Tool box talk – Reinforcement work

☞ Check the drawing are approved and latest


☞ Check the area is clean
☞ Check any concrete slurry leakage need to be removed
☞ Check any excess concrete, construction joint preparation to be done
☞ Check the brand and diameter of the rebar
☞ Check the rebar’s are neat and clean, no damages in the rebar
☞ Check the cut & bend rebar tag and verify the location
☞ Check placement of rebar for position, spacing, diameter, etc.,
☞ Check necessary additional rebar for chair, gauge, links, etc.,
☞ Check the lapping as per drawing & standards
☞ Check the size of the rebar as per the drawing
☞ Check the additional bars as per the drawing/provided
☞ Check the cut out opening as per drawing
☞ Check the cut out bars provided as per GA drawing (diagonals, etc.,)
☞ Check the binding wire tied as agreed and continues
☞ Check the binding wire knot and bend inside the rebar
☞ Check no binding wire cut or left inside the concrete area
☞ Check the insert are provided as per the approved drawing
☞ Check inspection completed and approved for further work
Tool box talk – Shuttering and formwork

☞ Check the drawings are approved


☞ Check the base area firm & stable to keep the scaffolding
☞ Check the adequate supports provided as required and drawing
☞ Check the approval/clearance for formwork
☞ Check there is no gap in the formwork and it is water tight
☞ Check stopper/CJ provided as required
☞ Check the CJ provided as per the approved drawing
☞ Check the cut outs provided as per the drawing
☞ Check the side supports are provided and intact & rigid.
☞ Check the Hyrib provision and support
☞ Check the dimension of formwork as per drawing
☞ Check the alignment, verticality and acceptable
☞ Check the availability of shuttering foreman during concrete
☞ Check the availability of worker to tab the shutter during concrete
☞ Ensure the cleaning and removal of debris, binding wire, etc.,
☞ Check the surveyor cleared for level and coordinates
☞ Check the provision of anchor bolt and cleared
☞ Check the requirement of water bar/fuko VT as per drawing.
☞ Check the waterproofing done as per the drawing
Tool box talk – Concreting

☞ Check the drawings are approved


☞ Check the base area firm & stable to keep the scaffolding
☞ Check MEP clearance to proceed for concrete
☞ Check structural steel, survey clearance if required
☞ Check the all the stakeholders signed the checklist
☞ Check the area is clean and construction joint acceptable
☞ Check the bonding agent applied at CJ
☞ Check the approval from client to proceed for concrete
☞ Check the TBT conducted for concreting works
☞ Check for any additional information related to concrete
☞ Check the concrete grade as per drawing
☞ Check the concrete slump & temp. is cleared by 3rd party technician
☞ Check concrete placer pump accessible in all the area
☞ Check availability of mason, vibrator, needle and necessary tools
☞ Check the pouring sequence discussed within the team
☞ Check the concrete pouring done layer by layer
☞ Check the concrete compacted uniformly
☞ Check poker needle reached all the area
☞ Check concrete finished up to required level
☞ Check finishing of concrete as required
☞ Check the rebar/anchor bolt, etc., protected and cleaned
☞ Check the curing arrangement sufficient
Tool box talk – Concrete repairing works

☞ Check the area marked as reported


☞ Check availability of repairing material
☞ Check the necessary IR raised for repairing/registered
☞ Check the TBT conducted as per the approved method statement
☞ Check grind cut done to define edges of repair
☞ Check all the loose materials are chipped off concrete surface sound
☞ Check the light tools have been used for chipping
☞ Check any cement laitance need to be removed
☞ Check the area is cleaned by air
☞ Check the repair area washed with water and soaked as required
☞ Check the surface is accepted to proceed for repairing
☞ Check the bonding agent applied and it is sticky to receive repair material
☞ Check the repairing material mixed as per the recommendation
☞ Check the repair material applied by trowel continuously
☞ Check the formwork if repairing do be done by pouring
☞ Check the joints are matching with the existing concrete surface
☞ Check any grinding required to smooth the surface
☞ Check curing requirement and arranged
Tool box talk – Block work

☞ Check the drawings are approved


Tool box talk – Plastering

☞ Check the drawings are approved


Tool box talk – Painting

☞ Check the drawings are approved