Вы находитесь на странице: 1из 40

SPECIFICATION

Sr. No. Work Specification


1 SITE CLEARENCE Providing & Cleaning the site including cleaning the ground, setting out by lime powder, centre
line, temporary shuttering & deposited removed stuff beyond 5Om from the plot boundary,
removing trees, bushes, etc
2 SETTING OUT The Contractor shall be responsible for the true & proper setting out of the works & for the
correctness of the position levels, dimensions & alignment of all parts of the works & for the
provision of all necessary instruments, appliances & labour in connection therewith. If at any time
during the progress of the works any error shall appear or arise in the position levels, dimensions or
alignment of any part of the works, the Contractor on being required so to do by the Engineer or the
Engineer’s Representative in which case the expense of rectifying the same shall be borne by the
Contractor. The checking of any setting-out or of any line or level by the Engineer or Engineers’
representative shall not in any way relieve the Contractor of his responsibility for the correctness
thereof & the Contractor shall carefully protect & preserve all bench-marks, sight, rails, pegs &
other things used in setting out the Works.

3 EXCAVATION Excavation for foundation in hard murum –including removing the excavated material up to
distance of 50 metres beyond the building - area & stacking. & spreading as directed, dewatering,
preparing the bed for the foundation & necessary back filling, ramming, watering including shoring
strutting etc. complete

Note: After land dressing to the required level, the dressed levels will be recorded & these levels
will be taken as 0.00m to calculate further excavation for foundations, trenches etc.

4 SOLING Providing dry trap/ granite/ quartzite/ gneiss rubble stone soling 23 cm thick including hand packing
& compacting complete
5 PCC FOR Providing & laying Plain cement concrete of nominal mix 1:3:6 under foundation of cloumn based,
FOOTING beams, walls, under raft slab etc. with 25mm down guage aggregate & cured using necessary
formwork if required in all position as directed.
Note: All reinforced cement concrete items mentioned below shall be machine mixed, machine
vibrated with mix M200 & 19 mm guage course aggregate ( 19mm downgraded) laid in respective
items consolidated & cured. The rates shall be inclusive of form work, scaffolding, vibrating curing
& hacking. The item of reinforcement shall be quoted seperately given in the schedule using good
quality of binding wire. (Binding wire shall not be paid extra & shall not be accounted in
measurement).

6 CONCRETE FOR Providing & laying in situ cement concrete of M-20 grade of trap/granite/quartzite/ gneiss metal for
FOOTINGS R.C.C. work in foundations like footings, footings of R.C.C. columns & steel stanchion including
bailing-out water manually formwork, compacting, lowering newly laid concrete by gunny bag,
plastic or tarpaulin, curing & roughening the surface if special finish is to be provided( Excluding
reinforcement & structural steel) The cement mortar 1:3 plaster is considered for rendering uneven
& honeycombed surface only. (Wooden planks/shuttering will not be allowed)

7 PLINTH FILL Filling in plinth & floors with contractors supplied murum filling in 23 cm layers including watering
& compaction
8 RCC COLUMNS Providing & casting in situ cement concrete of M-20 grade of trap/ granite/ quartzite/ gneiss metal
for R.C.C. Columns as per detailed designs & drawings or as directed including centring, formwork
of plywood / steel, compaction, covering newly laid concrete by gunny bag, plastic or tarpaulin,
finishing the formed surface- with cement mortar 1:3 of sufficient minimum thickness to give a
smooth & even surface or roughening if special finish is to be provided & curing etc. complete..
(Excluding reinforcement.) The cm 1:3 plaster is considered for rendering uneven & honeycombed
surface - only.(Wooden planks/shutting will not be allowed)

