depth 2.0 - 5.0 m m3 33
E334 Rock, max. depth 1 - 2 m (provisional sum) m3
E532
Disposal of excavated material, maximum hauling distance < 1.0 km
Approved material shall be retained for filling/backfilling, trimming.
Unsuitable and suitable surplus material shall be disposed on site in
separate stockpiles, as directed by the Engineer m3 149.3
E634 Back filling, general, selected excavated material other than topsoil or rock,
price Include for compaction as specified m3 36.1
E635 Filling General, imported selected material other than topsoil, price Include
for compaction as specified m3 12.0
E637 Supply and placing hard rock on top of selected material m2
21.3
15 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
16 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Bonded cement and sand (1:4) screed bed in one coat, well bonded to
concrete base as described:-
G816.1 Walls m2 53.5
Inserts,
including provision and installation
G832 Inserts, step irons nr 6.0
17 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Roof Timbers, Double Pitch Roof Truss in Sawn Cypress Seasoned and
Pressure Impregnated with Wood Preservative and timber joints with bolted
and nailed connections to the Engineer's approval :-
Z114.1
Equal truss 6300 mm clear span and 1270mm high with 600mm eaves
projection, in 150 x 50mm rafters and 100 x 50mm struts and ties nr 6.0
Z114.2 150 x 50mm Intermediate rafters m 400.0
Z114.3 150 x 50mm Hip rafters m 26.0
Z114.4 150 x 50mm Valley rafters m 16.0
Z114.5 150 x 50mm Purlins m 140.0
Z114.6 180 x 50mm Ridge board m 30.0
100 x 50mm Wall plate tied to wall with 20 s.w.g. hoop iron at 900mm
Z114.7 centers m 80.0
Z114.8 Scarfed joint to 150 x 50mm timber member Nr 94.0
Z114.9 225 x 40mm Fascia board m 30.0
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
18 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Roof Timbers, Double Pitch Roof Truss in Sawn Cypress Seasoned and
Pressure Impregnated with Wood Preservative and timber joints with bolted
and nailed connections to the Engineer's approval :-
Z114.1
Equal truss 6300 mm clear span and 1270mm high with 600mm eaves
projection, in 150 x 50mm rafters and 100 x 50mm struts and ties nr 7.0
Z114.2 150 x 50mm Intermediate rafters m 400.0
Z114.3 150 x 50mm Hip rafters m 28.0
Z114.4 150 x 50mm Valley rafters m 18.0
Z114.5 150 x 50mm Purlins m 150.0
Z114.6 180 x 50mm Ridge board m 30.0
100 x 50mm Wall plate tied to wall with 20 s.w.g. hoop iron at 900mm
Z114.7 centers m 80.0
Z114.8 Scarfed joint to 150 x 50mm timber member Nr 94.0
Z114.9 225 x 40mm Fascia board m 30.0
Windows, doors & Glazing
Supply and Fix the following Standard Section Horizontal Bar Type Steel
Casement Windows & Doors, complete with opening accessories including
bedding and pointing around frames in cement mortar:-
Z321.1
Window size 1797 x 1197mm high with 1 No. fixed and 2 No. side-hung
opening lights, and with 1 No. top-hung ventilator with permanent ventilator
hood over nr 2.0
Z321.2 Window size 1797 x 597mm high with 2 No. fixed lights, and with 1 No. top-
hung ventilator with permanent ventilator hood over nr 8.0
Z323 Door size 1000 x 2100 mm high in one panel nr 1.0
Z351 4mm Thick Clear Sheet Glass And Glazing to Steel Casements with putty
in panes:- m2 14.0
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BILL TOTAL CARRIED TO SUMMARY
19 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
CLASS E: EARTHWORKS
Excavation for foundations
Commencing surface for excavation shall be the ground level after site
clearing and approximate shaping. It shall include for strutting, shuttering,
stabilizing excavated surfaces and keeping excavations free of water by
bailing out, pumping or other means.
E311 Site Clearing and removal of top soil maximum depth not exceeding 0.25 m m2 51.9
E323 Excavation in Ordinary Soil depth 0.25 - 1.0 m m 3
11
E324 -Ditto but depth 1.0 - 2.0 m m 3
18
E325 -Ditto but depth 2.0 - 5.0 m m3 13
E334 Rock, max. depth 1 - 2 m (provisional sum) m3
E532
Disposal of excavated material, maximum hauling distance < 1.0 km
Approved material shall be retained for filling/backfilling, trimming.
Unsuitable and suitable surplus material shall be disposed on site in
separate stockpiles, as directed by the Engineer m3 56.7
E634 Back filling, general, selected excavated material other than topsoil or rock,
price Include for compaction as specified m3 13.0
E635 Filling General, imported selected material other than topsoil, price Include
for compaction as specified m3 4.3
E637 Supply and placing hard rock on top of selected material m 2
6.7
20 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
21 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
22 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and lay 1.5mm thick, double side-textured and UV-resistant HDPE
geomembrane waterproofing as per the specifications. Seams and contacts
1.90 m2 24,500
with concrete surfaces shall be fixed to be water tight, durable and strong
for slippage. Area is measured net excluding overlaps.
BOQ Page 23 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 24 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and lay 1.5mm thick, double side-textured and UV-resistant HDPE
geomembrane waterproofing as per the specifications. Seams and contacts
1.9 m2 94,600
with concrete surfaces shall be fixed to be water tight, durable and strong
for slippage. Area is measured net excluding overlaps.
BOQ Page 25 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and lay 1.5mm thick, double side-textured and UV-resistant HDPE
geomembrane waterproofing as per the specifications. Seams and contacts
with concrete surfaces shall be fixed to be water tight, durable and strong
for slippage. Area is measured net excluding overlaps.
