Вы находитесь на странице: 1из 10

SINGLE WELL FLOW LINE

AND ACCESSORY FACILITY


CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

CATHODIC PROTECTION SYSTEM


INSPECTION AND TEST PLAN

A ISSUED FOR APPROVAL Noor Q Mohammed SH

1|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

Rev. DESCRIPTION DATE PREP’D CH’D REV’D APP’D

Revision Summary

Rev# Date of Issue. Transmittal No. Status Description. Author. Authorizer.

2|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

TABLE OF CONTENT
1. APPROVAL OF THE DOCUMENTS/MATERIAL.......................................................................................... 4
2. CATHODIC PROTECTION SYSTEM............................................................................................................ 4

INSPECTION REPORT FOR MATERIAL RECEIVING........................................................................................ 6


INSPECTION REPORT FOR INSTALLATION OF ANODES...............................................................................7
INSPECTION REPORT FOR INSTALLATION OF REFERENCE ELECTRODES...............................................8
INSPECTION REPORT FOR INSTALLATION OF JUNCTION BOXES...............................................................9
INSPECTION REPORT FOR INSTALLATION OF TRANSFORMER RECTIFIER.............................................10

3|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

Responsibl Inspection
Activity Description of QC Verifying
References Acceptance Criteria e Party Level Remarks
No. Activity Document
RH/CN RH CN
1. APPROVAL OF THE DOCUMENTS/MATERIAL
Verify & ensure that Approved
construction Approved Drawing, Approved Drawing, Drawing,
drawings and Approved ITP, Approved ITP, Approved ITP,
1.1 RH H R
controlling Approved procedure Approved procedure and Approved
procedures are the and deliverable deliverable procedure and
correct revision deliverable
Material Receiving
Inspection & test
Approved Drawing,
Certificate Review Material Site
Approved Drawing, Approved ITP,
1.2 (Cable, anode, RH H R Acceptance Vendor
Approved ITP Approved procedure and
Junction Box , Report
deliverable
rectifier&
Transformer )
2. CATHODIC PROTECTION SYSTEM

CILBCFQ-710-PCC-15.03- CILBCFQ-710-PCC-15.03-
Inspection
10001_0_SPECIFICATION 10001_0_SPECIFICATION
Installation & Testing report for
2.1 FOR CATHODIC FOR CATHODIC RH H R
of Anodes and cables installation of
PROTECTION OF BURIED PROTECTION OF BURIED
anodes
PIPELINE PIPELINE
Installation & Testing CILBCFQ-710-PCC-15.03- CILBCFQ-710-PCC-15.03- Inspection
2.2 of Reference 10001_0_SPECIFICATION 10001_0_SPECIFICATION RH H R report for
Electrodes FOR CATHODIC FOR CATHODIC installation of

4|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

Inspection
Responsibl
Activity Description of QC Level Verifying
References Acceptance Criteria e Party Remarks
No. Activity PROTECTION OF BURIED PROTECTION OF BURIED Document
reference
RH/CN
PIPELINE PIPELINE electrodes
CILBCFQ-710-PCC-15.03- CILBCFQ-710-PCC-15.03-
Inspection
Installation of 10001_0_SPECIFICATION 10001_0_SPECIFICATION
report for
2.3 Junction Boxes and FOR CATHODIC FOR CATHODIC RH H R
installation of
cables PROTECTION OF BURIED PROTECTION OF BURIED
junction boxes
PIPELINE PIPELINE
CILBCFQ-710-PCC-15.03- CILBCFQ-710-PCC-15.03- Inspection
Installation of 10001_0_SPECIFICATION 10001_0_SPECIFICATION report for
2.4 Transformer Rectifier FOR CATHODIC FOR CATHODIC RH H R installation of
and cables PROTECTION OF BURIED PROTECTION OF BURIED transformer
PIPELINE PIPELINE rectifier

5|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

INSPECTION REPORT FOR MATERIAL RECEIVING

DRAWING/SPECIFICATION NO FORM.
RFI No.
Date
MATERIAL : UOM: QTY:

DESCRIPTION COMPLIANCE REMARKS


Preparation for Relevant Document (Product Data Sheet/
Cataloged, Approved Design Drawings, Material test, etc)

Quantity

Packing Condition

Damage for Contents

Good Protection

Condition of Preservation Area(Indoor)

Condition of Preservation Area(Outdoor)

Others :

NOTES :

REPRESENTATIVE  CONTRACTOR COMPANY


Name

Signature

Date

6|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

INSPECTION REPORT FOR INSTALLATION OF ANODES

DRAWING/SPECIFICATION NO. : Form No.


RFI No.
Date
DISCIPLINE : PAGE OF

Item # Description CONTRACTOR COMPANY

Check and verify the anode are free from scratches


and damages

Check the spacing between anodes and bars

Check proper spot welds on anodes

Check backfilling is not damaging the cables

Check the resistance of anode system prior to final


backfilling

Initial performance check of anode

Final Performance Check of anode


NOTES :

REPRESENTATIVE  CONTRACTOR COMPANY


Name

Signature

Date

7|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

INSPECTION REPORT FOR INSTALLATION OF REFERENCE ELECTRODES

DRAWING/SPECIFICATION NO. : Form No


RFI No.
Date
DISCIPLINE : PAGE OF

Item # Description CONTRACTOR COMPANY


Check and verify the Electrodes are free from scratches
and damages
Check the location of reference electrodes against
approve for construction drawings
Check proper saturation of reference electrode with
water
Check Installation of proper number of reference
electrodes
Check final routing of reference electrodes cables
Final phase of backfilling commencement ensuring no
damage of reference electrodes and cables
Check proper functionality of reference electrodes after
completion of backfilling activities
REFERENCE ELECTRODE TESTING
Reference Electrode
Testing of electrode mV
Location

NOTES :

REPRESENTATIVE  CONTRACTOR COMPANY


Name
Signature
Date

8|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

INSPECTION REPORT FOR INSTALLATION OF JUNCTION BOXES

DRAWING/SPECIFICATION NO. : Form No


RFI No.
Date
DISCIPLINE : PAGE OF

Item # Description CONTRACTOR COMPANY

Check and verify the junction boxes are free


corrosion and other damages

Check the location and orientation of junction boxes

Check the installation height and alignment of


junction boxes
Check and verify the junction box name plates are
fixed properly for correct identification
Check proper termination of cables with correct
identification tags
Check all cables inside the junction box are neatly
tied with cable ties
NOTES :

REPRESENTATIVE  CONTRACTOR COMPANY


Name

Signature

Date

INSPECTION REPORT FOR INSTALLATION OF TRANSFORMER RECTIFIER

9|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. Document No.
ITP For Cathodic protection
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-PCC-00.03-0004

DRAWING/SPECIFICATION NO. : Form No


RFI No.
Date
DISCIPLINE : PAGE OF

Item # Description CONTRACTOR COMPANY


Check and verify Transformer Rectifier are free
from corrosion and other damages
Check and verify all the instrumentation in
transformer rectifier are free from damages
Check the location and orientation of Transformer
Rectifier
Check and conducting is properly done with bushes
fitted for protection against cable damages
Check the connection of cables
Check and verify the proper grounding is done as
per the project specification
Check proper termination of cables with correct
identification tags
Check all the cables inside the Transformer Rectifier
are neatly tied with cable ties
NOTES :

REPRESENTATIVE  CONTRACTOR COMPANY


Name
Signature
Date

10 | P a g e