9 RCC BEAMS Providing & casting in situ cement concrete of M-20 grade of trap/ granite/ quartzite/ gneiss metal
for R.C.C. beams & lintel as per detailed designs & drawings or as directed including centring,
formwork of plywood / steel, compaction, covering newly laid concrete by gunny bag, plastic or
tarpaulin, finishing the formed surface- with cement mortar 1:3 of sufficient minimum thickness to
give a smooth & even surface or roughening if special finish is to be provided & curing etc.
complete..(Excluding reinforcement.) The cm 1:3 plaster is considered for rendering uneven &
honeycombed surface - only.(Wooden planks/shutting will not be allowed)
10 RCC SLAB Providing & casting in situ cement concrete of M-20 grade of trap/ granite/ quartzite/ gneiss metal
for R.C.C. Slab as per detailed designs & drawings or as directed including centring, formwork of
plywood / steel, compaction, covering newly laid concrete by gunny bag, plastic or tarpaulin,
finishing the formed surface- with cement mortar 1:3 of sufficient minimum thickness to give a
smooth & even surface or roughening if special finish is to be provided & curing etc. complete..
(Excluding reinforcement.) The cm 1:3 plaster is considered for rendering uneven & honeycombed
surface - only.(Wooden planks/shutting will not be allowed)

11 RCC Providing & casting in situ cement concrete of M-20 grade of trap/ granite/ quartzite/ gneiss metal
PROJECTIONS for R.C.C. Chajja at Lintel level & Canopy Projection as per detailed designs & drawings or as
directed including centring, formwork of plywood / steel, compaction, covering newly laid concrete
by gunny bag, plastic or tarpaulin, finishing the formed surface- with cement mortar 1:3 of sufficient
minimum thickness to give a smooth & even surface or roughening if special finish is to be provided
& curing etc. complete..(Excluding reinforcement.) The cm 1:3 plaster is considered for rendering
uneven & honeycombed surface - only.(Wooden planks/shutting will not be allowed)

12 BRICKWORK Providing Bricks masonry in cement mortar 1:6 using 1st class bricks in 0.23 brick'thick wall for
(230MM WALL) plinth raking out joints & watering including all leads & lift complete.
13 DOOR & WINDOW Note: All flush doors are exclusive of complete hardware as shown in drawings & specifications.
OPENINGS Samples of all doors, windows & ventilators with their complete fittings & fixtures, glazings etc.
are to be approved by the Architect / Employer before procurement of the complete items.

All the hardware, locks, accessories shall be provided free of cost by the client for the flush doors
only.
If the material is spoilt by the contarctor the price will be recovered by the contractor as per
procurement receipt.
All aluminium sliding windows shall be of Ajit India GK series or equivalent such as Alumilite,
Jindal etc.
The rates quoted shall include fixing charges of verious accessories, locks of wooden doors only.

Alluminium door & windows shall have its own accessories provided & bourn by the contractor.

All alluminium work will be colour anodised, colour will be decided by the Architect.

Fixing in position 40 mm thick flush shutter doors phynyl formaldehtde bonded consisting of
providing & fixing 125 x 65mm African teak frames & 1mm laminate on both sides of the shutter &
painted with three coats of flat enamel paint of approved make & tint over one coat of primer etc.
complete as per drawing including only fixing accessories, iron mongery etc. (Material of Only door
frame & paint to be provided by contractor.)

Supplying & fixing in position fabricated aluminium fixed windows/ ventilators with extruded
anodised (20 microns) matt finished aluminium sections for frame mullions transoms, glazing bars,
or other members etc. from Jindal & glazed with 5 mm thick plain tinted sheet glass with P.V.C.
lining etc. complete as per drawings & specifications. All windows & ventilators are inclusive of
aluminium subframe.As per Drawing.

Providing & fixing in position 6 mm thick fixed frosted glass adjustable louvers with exahust fan
provision in aluminium frame with 20 micron anodising of approved shade with all necessary
accessories.
14 TERRACE Providing cement based water proofing treatment to terrace (India waterproofing or equivalnt) for
WATERPROOFING all lifts with brick bats laid in required slope to drain the water for any span after cleaning the base
surface, applying a coat of cement slurry admixed with approved waterproofing compound & laying
the brick bats on cement slurry in CM 1:5 admixed wtih waterproofing compound, filling upto half
depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer, loining of
brickbats with CM 1:3 admixed

with approved water proofing compound & finally top finishing with average 50mm thick layer of
same mortar added with water proffing compound including finishing the surface smooth with
cement slurry admixed with approved water proofing compound, marking finished surface smooth
with false squares of 300mm X 300mm, making junctions at the parapet rounded & tapered towards
top for required height, with recess at the junction of plaster & parapet, curing (Minimum thickness
65mm, average thickness fo brick bat 120 mm. of brick bat. (Only plan area will be counted for
measurement).
15 INTERNAL Providing internal cement plaster 12-15mm thick in single coat in cement mortar 1:4 to concrete or
PLASTER brick surfaces, finished even & smooth in line, level & plumb in all positions including surface
preparation by hacking, scaffolding, curing etc. complete for all lifts. (Rate to include for 15cm
chicken wiremesh, 24 G. S. S. wire at joints of RCC & masonry).