2.1 m2 8627.00
Supply and compact about 100mm thick non-expansive clay over the the
2.2 geomembrane m3 740.00
Provide and place 200mm thick basaltic or granitic crushed or natural sand
2.3 filter (0.8-1.5mm diam) over the gravel layer. m³ 1480.00
Provide and place 300 to 500mm thick gravel filter (top 150mm: 3-6mm
diam & the remaining 150mm thick 6-15mm diam) below the sand bed and
2.4 around the perforated pipe m³ 3104.30
Supply and lay PN 6, 150mm ND uPVC perforated pipes in the gravel beds. m
2.5 Price includes fittings, glues and necessary accessories. 747.40
Supply and lay PN 6, 150mm ND uPVC pipes outside of the gravel beds.
Price includes fittings, glues, earthworks, bedding and necessary m
2.6 accessories. 70.30
Supply and lay PN 6, 200mm ND uPVC collector pipes. Price includes m
2.7 fittings, glues, earthworks, bedding and necessary accessories. 330.00
Supply and lay PN 6, 150mm ND DCI sludge feeder pipes. Price includes
fittings, gaskets, glues, earthworks, bedding and necessary accessories for
2.8 installation. m 325.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 26 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and fix PN 6, 100mm ND DCI gate valves for the spout as shown in
the drawing. Price includes fittings, gaskets, glues and necessary
2.1 accessories to fit to the 100mm DN DCI spout pipes. N0 740.00
Supply and fix PN 6, 150mm ND DCI gate valves for sludge feeder pipes as
shown in the drawing. Price includes fittings, gaskets, glues and necessary
2.11 accessories to fit to the 150mm DN DCI sludge feeder pipes. No 124.00
3 Concrete Walls and Distribution Channels
Earthworks
3.1 Common bulk excavation in ordinary soil for strip footing, for all depths m³ 7728.00
3.2 Bulk excavation in soft rock, for all depths m³ 250.00
3.3 Bulk excavation in hard rock for strip footing, for all depths m³ 70.00
3.1 Ditto, but in flow distribution channels including bottom channel chamfering m3 115.51
Ditto, but precast flow distribution channels cover in a meter length & 0.65m
3.11 wide as shown in the drawing (including reinforcement and formwork) No 4662.00
Sawn zigba form work
3.12 To sides of footings m2 1210.00
3.13 To sides of foundation walls and flow distribution channels m2 6670.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 27 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Mild steel rod reinforcement, cutting, bending, tying & placing in position
3.14 Diam. 8mm deformed kg 9790.00
3.15 Diam. 10mm deformed kg 80160.00
4 Masonry Manholes & Valve Chambers
Supply and construct 60cm x60cm entrance opening & 50cm thick masonry
manholes for the sand drying bed supernatant. Depth variable (2-3.5m).
Cost includes earthworks, RC 5cm thick concrete cover, ladder, bed
4.1 channeling and cover lock arrangement. No 22.00
BOQ Page 28 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and lay 1.5mm thick, double side-textured and UV-resistant HDPE
geomembrane waterproofing as per the specifications. Seams and contacts
1.8 m2 4,400 110
with concrete surfaces shall be fixed to be water tight, durable and strong
for slippage. Area is measured net excluding overlaps.
a) DN150mm m 60 410
b) Ditto but none perforated and without filter materials (outfall pipes) m 60 370
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BILL TOTAL CARRIED TO SUMMARY
BOQ Page 29 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 30 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M1000 - General Items, Erection, Testing & Commissioning
08/02/2020 BOQ 31 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M1000 - General Items, Erection, Testing & Commissioning
08/02/2020 BOQ 32 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M1000 - General Items, Erection, Testing & Commissioning
The Tenderer is to describe hereunder, inserting any relevant clause number, any other works
obligations or things that may be referred to in the Conditions of Contract, Specifications,
Drawings or Data Schedule for which no separate item has been included in the schedule of
prices and for which he desires to enter a separate charge ( this charge is to be entered
in the Amount Column) If no charge is entered hereunder, rates and amounts elsewhere in the
Schedule of prices shall be deemed to cover all expenses for such works, obligations or things.
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 33 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M2000 - Inlet Bypass & Screen & Grit Chamber
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT
% of Foreign
No. ETB ETB Foreign Currency Currency
Supply complete set of the following items of plant and equipment, CIF port of Destination,
Djibouti port as specified and shown on the drawings:- (Erection and commissioning is included in
Section M1000)
M2100 Inlet Bypass
M2101 channel gate, 1300mm x 1000mm No. 2
M2102 penstock gate, 600mm x 600mm No. 2
M2103 Stainless steel adjustable flat rectangular Weir 1300 x150 x 4 mm No. 1
M2104 ultrasonic flow measurement transducer for local and remote reading, consisting of sensor, signal
convertor, local indicator digital/analog type No. 1
M2105 SF Steel pipe with puddle DN600, PN10, L =500mm No. 2
M2106 DF reducer DN600/1000, PN10 No. 2
M2107 Flanged Socket Adapter, DCI, DN1000 No. 2
M2200 Screen Chamber
M2201 channel gate, 1300mm x 800mm No. 2
M2202 Coarse screen, 1.8 x 1.3 m with 50mm openings No. 2
M2203 Drain plate 1.7x 0.8 m No. 2
M2204 Stop log with steel frame & nine 1.3 x 0.15 m panels No. 2
M2300 Grit Chamber
M2301 channel gate, 1200mm x 800mm No. 3
M2302 channel gate, 1200mm x600mm No. 3
M2303 bottom drain, conical seat plug valve, DN200 with spindle, pedestal wheel & extension rod No. 6
M2304 SF pipe with puddle DN200, PN10, L =1000mm No. 6
M2305 Plain end bend DN 200 PN 10 No. 2
M2306 Plain end tee DN 200 PN 10 No. 4
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 34 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M2000 - Inlet Bypass & Screen & Grit Chamber
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT
% of Foreign
No. ETB ETB Foreign Currency Currency
M2307 Plain end steel pipe l=6m DN 200 PN 10 No. 6
M2308 4 wheeled, towed (manual and vehicular) trailer to transport screenings to disposal site, with a
suitable mechanism to attach, secure and detach a 1m3 screenings container, including all
necessary accessories
No. 2
M2309 1m3 capacity screenings container, with detachable lid, including all necessary accessories
No. 4
M2400 Parshall Flume
M2401 Ultrasonic Flow Meter for local reading at the parshall flume and remote indication, consisting of
sensor, signal converter, local indicator digital/analog type No. 1
M2500 Other
M2501 mobile Sludge type Dewatering pump, q= 7M3/hr h=10m, electric cable L=20meters, with
discharge hose L=30 meters No. 2
M2502 steel railings, steel ladders at bypass chamber, screens & grit chamber Sum 1
M2503 Pipe support with pipe clamp, foot plate, anchor bolts etc. Sum 1
M2504 Necessary pipes, fittings bolts, nuts, gaskets etc. required to complete installation Sum 1
M2505 The Tenderer is to describe hereunder, inserting any relevant clause number, any other works
obligations or things that may be referred to in the Conditions of Contract, Specifications,
Drawings or Data Schedule for which no separate item has been included in the schedule of
prices and for which he desires to enter a separate charge ( this charge is to be entered in
the Amount Column) If no charge is entered hereunder, rates and amounts elsewhere in the
Schedule of prices shall be deemed to cover all expenses for such works, obligations or things.
08/02/2020 BOQ 35 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M3000 - Flow Distribution tank 01 at Grit Channel
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT Foreign % of Foreign
No. ETB ETB Currency Currency
Supply complete set of the following items of plant and equipment, CIF port of Destination,
Djibouti port as specified and shown on the drawings
M3100 Weirs
M3101 Stainless steel adjustable flat rectangular Weir 700 x150 x 4 mm No. 3
M3102 Chaquer plate 1.5 x 0.7 m No. 3
M3200 Effluent
M3201 DF Steel pipe with puddle DN400, PN10, L =500mm No. 5
M3202 Flanged bell mouth DN400, PN10 No. 4
M3203 Blank flange DN400, PN10 No. 1
M3204 DF steel bend DN 400 PN 10 No. 8
M3205 DF Steel pipe DN400, PN10, L =1000mm No. 8
M3206 DF Steel pipe DN400, PN10, L =2000mm No. 4
M3207 gate valve, DN 400 PN 10, with wheel & extension rod No. 3
M3208 butterfly valve, DN 500 PN 10, with wheel & extension rod No. 1
M3209 DF dismantling piece, DN400 PN10 No. 3
M3210 DF reducer, DN400/500 PN10 No. 1
M3211 DF reducer, DN500/1000 PN10 No. 1
M3212 DF reducer, DN400/800 PN10 No. 3
M3213 Flanged Socket Adapter, DCI, DN800 No. 3
M3214 Flanged Socket Adapter, DCI, DN1000 No. 1
M3300 Drain
M3301 DF Steel pipe with puddle DN400, PN10, L =500mm No. 1
M3302 Flanged bell mouth DN400, PN10 No. 1
M3303 DF steel bend DN 400 PN 10 No. 2
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 36 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki I Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M3000 - Flow Distribution tank 01 at Grit Channel
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT Foreign % of Foreign
No. ETB ETB Currency Currency
M3304 DF Steel pipe DN400, PN10, L =1000mm No. 2
M3305 DF Steel pipe DN400, PN10, L =2000mm No. 1
M3306 gate valve, DN 400 PN 10, with wheel & extension rod No. 1
M3307 DF dismantling piece, DN400 PN10 No. 1
M3308 Flanged Socket Adapter, DCI, DN400 No. 1
M3400 Other
M3401 ultrasonic flow measurement transducer for local and remote reading, consisting of sensor, No.
signal converter, local indicator digital/analog type, at flow distribution tank 3
M3402 steel railings, at flow distribution tank Sum 1
M3403 Internal stainless steel ladder with cage L=1.4m, for flow distribution tank Sum 1
M3404 External galvanized steel ladder with cage L=4.5m, for flow distribution tank Sum 1
M3405 Pipe support with pipe clamp, foot plate, anchor bolts etc. Sum 1
M3406 Necessary pipes, fittings bolts, nuts, gaskets etc. required to complete installation Sum 1
M3407 The Tenderer is to describe hereunder, inserting any relevant clause number, any other works
obligations or things that may be referred to in the Conditions of Contract, Specifications,
Drawings or Data Schedule for which no separate item has been included in the schedule of
prices and for which he desires to enter a separate charge. ( this charge is to be entered in the
Amount Column) If no charge is entered hereunder, rates and amounts elsewhere in the
Schedule of prices shall be deemed to cover all expenses for such works, obligations or things.