16 EXTERNAL Providing external 18-20 mm thick sand faced plaster on external surface in cement mortar in all
PLASTER positions in line, level & plumb in two coats, first base coat of 12mm thick in CM. 1:4 including
curing for 48 hours, roughning the surface of base coat to apply top coat 6mm thick in CM. 1:3, 48
hours after providing base coat including surface preparation by hacking, scaffolding, sand faced
treatment, finishing the surface by taking out grains, curing etc. complete including 30 X 12mm
raised drip mould as directed for all lifts. (Rate to include for 15cm chicken wiremesh, 24 G. S. S.
wire at joints of RCC & masonry) (No additional payment will be made for drip mould).

17 FLOORING Only laying & fixing 10 mm machine cut, machine polished Marble tiles of size 600x600 over
mortar bedding close jointed & pointed with matching Cu.M. 1:3 finished to levels, slope or plumb
as required & cured, including dressing etc. complete.

For skirting with cement mortar 1:4 bedding, 10 mm thick. 150mm wide.
Only laying & fixing 25 mm thick machine cut, machine polished(Mirror finish)Kotah stone over
mortar bedding close jointed & pointed with matching CM. 1:3 finished to levels, slope or plumb as
required & cured, including dressing, ghadai etc. complete. to the satisfaction of the Architects

Only laying & fixing 8 mm thick Glossy/ Antiskid Ceramic tiles laid over a bed of cement mortar
1:3 close jointed with matching cement slurry & finished to level slope or plumb as required, curing,
cleaning, etc. complete. For floors over bed of CM. 20 mm thick & for skirting & dado over CM.
backing 12 mm thick

18 INTERNAL Providing & applying primer + 2 coats of Acrylic emulsion paint of approved brand/ make &
PAINTING manufacturer & of required shade on internal surfaces & inlcuding a priming coat with a distemper
primer of aproved brand & manufacture after thoroughly brushing the surface free from mortar
dropping & other foreign matter & also including preparing the surface even & sand papered
smooth etc complete for all lifts.

19 EXTERIOR Providing & applying one coat of primer & two coats of waterproof cement paint of approved
PAINTING manufacture & of approved colour to external plastered surfaces to give an even shade including
scaffolding, cleaning & preparing the surface thoroughly bruching the surface to remove all dirt &
remains of loose powdered materials etc. complete for all lifts. Sample & brand is to be got
approved from the Engineer before use.