08/02/2020 BOQ 37 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 38 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 39 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 40 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
No. 1
M5103 Industrial flat type, discharge hose (fire hose) DN150, flanged on both ends, L= 50 meters No. 2
M5200 Discharge side piping
M5201 DF steel bend DN 150 PN 10 No. 24
M5202 DF Steel pipe DN150, PN10, L =1000mm No. 24
M5203 DF Steel pipe DN150, PN10, L =2000mm No. 12
M5204 DF Steel pipe DN150, PN10, L =3000mm No. 12
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 41 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 42 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 43 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M6000 - Flow Distribution Tank 03
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT
Foreign % of Foreign
No. ETB ETB Currency Currency
Supply and Install complete set of the following items of plant and equipment, CIF port of
Destination, Djibouti port as specified and shown on the drawings:-
M6100 Influent
M6101 DF Steel pipe with puddle DN250, PN10, L =500mm No. 1
M6102 Flanged bell mouth DN250, PN10 No. 1
M6103 DF steel bend DN250 PN 10 No. 2
M6104 DF Steel pipe DN250, PN10, L =4000mm No. 1
M6105 DF Steel pipe DN250, PN10, L =2000mm No. 2
M6106 gate valve, DN250 PN 10, with wheel & extension rod No. 1
M6107 DF dismantling piece, DN250 PN10 No. 1
M6108 DF Steel pipe DN250, PN10, L =1000mm No. 1
M6109 Flanged Socket Adapter, DCI, DN250 No. 1
M6200 Weirs
M6201 Stainless steel adjustable flat rectangular Weir 600 x150 x 4 mm No. 2
M6202 Chaquer plate 0.8 x 0.7 m No. 2
M6300 Effluent
M6301 DF Steel pipe with puddle DN250, PN10, L =500mm No. 2
M6302 Flanged bell mouth DN250, PN10 No. 2
M6303 DF steel bend DN 4250 PN 10 No. 2
M6304 DF Steel pipe DN250, PN10, L =4000mm No. 2
M6305 DF Steel pipe DN250, PN10, L =2000mm No. 4
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 44 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M6000 - Flow Distribution Tank 03
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT
Foreign % of Foreign
No. ETB ETB Currency Currency
M6306 gate valve, DN 250 PN 10, with wheel & extension rod No. 2
M6307 DF dismantling piece, DN250 PN10 No. 2
M6308 Flanged Socket Adapter, DCI, DN250 No. 2
M6400 Other
ultrasonic flow measurement transducer for local and remote reading, consisting of sensor,
M6401 signal converter, local indicator digital/analog type at FDT03
No. 2
M6402 steel railings, at FDT03 Sum 1
M6403 Internal stainless steel ladder with cage , for FDT03 Sum 1
M6404 External galvanized steel ladder with cage, for FDT03 Sum 1
Manhole cover with ventilation pipe frame & cover chromium nickel steel opening 80 x80 cm Sum
M6405
with safety lock and key 1
M6406 Ventilation pipe with dome DN 100 steel pipe with puddle No. 3
M6407 Pipe support with pipe clamp, foot plate, anchor bolts etc. Sum 1
M6408 Necessary pipes, fittings bolts, nuts, gaskets etc. required to complete installation Sum 1
The Tenderer is to describe hereunder, inserting any relevant clause number, any other works
obligations or things that may be referred to in the Conditions of Contract, Specifications,
Drawings or Data Schedule for which no separate item has been included in the schedule of
prices and for which he desires to enter a separate charge ( this charge is to be entered
M6409 in the Amount Column) If no charge is entered hereunder, rates and amounts elsewhere in the
Schedule of prices shall be deemed to cover all expenses for such works, obligations or things.
08/02/2020 BOQ 45 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Akaki Sewage Treatment Works
BILL NO. C11 MECHANICAL WORKS
M6000 - Flow Distribution Tank 03
ITEM DESCRIPTION UNIT QNTY RATE AMOUNT
Foreign % of Foreign
No. ETB ETB Currency Currency
BILL TOTAL CARRIED SUMMARY
08/02/2020 BOQ 46 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Main switchgear (SG1) within main standby diesel house including all protection, relays,
metering, controls, surge diverters, glands, contactors starter panels, etc as specified and shown
E1101 on the Employer's Drawings No. 1
E1102 automatic mains failure changeover switch (AMF) in diesel house No. 1
E1103 All as item SG1 above but synoptic panel/remote indicating panel/ (SP) within the control room No. 1
E1104 All as item SG1 above but motor control center(MC1) within LS01 including starter panels etc No. 1
E1105 All as item SG1 above, but for auxiliary distribution switchgear (AG1) in diesel house No. 1
E1106 All as item SG1 above but auxilary switch gear (AG2) within LS01 No. 1
E1107 All as item SG1 above, but for auxiliary distribution switch gear (AG5) in office & lab No. 1
E1108 All as item SG1 above, but for auxiliary distribution switch gear (AG6) in store & workshop No. 1
E1109 All as item SG1 above, but for auxiliary distribution switch gear (AG7) in operator's dwelling No. 1
E1110 All as item SG1 above, but for auxiliary distribution switch gear (AG8) in guard house No. 1
All as item SG1 above, but for auxiliary distribution switch gear (AG9) for compound lighting in
E1111 ______ No. 1
All as item SG1 above, but for weather proof distribution switch gear(AG10) at the Anaerobic
E1112 Ponds No. 3
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
08/02/2020 BOQ 47 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 48 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 49 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
08/02/2020 BOQ 50 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
diesel generator set, continuous rating, as per the technical specification, engine & alternator
E2101 pre-installed on a common rigid frame, switchgear, day tank incorporated into the frame,
exhaust piping system and all accessories required for installation at WWTP, alternator: 250
KVA, 3 phase, 400 V, 1500 RPM No. 1
Sum
E2102 Bridge (traveling) crane with fixed I beam, manual hoist with integral trolley capacity 3 ton,
chain & all accessories required to fix the crane 1
E2103 Supply and connect up complete semi-rotary hand pump including supports, drip tray, hose
connection and the like as required No. 1
E2200 Other
E2201 Chaquer plate Sum 1
The Tenderer is to describe hereunder, inserting any relevant clause number, any other works
E2202 obligations or things that may be referred to in the Conditions of Contract, Specifications,
Drawings or Data Schedule for which no separate item has been included in the schedule of
prices and for which he desires to enter a separate charge ( this charge is to be entered
in the Amount Column) If no charge is entered hereunder, rates and amounts elsewhere in the
Schedule of prices shall be deemed to cover all expenses for such works, obligations or things.
08/02/2020 BOQ 51 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
52 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
1.12 One meter width semi dressed stone pavement around building and m2 53.20
jointed with cement mortar mix. 1:3 and including earthworks & bedding
materials
1.13 Semi-dressed stone lined and pointed (1:3) trapezoidal drainage ditch m2 109.80
around the building size 50cm deep, 20cm bottom width and 20cm
shoulder on one side. Side slopes 1:1 & area in development length.
Works include earthworks.
2 Concrete Work
2.1 5 cm thick lean concrete C-5 under footing & grade beams m2 69.36
2.2 Ditto, but under ground floor slab m2 133.20
2.3 C-25 concrete in footings m3
13.50
2.4 Ditto, but in foundation columns m3 3.12
2.5 Reinforced concrete in ground floor slab 15 cm thick with C-20 m2 133.20
concrete class
2.6 Reinforced concrete in grade beams with C-25 concrete class m3 7.81
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 53 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 54 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 55 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 56 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and construct PN16 GS, DCI or uPVC pipes and fittings as per
the specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bolts, bedding and
earthworks for a depth not less than 800mm.
23 Galvanized Steel Pipes with all fittings and accessories
23.1 Diam. 5 mm ml 18.00
23.2 Diam. 18.75 mm ml 72.00
Supply and construct PN4 PVC pipes and fittings as per the
specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bedding and earthworks for a
depth not less than 800mm.
24 PVC pipe for sewage drainage with all fitting and accessories
24.1 Diam. 150 mm ml 30.00
24.2 Diam. 100 mm ml 12.00
24.3 Diam. 50 mm ml 6.00
25 Gate valves made of bronze with all accessories (PN 16) and approved
by the Engineer
25.1 Diam. 5 mm pcs 2.00
25.2 Diam. 18.75 mm pcs 5.00
25.3 White
White Vitreous WC with
Vitreous hand lowbasin
wash flushwith
including all and
pedistal accessorriees
all accessories for pcs 2.00
25.4 cold water size 500x405 pcs 2.00
25.5 Enameled steel grated floor drain diam. 50 mm pcs 2.00
25.6 50x40cm wide approved crystal glass mirror pcs 2.00
25.7 pcs 1.00
BOQ Page 57 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 58 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 59 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 60 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Metal Work for External Windows and Doors with LTZ black steel
profile frame 38mm wide & 1.5mm thick all according to the drawing
with all grills, anti-rust and other paintings and all handle and lock
accessories.
13.0 Windows
13.1 Size type W1 size 140x60 pcs 8.00
13.2 Size type W2 size 140x180 pcs 1.00
14.0 Doors
14.1 Size type D2 size 150x210 pcs 1.00
Size type D3 size 355x210 (sliding door with bottom & top rolling guide, pcs 1
14.2 stopper and all other accessories)
Plastering & Pointing Work
15.0 Pointing
15.1 Recessed pointing to external masonry surface above the ground m2 24.40
16.0
Two coats of plastering with cement mortar mix. 1:3 to surface of
16.1 HCB & concrete internal wall surface m2 250.00
16.2 HCB & concrete external wall surface m2
250.00
17.0 Fine coats cement plaster to surface of:-
17.1 HCB & concrete internal wall surface m2 250.00
17.2 HCB & concrete external wall surface m2
250.00
18.0 Terrazzo tile flooring & skirting
18.1 Terrazzo tile flooring m2 140.37
18.2 Terrazzo skirting size 10/2 cm ml 82.00
19.0 Window cill
19.1 Size 27/3 terrazzo window cill ml 20.20
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 61 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 62 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
2.4 Semi-dressed stone lined and pointed (1:3) trapezoidal drainage ditch m2 96.80
around the building size: 50cm deep, 20cm bottom width and 20cm
shoulder on one side. Side slopes 1:1 & area in development length.
Works include earthworks.
BOQ Page 63 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 64 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Metal Work for External Windows and Doors with LTZ black steel profile
frame 38mm wide & 1.5mm thick all according to the drawing with all
grills, anti-rust and other paintings and all handle and lock accessories.
11.0 Windows
11.1 Type D1 size 180x120cm pcs 2.00
11.2 Type D2 size 140x120cm pcs 2.00
11.3 Type D3 size 50x50 cm pcs 1.00
Plastering & Pointing Work
12.0 Pointing
1 Recessed pointing to external masonry surface above the ground m2 15.20
13.0 Two coats of plastering with cement mortar mix. 1:3 to surface of
13.1 HCB & concrete internal and external wall surface m2 147.42
14.0 Fine coats cement plaster to surface of
14.1 HCB & concrete internal and external wall surface m2 147.42
15.0 Glazing
15.1 4mm thick m2 7.70
16.0 Floor & Wall Finishing
16.1 5cm thick cement screed for the floors m2 63.77
16.2 Plastic tile flooring m2 52.00
16.3 Plastic skirting ml 50.00
17.0 Terrazzo tile flooring & skirting
17.1 Terrazzo tile flooring m2 11.76
17.2 Terrazzo skirting size 10/2 cm ml 9.30
18.0 Ceramic wall tile
18.1 6 mm thick white ceramic wall tile m2 17.00
19.0 Window cill
19.1 Size 27/3 terrazzo window cill m2 1.84
Painting
20.0 Plastic emulsion paint
20.1 Plastered vertical wall surface m2 147.42
20.2 Chip wood ceiling m2
73.92
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 65 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and construct PN16 GS, DCI or uPVC pipes and fittings as per
the specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bolts, bedding and earthworks
for a depth not less than 800mm.
21.0 Galvanized Steel Pipes
21.1 Diam. 5 mm ml 12.00
21.2 Diam. 18.75 mm ml 36.00
Supply and construct PN4 PVC pipes and fittings as per the
specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bedding and earthworks for a
depth not less than 800mm.
22.0 PVC pipe for sewage drainage
22.1 Diam. 150 mm ml 30.00
22.2 Diam. 100 mm ml 6.00
22.3 Diam. 50 mm ml 12
23.0 Gate valves made of bronze & approved by the Engineer
23.1 Diam. 5 mm pcs 4.00
23.2 Diam. 18.75 mm pcs 2.00
23.3 White Vitreous WC with low flush including all accessories pcs 1.00
23.4 White Vitreous hand wash basin with pedistal for cold water size 500x40 pcs 1.00
23.5 White plated metallic shower plate 0.8x0.8m with towel hanger, soap and pcs 1.00
23.6 Enameled steel grated floor drain diam. 50 mm pcs 2.00
23.7 50x40cm wide approved crystal glass mirror pcs 1.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 66 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 67 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
26.4 Semi-dressed stone lined and pointed (1:3) trapezoidal drainage ditch m2 30.42
around the building size: 50cm deep, 20cm bottom width and 20cm
shoulder on one side. Side slopes 1:1 & area in development length.