20 CLEARING & On the completion of the Works, the Contractor shall clear away & remove from the Site all
HANDING OVER Constructional Plant surplus materials, rubbish & Temporary Works of every kind & leave the
whole of the Site & Works clean & in a workman-like condition to the satisfaction of the Engineer.
After satisfactory clearance of site ,including labour quarters, virtual completion certificate will be
given by architects
.
MEASURMENT SHEET ABSTRACT SHEET
Dimension
Sr. No. Description of Work Nos. Quantity Unit Rate
L B H
MOBILIZATION
1 SITE CLEARENCE
IN & AROUND THE PLOT 12.29 16.31 1 200 Sq.Mt.
TOTAL SITE CLEARENCE 200 Sq.Mt. ₹0
2 SITE SURVEY & LINE + OUT
IN & AROUND THE PLOT 1 L.S.
TOTAL LINE OUT 1 L.S. ₹0
SUB - STRUCTURE
3 EXCAVATION FOR ORDINARY SOIL
Excavation of Soil UPTO 1.8M DEPTH
1 12.1 11.93 1.8 260 Cu.M.
0 Cu.M.
4 FOOTINGS
4A CONCRETE FOR FOOTINGS (M30 CONCRETE)
C1,C2,C6,C8,C9 5 1.50 1.20 0.45 4 Cu.M.
C4,C5 1 1.80 3.00 0.45 2 Cu.M.
C3,C7,C10 3 1.80 1.20 0.45 3 Cu.M.
TOTAL CONCRETE FOR FOOTINGS 9 Cu.M. ₹0
4B PCC FOR FOOTINGS (1:3:6)
C1,C2,C6,C8,C9 5 1.90 1.60 0.20 3 Cu.M.
C4,C5 1 2.20 3.40 0.20 1 Cu.M.
C3,C7,C10 3 2.20 1.60 0.20 1 Cu.M.
TOTAL PCC FOR FOOTINGS 5 Cu.M. ₹0
4C FORMWORK FOR FOOTINGS
0 Sq.Mt.
0 Sq.Mt.
0 Sq.Mt.
TOTAL FORMWORK FOR FOOTINGS 0 Sq.Mt. ₹0
4D REBAR FOR FOOTINGS @ 90 KG/CUM
KG.
KG.
KG.
TOTAL REBAR FOR FOOTINGS 0 KG. ₹0
5 COLUMN
5A CONCRETE FOR COLUMN (M30 CONCRETE)
0 Cu.M.
0 Cu.M.
0 Cu.M.
TOTAL CONCRETE FOR FOOTINGS 0 Cu.M. ₹0
4B FORMWORK FOR COLUMN
0 Sq.Mt.
0 Sq.Mt.
0 Sq.Mt.
TOTAL FORMWORK FOR FOOTINGS 0 Sq.Mt. ₹0
4C REBAR FOR COLUMN @ 160 KG/CUM
KG.
KG.
KG.
TOTAL REBAR FOR FOOTINGS 0 KG. ₹0
6 PLINTH BEAM
6A CONCRETE FOR PLINT BEAM (M25 CONCRETE)
0 Cu.M.
0 Cu.M.
0 Cu.M.
TOTAL CONCRETE FOR FOOTINGS 0 Cu.M. ₹0
6B FORMWORK FOR PLINTH BEAM
0 Sq.Mt.
0 Sq.Mt.
0 Sq.Mt.
TOTAL FORMWORK FOR FOOTINGS 0 Sq.Mt. ₹0
6C REBAR FOR PLINTH BEAM @ 160 KG/CUM
KG.
KG.
KG.
TOTAL REBAR FOR FOOTINGS 0 KG. ₹0
7 PLINTH FILL WITH EXCAVATED EARTH
0 Cu.M.
0 Cu.M.
TOTAL PLINTH FILL 0 Cu.M. ₹0
SUPER - STRUCTURE
MOBILIZATION
SUB STRUCTURE
SUPER STRUT.
FINISHING
ABSTRACT SHEET PRODUCTIVITY SHEET
Amount Remarks Productivty Duration No of Gangs No of Days Skilled Semi

₹0 #DIV/0! #DIV/0!

₹0

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!
₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 #DIV/0! #DIV/0!

₹0 0 #DIV/0! #DIV/0!
₹0
#REF!
INPUT SHEET
Total
Un Total Semi Total Un Cement Sand Metal Steel Brick
Skilled