Works include earthworks.
B. SUPER-STRUCTURES
30.0 Concrete Work IN CONCRETE C-25
30.1 In elevation columns m3 0.65
30.2 In suspended beams m3
0.87
30.4 In lintels m3 0.18
30.5 In 15 cm thick floor slab m2
14.68
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 68 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Metal Work for External Windows and Doors with LTZ black steel profile
frame 38mm wide & 1.5mm thick all according to the drawing with all
grills, anti-rust and other paintings and all handle and lock accessories.
36.1 Type D1 size 100x120cm pcs 2.00
36.2 Type D3 size 50x50 cm pcs 1.00
Plastering & Pointing Work
37.0 Pointing
37.1 Recessed pointing to external masonry surface above the ground m2 8.20
38.0
Two coats of plastering with cement mortar mix. 1:3 to surface of
38.1 HCB & concrete internal and external wall surface m2 43.34
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 69 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and construct PN16 GS, DCI or uPVC pipes and fittings as per
the specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bolts and earthworks for a
depth not less than 800mm.
42.0 Galvanized Steel Pipes
42.1 Diam. 5 mm ml 18.00
42.2 Diam. 18.75 mm ml 24.00
Supply and construct PN4 PVC pipes and fittings as per the
specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bedding and earthworks for a
depth not less than 800mm.
43.0 PVC pipe for sewage drainage
43.1 Diam. 150 mm ml 12.00
43.2 Diam. 100 mm ml 12.00
43.3 Diam. 50 mm ml 6.00
44.0 Gate valves made of bronze approved by the Engineer
44.1 Diam. 5 mm pcs 3.00
44.2 Diam. 18.75 mm pcs 4.00
44.3 White Vitreous WC with low flush with all accessories pcs 1.00
44.4 White Vitreous hand wash basin with pedistal for cold water size pcs 1.00
500x405
44.5 White plated metallic shower plate 0.8x0.8m with approved shower pcs 1.00
head
44.6 Enameled steel grated floor drain diam. 50 mm pcs 1.00
44.7 50x40cm wide approved crystaal glass mirror pcs 1.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 70 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 71 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 72 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 73 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 74 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
1.5 Cart away excavated material to a distance not exceeding 1km and 115.70
place as embankment protection m 3
1.6 Selected excavated fill material and compacted every 20cm layer to
standard proctor density. m3 7.00
1.7 Selected borrowed fill material and compacted every 20cm layer to 120.80
standard proctor density m 3
1.8 25 cm thick hard core filling and blinded with basaltic or equivalent
material m2 35.40
2.0 Stone Masonry
2.1 50cm width stone masonry wall , impermeable, non-weathered and
non-fractured stone buried inside the earth m3 18.00
2.2 50cm width stone masonry wall , impermeable, non-weathered and
non-fractured stone external surface left for pointing m3 6.00
2.3
One meter width semi dressed stone pavement around building and
jointed with cement mortar mix. 1:3 including earthworks and bedding m2 30.00
2.4
Semi-dressed stone lined and pointed (1:3) trapezoidal drainage ditch
around the building size: 50cm deep, 20cm bottom width and 20cm
shoulder on one side. Side slopes 1:1 & area in development length.
Works include earthworks. m2 78.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 75 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
B. SUPER-STRUCTURES
6.0 Concrete Work IN CONCRETE C-25
6.1 In elevation columns m3 1.08
6.2 In suspended beams m3 1.50
7.0 Sawn zigba or equivqlnet form work
7.1 In elevation columns m2 21.60
7.2 In suspended beams m2 14.70
8.0
Mild steel rod reinforcement, cutting, bending, & placing in position
BOQ Page 76 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
horizontally
10.4 Gauge 28 galvanized iron sheet gutter girth 33 cm welded at joints and 17.00
2% slope is provided towards down pipe. Price shall include three ml
coats of oil paint
10.5 Ditto, but 75 mm down pipe fixed to wall with metal straps ml 18.60
11.0 Carpentry and Joinery
11.1 Supply &construct roof ceiling with 8mm chip wood on 4x5cm batten m2 28.00
Metal Work for External Windows and Doors with LTZ black steel
profile frame 38mm wide & 1.5mm thick all according to the drawing
with all grills, anti-rust and other paintings and all handle and lock
accessories.
Thick chicken wire (3mm to 5mm diam.) mesh and framed steel
12.0 windows
1 Size 330cm x 40cm pcs 4
13.0 Single metal door including keys and lockers
13.1 Size 70cmx210cm pcs 4.00
13.2 Size 60cmx210cm with internal metallic lock/lash pcs 10.00
Plastering & Pointing Work
14.0 Pointing
14.1 Recessed pointing to external masonry surface above the ground m2 11.00
14.2 3cm thick cement screed for the floors m 2
28.00
14.3 Two coats of plastering with cement mortar mix. 1:3 to surface of
a HCB and concrete internal wall surface m2 230.00
b HCB and concrete external wall surface m2 79.40
14.4 Fine coats cement plaster to surface of:-
a HCB and concrete internal wall surface m2 230.00
b HCB and concrete external wall surface m2 79.40
15.0 Terrazzo tile flooring & skirting
15.1 Terrazzo tile flooring m2 28.00
15.2 Terrazzo skirting size 10/2 cm ml 22.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 77 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and construct PN16 GS, DCI or uPVC pipes and fittings as per
the specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bolts and earthworks for a
depth not less than 800mm.
20.0 Galvanized Steel Pipes
20.1 Diam. 5 mm ml 72.00
20.2 Diam. 18.75 mm ml 25.00
20.3 diam. 25 mm ml 12.00
Supply and construct PN4 PVC pipes and fittings as per the
specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bedding and earthworks for a
depth not less than 800mm.