0 0 0 NA NA NA NA NA

0 0 0 NA NA NA NA NA

0 0 0 103.356 2.349 4.698 NA NA

0 0 0 25.65 1.539 3.078 NA NA

0 0 0 NA NA NA NA NA

0 0 0 NA NA NA 0 NA
0 0 0 0 0 0 NA NA

0 0 0 NA NA NA NA NA

0 0 0 NA NA NA 0 NA

0 0 0 0 0 0 NA NA

0 0 0 NA NA NA NA NA

0 0 0 NA NA NA 0 NA

0 0 0 NA NA NA NA NA
SCHEDULE

01/07/2020

02/07/2020

03/07/2020

04/07/2020

05/07/2020

06/07/2020

07/07/2020

08/07/2020

09/07/2020
S.No. Description of Work Qnty. Units. Days Start Date Finish Dtae

A MOBILIZATION
LOI AWARD FOR CONTRACT LS 2 1.6.11 2.6.11
1 SITE CLEARING Sq.M. 7 3.6.11 10.6.11 0 0 0 0 0 0
APPROVALS LS 7 6.6.11 13.6.11
2 SITE SURVEY, LINEOUT LS 4 14.6.11 17.6.11
B SUB - STRUCTURE
3 EXCAVATION FOR FOOTING Cu.M. 18 18.6.11 8.7.11
4 FOOTINGS
4a CONCRETE Cu.M. 12
4b PCC Cu.M. 4
4c FOAMWORK Sq.M. 4
4d REBAR KG. 3
5 COLUMN
5a CONCRETE Cu.M.
5b FOAMWORK Sq.M.
5c REBAR KG.
6 PLINTH BEAM
6a CONCRETE Cu.M.
6b FOAMWORK Sq.M.
6c REBAR KG.
7 PLINTH FILL Cu.M.
C SUPER - STRUCTURE
MAJOR MILESTONE
SMALLER MILESTONE
TASK
HOLIDAY
TOTAL
0
10/07/2020

11/07/2020

12/07/2020

13/07/2020

14/07/2020

15/07/2020

16/07/2020

17/07/2020

0
18/07/2020

19/07/2020
0

20/07/2020
0

21/07/2020
0

22/07/2020
0

23/07/2020
0

24/07/2020
0

25/07/2020

26/07/2020
0

27/07/2020
0

28/07/2020
0

29/07/2020
0

30/07/2020
0

31/07/2020
0

01/08/2020

02/08/2020
0

03/08/2020
0

04/08/2020
0

05/08/2020
0

06/08/2020
0
07/08/2020

0
08/08/2020

09/08/2020

0
10/08/2020

0
11/08/2020

0
0
12/08/2020

0
13/08/2020

0
14/08/2020

0
0
15/08/2020

16/08/2020

0
17/08/2020

0
18/08/2020
0

19/08/2020
0

20/08/2020
0

21/08/2020
0

22/08/2020

23/08/2020
0

24/08/2020
0

25/08/2020
0

26/08/2020
0

27/08/2020
0

28/08/2020
0

29/08/2020

30/08/2020
0

31/08/2020
0

01/09/2020

02/09/2020

03/09/2020
04/09/2020

05/09/2020

06/09/2020

07/09/2020

08/09/2020

09/09/2020

10/09/2020

11/09/2020

12/09/2020

13/09/2020

14/09/2020

15/09/2020

16/09/2020

17/09/2020

18/09/2020

19/09/2020

20/09/2020

21/09/2020

22/09/2020

23/09/2020

24/09/2020

25/09/2020

26/09/2020

27/09/2020

28/09/2020

29/09/2020

30/09/2020

01/10/2020
02/10/2020

03/10/2020

04/10/2020

05/10/2020

06/10/2020

07/10/2020

08/10/2020

09/10/2020

10/10/2020

11/10/2020

12/10/2020

13/10/2020

14/10/2020

15/10/2020

16/10/2020

17/10/2020

18/10/2020

19/10/2020

20/10/2020

21/10/2020

22/10/2020

23/10/2020

24/10/2020

25/10/2020

26/10/2020

27/10/2020

28/10/2020

29/10/2020
30/10/2020

31/10/2020

01/11/2020

02/11/2020

03/11/2020

04/11/2020

05/11/2020

06/11/2020

07/11/2020

08/11/2020

09/11/2020

10/11/2020

11/11/2020

12/11/2020

13/11/2020

14/11/2020

15/11/2020

16/11/2020

17/11/2020

18/11/2020

19/11/2020

20/11/2020

21/11/2020

22/11/2020

23/11/2020

24/11/2020

25/11/2020

26/11/2020
27/11/2020

28/11/2020

29/11/2020

30/11/2020

01/12/2020

02/12/2020

03/12/2020

04/12/2020

05/12/2020

06/12/2020

07/12/2020

08/12/2020

09/12/2020

10/12/2020

11/12/2020

12/12/2020

13/12/2020

14/12/2020

15/12/2020

16/12/2020

17/12/2020

18/12/2020

19/12/2020

20/12/2020

21/12/2020

22/12/2020

23/12/2020

24/12/2020
25/12/2020

26/12/2020

27/12/2020

28/12/2020

29/12/2020

30/12/2020

31/12/2020

01/01/2021

02/01/2021

03/01/2021

04/01/2021

05/01/2021

06/01/2021

07/01/2021

08/01/2021

09/01/2021

10/01/2021

11/01/2021

12/01/2021

13/01/2021

14/01/2021

15/01/2021

16/01/2021

17/01/2021

18/01/2021

19/01/2021

20/01/2021

21/01/2021
22/01/2021

23/01/2021

24/01/2021

25/01/2021

26/01/2021

27/01/2021

28/01/2021

29/01/2021

30/01/2021

31/01/2021

01/02/2021

02/02/2021

03/02/2021

04/02/2021

05/02/2021

06/02/2021

07/02/2021

08/02/2021

09/02/2021

10/02/2021

11/02/2021

12/02/2021

13/02/2021

14/02/2021

15/02/2021

16/02/2021

17/02/2021

18/02/2021
19/02/2021

20/02/2021

21/02/2021

22/02/2021

23/02/2021

24/02/2021

25/02/2021

26/02/2021

27/02/2021

28/02/2021

01/03/2021

02/03/2021

03/03/2021

04/03/2021

05/03/2021

06/03/2021
SCHEDULE RESOURCE

01/07/2020

02/07/2020

03/07/2020

04/07/2020

05/07/2020

06/07/2020

07/07/2020

08/07/2020

09/07/2020
S.No. Description of Work Qnty. Units. Days Start Date Finish Dtae

A MOBILIZATION 1.7.20 17.7.20


LOI AWARD FOR CONTRACT LS 2 1.7.20 2.7.20
1 SITE CLEARING Sq.M. 7 3.7.20 10.7.20 0 0 0 0 0 0
APPROVALS LS 7 6.7.20 13.7.20
2 SITE SURVEY, LINEOUT LS 4 14.7.20 17.7.20
B SUB - STRUCTURE 18.7.20 1.9.20
3 EXCAVATION FOR FOOTING Cu.M. 18 18.7.20 7.8.20
Skilled 18
Semi - Skilled
Un - Skilled

4 FOOTINGS 8.8.20 1.9.20


4a CONCRETE Cu.M. 12
Skilled
Semi - Skilled
Un - Skilled
Cement
Sand
Metal
4b PCC Cu.M. 4
4c FOAMWORK Sq.M. 4
4d REBAR KG. 3
5 COLUMN
5a CONCRETE Cu.M.
5b FOAMWORK Sq.M.
5c REBAR KG.
6 PLINTH BEAM
6a CONCRETE Cu.M.
6b FOAMWORK Sq.M.
6c REBAR KG.
7 PLINTH FILL Cu.M.
C SUPER - STRUCTURE

RESOURCE CALCULATION (LABOUR)


HIGH SKILLED (man days)
SEMI SKILLED (man days)
UNSKILLED (man days)
RESOURCE CALCULATION (MATERIAL)
CEMENT (bags)
SAND (cu.m.)
AGGRIGATE (cu.m.)
STEEL (M.tonn)
BRICK (nos.)