21.0 PVC pipe for sewage drainage
21.1 Diam. 100 mm ml 25.60
22.0 Gate valves made of bronze approved by the Engineer
22.1 Diam. 5 mm pcs 14.00
22.2 Diam. 18.75 mm pcs 2.00
22.3 Diam. 25 mm pcs 1.00
23.0 WC and urinals
Turkish WC with high flush bowls including soap holder and all
23.1 accessories pcs 10.00
23.2 White Vitreous urinals pcs 2.00
23.3 Enameled steel grated floor drain diam. 50 mm pcs 2.00
White Vitreous hand wash basin with pedistal for cold water size
23.4 500x405mm pcs 8.00
23.5 500x400mm wide approved crystal glass mirror pcs 8.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 78 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 79 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
1.5 Cart away excavated material to a distance not exceeding 1km and 83.64
place as embankment protection m 3
1.6 Selected excavated fill material and compacted every 20cm layer to
standard proctor density. m3 6.00
1.7 Selected borrowed fill material and compacted every 20cm layer to 141.98
standard proctor density m 3
1.8 25 cm thick hard core filling and blinded with basaltic or equivalent
material m2 16.60
2 Stone Masonry
2.1 50cm width stone masonry wall , impermeable, non-weathered and
non-fractured stone buried inside the earth m3 15.30
2.2 50cm width stone masonry wall , impermeable, non-weathered and
non-fractured stone external surface left for pointing m3 4.10
2.3
One meter width semi dressed stone pavement around building and
jointed with cement mortar mix. 1:3 including earthworks and bedding m2 27.00
2.4
Semi-dressed stone lined and pointed (1:3) trapezoidal drainage ditch
around the building size: 50cm deep, 20cm bottom width and 20cm
shoulder on one side. Side slopes 1:1 & area in development length.
Works incclude earthworks. m2 72.20
3.0 Concrete Work
3.1 5 cm thick lean concrete C-5 under footing m2 8.00
3.2 Ditto, but under ground floor slab & beams m 2
16.84
3.3 Reinforced concrete with C - 25 Concrete Class for : -
3.4 Footings m3 2.00
3.5 Sub-grade columns m3 1.04
3.6 Grade beams m3 0.93
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 80 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
5.1 37.00
Diam. 6mm bars for stirrups c/c 20cm of beams & sub-grade columns kg
5.2 Diam. 8mm deformed for slab c/c 20cm kg 71.00
5.3 Diam. 10mm deformed for footing kg 77.00
5.4 Diam. 12mm deformed grade beams and sub-grade columns kg 210.00
B. SUPER-STRUCTURES
7.0 Concrete Work IN CONCRETE C-25
7.1 In elevation columns m3 0.80
7.2 In suspended beams m3 0.93
8.0 Sawn zigba or equivqlnet form work
8.1 In elevation columns m2 16.00
8.2 In suspended beams m2 9.00
9.0
Mild steel rod reinforcement, cutting, bending, tying & placing in position
BOQ Page 81 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Metal Work for External Windows and Doors with LTZ black steel
profile frame 38mm wide & 1.5mm thick all according to the drawing
with all grills, anti-rust and other paintings and all handle and lock
accessories.
13.00 Glazed and framed steel windows
13.1 Size 40x40cm pcs 5
Thick chicken wire (3mm to 5mm diam.) mesh and framed steel
14 windows
6.6.14. Size 100x40cm pcs 2
15 External single metal door
15.10 Size 70X210cm (top glazed for lighting) pcs 2.00
15.20 Size 60cmx210cm with internal metallic lock/lash pcs 5
16 Plastering & Pointing Work
16.10 Recessed pointing to external masonry surface above the ground m2 8.80
16.20 3cm thick cement screed for the floors m2 1.00
16.30 Two coats of plastering with cement mortar mix. 1:3 to surface of
a HCB & concrete internal wall surface m2 57.00
b HCB & concrete external wall surface m2 73.00
16.4 Fine coats cement plaster to surface of:-
a HCB & concrete internal wall surface m2 57.00
b HCB & concrete external wall surface m2 73.00
17 Terrazzo tile flooring & skirting
17.1 Terrazzo tile flooring m2 1.00
17.2 Terrazzo skirting size 10/2 cm ml 34.80
18 Ceramic wall tile
18.1 6 mm thick white ceramic wall tile m2 52.00
19 Window cill
19.1 Size 27/3 terrazzo window cill m 2.00
20.0 Steps
20.1 3 cm thick terrazo threads size 33x100 cm m2 0.99
20.2 3 cm thick terrazo risers size 15x100 cm m2 0.45
21.0 Plastic emulsion paint
21.1 Plastered vertical wall surface m2 130.00
21.2 Chip wood ceiling m2 16.60
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 82 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and construct PN16 GS, DCI or uPVC pipes and fittings as per
the specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bolts and earthworks for a
depth not less than 800mm.
22.0 Galvanized Steel Pipes
22.1 Diam. 5 mm ml 15.00
22.2 Diam. 18.75 mm ml 17.00
22.3 diam. 25 mm ml 6.00
Supply and construct PN4 PVC pipes and fittings as per the
specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bedding and earthworks for a
depth not less than 800mm.
23.0 PVC pipe for sewage drainage
23.1 Diam. 100 mm ml 24.00
24.0 Gate valves made of bronze approved by the Engineer
24.1 Diam. 5 mm pcs 5.00
24.2 Diam. 18.75 mm pcs 1.00
24.3 Diam. 25 mm pcs 1.00
25.0 Showers
25.1 White plated metallic shower plate 0.8x0.8m with approved shower
head pcs 5
25.2 Enameled steel grated floor drain diam. 50 mm pcs 3.00
25.3 50x40cm wide approved crystal glass mirror pcs 3.00
25.4 White Vitreous hand wash basin with pedistal for cold water size
500x405 pcs 3.00
26.0 Electrical Installation
26.1 Cable ducts with inspection pits ml 30.00
26.2 Supply and install sub-distribution board SDB for flush mounted
complete with bars and other accessories consisting of pcs 1.00
26.3 uPVC feeder cable (4 x 10mm2) ml 100.00
26.4 uPVC feeder cable (3 x 2.5mm2) ml 200.00
26.5 Lighting points pcs 5.00
26.6 15 A single phase power points pcs 2.00
26.7 25 A three phase power points pcs
26.8 Fluorescent lighting (40W) pcs 3.00
26.9 Water proof bulkhead lighting pcs 3.00
26.1 Fluorescent lighting (60W) pcs 3.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BILL TOTAL CARRIED SUMMARY
BOQ Page 83 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
jointed with cement mortar mix. 1:3 and including earthworks & bedding
materials
23.00
2.4 Semi-dressed stone lined and pointed (1:3) trapezoidal drainage ditch m2
around the building size 50cm deep, 20cm bottom width and 20cm
shoulder on one side. Side slopes 1:1 & area in development length.