MAJOR MILESTONE
SMALLER MILESTONE
TASK
HOLIDAY
TOTAL
0
10/07/2020

11/07/2020

12/07/2020

13/07/2020

14/07/2020

15/07/2020

16/07/2020

17/07/2020

0
0
0
0
18/07/2020

19/07/2020

0
0
0
0

20/07/2020
0
0
0
0

21/07/2020
0
0
0
0

22/07/2020
0
0
0
0

23/07/2020
0
0
0
0

24/07/2020
0
0
0
0

25/07/2020

26/07/2020
0
0
0
0

27/07/2020
0
0
0
0

28/07/2020
0
0
0
0

29/07/2020
0
0
0
0

30/07/2020
0
0
0
0

31/07/2020
0
0
0
0

01/08/2020

02/08/2020
0
0
0
0

03/08/2020
0
0
0
0

04/08/2020
0
0
0
0

05/08/2020
0
0
0
0

06/08/2020
0
0
0
0
07/08/2020

0
08/08/2020

09/08/2020

0
10/08/2020

0
11/08/2020

0
0
12/08/2020

0
13/08/2020

0
14/08/2020

0
0
15/08/2020

16/08/2020

0
17/08/2020

0
18/08/2020

0
0
0
0
0
0
0
19/08/2020

0
0
0
0
0
0
0
20/08/2020

0
0
0
0
0
0
0

21/08/2020

0
0
0
0
0
0
0

22/08/2020

23/08/2020
0
0
0
0
0
0
0

24/08/2020
0
0
0
0
0
0
0

25/08/2020
0
0
0
0
0
0
0

26/08/2020
0
0
0
0
0
0
0

27/08/2020
0
0
0
0
0
0
0

28/08/2020
0
0
0
0
0
0
0

29/08/2020

30/08/2020
0
0
0
0
0
0
0

31/08/2020
0
0
0
0
0
0
0

01/09/2020

02/09/2020

03/09/2020
04/09/2020

05/09/2020

06/09/2020

07/09/2020

08/09/2020

09/09/2020

10/09/2020

11/09/2020

12/09/2020

13/09/2020

14/09/2020

15/09/2020

16/09/2020

17/09/2020

18/09/2020

19/09/2020

20/09/2020

21/09/2020

22/09/2020

23/09/2020

24/09/2020

25/09/2020

26/09/2020

27/09/2020

28/09/2020

29/09/2020

30/09/2020

01/10/2020
02/10/2020

03/10/2020

04/10/2020

05/10/2020

06/10/2020

07/10/2020

08/10/2020

09/10/2020

10/10/2020

11/10/2020

12/10/2020

13/10/2020

14/10/2020

15/10/2020

16/10/2020

17/10/2020

18/10/2020

19/10/2020

20/10/2020

21/10/2020

22/10/2020

23/10/2020

24/10/2020

25/10/2020

26/10/2020

27/10/2020

28/10/2020

29/10/2020
30/10/2020

31/10/2020

01/11/2020

02/11/2020

03/11/2020

04/11/2020

05/11/2020

06/11/2020

07/11/2020

08/11/2020

09/11/2020

10/11/2020

11/11/2020

12/11/2020

13/11/2020

14/11/2020

15/11/2020

16/11/2020

17/11/2020

18/11/2020

19/11/2020

20/11/2020

21/11/2020

22/11/2020

23/11/2020

24/11/2020

25/11/2020

26/11/2020
27/11/2020

28/11/2020

29/11/2020

30/11/2020

01/12/2020

02/12/2020

03/12/2020

04/12/2020

05/12/2020

06/12/2020

07/12/2020

08/12/2020

09/12/2020

10/12/2020

11/12/2020

12/12/2020

13/12/2020

14/12/2020

15/12/2020

16/12/2020

17/12/2020

18/12/2020

19/12/2020

20/12/2020

21/12/2020

22/12/2020

23/12/2020

24/12/2020
25/12/2020

26/12/2020

27/12/2020

28/12/2020

29/12/2020

30/12/2020

31/12/2020

01/01/2021

02/01/2021

03/01/2021

04/01/2021

05/01/2021

06/01/2021

07/01/2021

08/01/2021

09/01/2021

10/01/2021

11/01/2021

12/01/2021

13/01/2021

14/01/2021

15/01/2021

16/01/2021

17/01/2021

18/01/2021

19/01/2021

20/01/2021

21/01/2021
22/01/2021

23/01/2021

24/01/2021

25/01/2021

26/01/2021

27/01/2021

28/01/2021

29/01/2021

30/01/2021

31/01/2021

01/02/2021

02/02/2021

03/02/2021

04/02/2021

05/02/2021

06/02/2021

07/02/2021

08/02/2021

09/02/2021

10/02/2021

11/02/2021

12/02/2021

13/02/2021

14/02/2021

15/02/2021

16/02/2021

17/02/2021

18/02/2021
19/02/2021

20/02/2021

21/02/2021

22/02/2021

23/02/2021

24/02/2021

25/02/2021

26/02/2021

27/02/2021

28/02/2021

01/03/2021

02/03/2021

03/03/2021

04/03/2021

05/03/2021

06/03/2021

Вам также может понравиться