Works include earthworks.
39.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 84 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 85 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Metal Work for External Windows and Doors with LTZ black steel
profile frame 38mm wide & 1.5mm thick all according to the drawing
with all grills, anti-rust and other paintings and all handle and lock
accessories.
12.0 Windows
1.0 Metal framed windows with profiles cut and welded along the entire line
of contact and covered with chicken wire mesh. Size 150x150cm pc. 2
Ditto but size 150x100cm pc. 1
13.0 DOORS
13.1
Metallic sliding framed Doors with profiles cut and welded along the
entire line of contact and covered with 3mm thick metal sheet. The main
door will have internal small door. Size 300x300cm pc. 1
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 86 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 87 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Supply and lay PN16 GS, DCI, HDPE or uPVC pipes and fittings as per
the specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bolts and earthworks for a
depth not less than 800mm.
1.1 HDPE 50mm for main source m 1,200.00
1.2 HDPE 25mm m 150.00
1.3 HDPE 18.75mm m 48.00
1.4 HDPE 5mm for garden taps (the standing part shall be GS pipe). m 1,500.00
1.5 DN50mm gate valves with unions and other fitting materials No 2.00
1.6 DN25mm gate valves with unions and other fitting materials No 4.00
1.7 DN18.75mm gate valves with unions and other fitting materials No 6.00
1.8 DN5mm gate valves with unions and other fitting materials No 8.00
1.9 DN5mm taps with unions and other fitting materials. The standing part
shall be GS pipe with adaptor for HDPE. No 3.00
1.10
Supply and install circular plain concrete manhole (600mm internal
diameter, 1000mm depth & 60mm thickness) including earthworks and
cover for the valve chamber with locks arrangements No 12.00
2 External Sewerage
Supply and construct PN6 PVC pipes and fittings as per the
specification. Transport to site and store. The rate to include all
necessary fittings, gaskets, rubber seals, bedding and earthworks for a
depth not less than 800mm.
2.1 DN 110mm around the buildings m 96.00
2.2 DN 150mm collectors and main sewer m 630.00
2.3
Supply and install circular plain concrete manhole (600mm internal
diameter, 1000m - 2000mm depth & 60mm thickness) for main sewers
and house outlet connections. Costs including earthworks, cover, steps
and bottom benching. No 40.00
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BOQ Page 88 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
5.0
Gravel Minor Roads DS8 (Width = 4m & about 300m length for unit
operations and processes interconnections only)
5.1
Excavation of the unsuitable black soil for depth of about 600mm for
pond interconnecting roads as per the drawing (ditch excavation is
included). m3 6,786.00
5.2 Cart away excavated material to a distance not exceeding 1km and
place as embankment protection m3 6,786.00
5.3 Cut and Borrow to fill as per the drawing
(a) Improved Subgrade Upper Layer 200mm thickness (G20) m3 1,144.00
(b) m 3
Improved Subgrade Lower Layer 600mm thickness and above at river
crossings (G7) 6,786.00
Gravel Wearing Course and Shoulders as per the drawing
5.4 150mm thick Type 4 gravel wearing course m3 839.00
BOQ Page 89 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Pre cast concrete curb stone in C-20 and chamfered all top edges
around parking area, round about, grass lots and for walkway sides.
Cost includes earthworks, formworks, concrete, etc.
7.5 Size 10/40cm m 400.00
BOQ Page 90 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
No 1.00
10.3 Ditto but width 3m No 2.00
11.0 LANDSCAPING
Transportation of red lateritic soils of 300mm thick in the parking areas
and operator dwelling house and plant grasses on the green area and
11.1 other ornamental plant species around the grassing with follow ups till
transfer to the client.
m2 120.00
Plant and follow-up the growth of different plant species in rows by
using landscaping specialist and wwith the approval of the Engineer.
11.2 The lemons, oranges and bananas shall be located d/s to use the
effluent.
BOQ Page 91 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Excavate and construct earthen ditch to divert the flood water coming to
the anaerobic ponds and flood protection embankment. The ditch shall
2.3 1,800
have 3.0m bottom width, 1:2 (V:H) side slopes and variable depth (but
maximum 1.5m height).
m3
2.4 Disposal of excavated materials within 5km distance m3 1,800
PAGE TOTAL CARRIED FORWARD TO BILL SUMMARY
BILL TOTAL CARRIED SUMMARY
BOQ Page 92 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 93 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
Sub-total Labour
Allow ___percent of sub-total for Contractor's %
overheads, profit etc in accordance with parg. 3(b)
Schedule 2 : Materials
M.001 Cement kg 600
M.002 20mm Aggregate for concrete m3 50
M.003 Concrete sand m3 50
M.004 Dressed masonry m3 30
M.005 High tensile steel 500 Mpa (All diameters) kg 600
M.006 Mild steel 300 Mpa (All diameters) kg 100
M.007 100kg riprap m3 20
M.008 Dressed stone m2 50
M.009 Geomembrane ( ) m2 100
BOQ Page 94 of 95
AKAKI CATCHMENTS WASTEWATER MANAGEMENT SYSTEM PROJECT
BOQ Page 95 of 95